An L Shaped Walk in Wardrobes scheme can look finished on a rendering long before anyone has checked whether the corner will actually open, whether the ceiling can carry a hanging rail, or whether the doors clear a floor-to-ceiling glass panel. That is why the installation plan matters more than the drawing. On the villa and apartment projects we supply built-in furniture for, the walk-in wardrobe is one of the few joinery items where a measurement error cannot be corrected on site: panels are made to measure, shipped by container, and fixed once the surrounding finishes are complete.

Below is the checklist we work through with architects, contractors and owners before a bespoke L-shaped walk-in wardrobe goes into production, based on how our built-in furniture range is specified and delivered.

1. Measured drawings that record the corner, not just the wall lengths

Two walls meeting at right angles are rarely square once tiling, plasterboard and skirting are in. The plan should show:

  • finished-wall dimensions on both legs of the L, taken after wall finishes rather than structural dimensions;
  • the actual included angle at the corner, plus out-of-plumb readings at floor and ceiling level;
  • floor-to-ceiling height at several points, because slab and screed levels vary across a room;
  • the position of every door opening, window reveal, air-conditioning grille, switch, socket and light point that falls within the joinery zone.

Where the wardrobe abuts a Wall Panel Systems wall or a decorative panel, note which material is installed first and who trims the reveal. Settling that sequence at this stage stops an installer arriving to find the panel already fixed with no allowance for the carcass.

2. Circulation and clearance figures

A walk-in is a room you stand in, so the plan must prove that people can move through it while doors, drawers and hanging garments are in use. Record:

  • the aisle width between opposing runs of carcases;
  • the swing or slide envelope of the entry door and of any Glass Sliding Door Wardrobes frontage, including track depth;
  • drawer pull-out projection, so a tall drawer in the corner leg does not foul the opposite run;
  • the turning space at the inside of the L, where an elbow of hanging rails is most likely to be blocked.

Put these figures on the plan as dimensions. Do not leave them to the installer's judgement.

3. Internal zoning agreed before any panel is cut

The L shape splits naturally into three working zones: long leg, short leg and corner. Each takes different fittings. Set out in the plan:

  • long-hang and short-hang areas, with rail heights stated as finished internal dimensions;
  • shelf runs, with spacing sized for the items actually stored rather than a uniform grid;
  • drawer banks and their direction of opening;
  • shoe, luggage and seasonal storage, including the depth needed for cases stored flat;
  • open display niches or an Open Walk in Wardrobes section, where lighting and dust protection have to be resolved together.

Our L-shaped walk-in wardrobes are made to measure, with material and finish options and a layout tailored to the project. Zoning changes cost nothing at this stage and become expensive once drawings are signed off.

4. Corner treatment: the decision that defines the whole plan

Corner optionWhat the plan must show
Diagonal carcase bridging the two legsDiagonal face dimension, rail position behind it, and the access path for the tallest hanging item.
Two runs butted with a shared uprightWhich run is continuous, where the scribe line falls, and how shelves are cut back at the return.
Rotating or pull-out corner fittingsFitting make and model fixed before production, plus the clear internal radius and load rating it requires.
Open corner display with lightingDriver position, cable route, and access for lamp replacement after handover.

Whichever option you choose, state it on the drawings. A corner left as a "site detail" is where walk-in wardrobe projects most often go wrong.

5. Services, lighting and electrical coordination

Walk-in wardrobes concentrate services that are easy to miss on a joinery drawing:

  • lighting in niches, above rails and inside drawers, with switch or sensor positions that still work once the layout is built;
  • transformer and driver locations, kept reachable for maintenance rather than sealed behind a panel;
  • power for a steamer, ironing drawer, safe or charging station;
  • extract air or an air-conditioning diffuser serving the room, positioned so it does not blow across hanging garments;
  • for glass-fronted sections, fixing details that do not point-load the glazing.

Dimension every one of these against the carcase elevations. Our interior design service covers this coordination as part of drawing and production liaison, including guidance on site.

6. Materials, finishes and the surfaces they sit against

Name every surface in the plan, because finish choices drive both price and tolerances:

  • carcase and door material with the selected finish referenced by code, for example Natural Oak Veneer Wardrobes or Matte Acrylic Wardrobes;
  • edge treatment and grain direction on doors that meet at the corner;
  • the wall finish behind the carcase, and whether the wardrobe is fixed to it or framed clear of it;
  • floor finish and threshold detail, which decides whether plinths are scribed or raised;
  • adjacent joinery such as vanities, custom built-in kitchen cabinets or media walls, so handles, reveals and shadow gaps read consistently through the project.

Where a project needs bespoke finishes, textures or branding, our Custom & OEM service covers design and prototyping alongside material selection.

7. Structural fixing and load assumptions

A floor-to-ceiling L-shaped run carries substantial hanging loads across a long span. The plan should record:

  • the substrate behind each fixing line: masonry, framed partition, or timber blocking;
  • where the builder must add noggings or blocking, with positions marked on the wall setting-out drawing;
  • the fixing method for ceilings that cannot take a load, and whether an independent frame is needed;
  • point loads from glass doors, stone shelf tops and heavy drawer banks.

Agree blocking positions before the builder closes up the walls. Doing it afterwards means openable chases and repainted finishes.

8. Delivery route, handling and site readiness

Made-to-measure panels are long, heavy and awkward to move through a finished site. The installation plan should include:

  • the path from kerb to room: lift dimensions, stair turns, door widths and corridor restrictions;
  • packaging and container loading arranged so panels arrive in the order they are installed;
  • a pallet storage area on site, kept dry and off the floor;
  • the date by which painting, flooring, tiling and glazing must be complete, since built-in joinery goes in after the wet trades.

For international projects we arrange freight by sea, air or rail with the associated customs paperwork and door-to-door delivery, so the site-readiness date has to be locked into the programme alongside the production schedule.

9. Installation sequence and handover record

The final section of the plan is the one most often left blank: who does what, in what order, and how completion is recorded.

  • a survey re-check on site immediately before installation, measured against the as-built finishes;
  • carcase assembly, alignment and fixing, then doors and drawers, then hardware adjustment;
  • electrical connection and lighting commissioning after the joinery is fixed;
  • a snag list signed off with the contractor or the owner's representative;
  • spare panels, hardware and finish samples handed over for future maintenance.

Our installation and after-sales support covers on-site fixing, inspection with the client's team, spare parts and ongoing maintenance. Warranty terms and response arrangements are confirmed project by project rather than assumed.

Sign-off checklist before production release

  • Finished dimensions taken after wall, floor and ceiling finishes are complete.
  • Corner treatment selected and drawn, not deferred to site.
  • Aisle widths and door swing envelopes dimensioned on plan.
  • Internal zoning confirmed with the end user, including rail and shelf heights.
  • Lighting, drivers, sockets and extract positions dimensioned against elevations.
  • Blocking and substrate confirmed with the builder in writing.
  • Finish codes, edge treatment and grain direction recorded on the drawing sheet.
  • Delivery route checked against lift, stair and door clearances.
  • Site-readiness date agreed and inserted in the project programme.
  • Snag and handover procedure named, with responsibilities assigned.

SANTERSON has manufactured furniture and building materials since 2008 and supplies bespoke built-in joinery for villa, hotel and office projects, from measurement and detailing through production, logistics and installation. Send us the room's measured drawings and the finishes you are working to, and we will return a detailed L-shaped walk-in wardrobe proposal with elevations, material specification and a delivery plan. Enquiries: https://www.santerson.com/contact/