A swim spa sits at an awkward point in most project documentation. It is too technical for the furniture schedule and too small to attract the attention of the structural or civil package, so it usually lands in a single line of the bill of quantities with no supporting information. When the quotation comes back three weeks later with six questions, the programme slips. Writing the model into the brief properly from the start — Outdoor Swim Spa WS-PC06ST in this case — is the cheapest schedule protection available on a villa, resort or hospitality scheme.

The note below sets out what a procurement brief for this model should actually contain, and which details genuinely change the price, the delivery method and the site works. It follows the way we handle swim spa enquiries as a one-stop furniture and building materials supplier, where the spa, the surrounding decking, the outdoor furniture and the interior fit-out are coordinated by one team rather than handed to four separate contractors.

Start with the model code, not the word "spa"

"Spa" covers everything from a two-seat hot tub to a lap-length counter-current unit, and suppliers quote against whatever they assume you meant. In our swimming pool range the codes carry meaning, so write the exact one: WS-PC06ST sits alongside WS-PC06ST-L and WS-PC06CH, which are different units with different footprints, seating layouts and equipment sets. The same applies across the PC series — WS-PC05ST, WS-PC07ST and WS-PC08ST each come in short and long variants, and a suffix such as -S or -L is what tells the factory which shell to build.

If your brief names only "a swim spa of about six metres", expect a quotation for something that does not match the drawing. Put the model code in the schedule, then state in plain words how the space is meant to be used: daily laps, resident recreation, guest hydrotherapy, or a marketing feature on a resort terrace. Those four uses drive different equipment selections, and they are the difference between a unit that works and one nobody swims in.

Give the shell dimensions against the real envelope

The single most common cause of rework is a spa specified before the deck line, boundary setback and access route are fixed. In the brief, record:

  • The clear internal rectangle available after finishes, not the nominal plot size.
  • Whether the unit is fully above ground, semi-recessed into a deck, or sunk with a surround at finished floor level.
  • The width of every gate, corner and stair the shell has to pass through on delivery day — including the lift or crane path for an upper terrace.
  • Where the plant access panel will sit once the decking is laid, and who will be standing there in year three.

A spa that fits the plan but cannot be carried to the plan is a demolition project, not a purchase. If the site is tight, say so in the brief and ask whether an alternative in the range solves it — WS-PC05ST-S and other compact codes exist precisely for constrained terraces.

Specify the swim and hydrotherapy functions by use, not by count

Marketing sheets list jet counts; buyers need to know what the space is doing. Our longer units combine a counter-current swimming station with a separate hydrotherapy seating area — see the Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool and the Luxury Outdoor Swim Spa with Massage Jets, LED & Water Features. In a brief, describe each zone:

  • Swim station: what the swimmer needs — a steady current to hold a stroke against, enough water length to turn in, and whether more than one person swims at once.
  • Hydrotherapy zone: seating position, jet focus (shoulders, lower back, legs) and how deep the seats sit, since these decide who can use it comfortably.
  • Water features and lighting: whether LED colour, a waterfall or a spillover edge is required, and whether the feature is switched separately from the pumps.

For a hotel or clubhouse, also state whether the unit is supervised, what the daily guest volume looks like, and whether it needs to be usable in winter. Those answers change the insulation package, the filtration duty and the control interface — and they are far easier to price up front than to add after production has started.

Treat services as a separate line you must close

The spa is manufactured complete; the supply of power, water, drainage and structure around it is local work. A brief that does not draw that boundary produces disputes on site. Record who provides:

  • An appropriately rated dedicated circuit with the required protection, run from the switchboard by the local electrical contractor.
  • A fill supply, and a drainage route to an approved point for drainage and periodic cleaning.
  • The load-bearing base — slab or structural platform sized for the filled weight plus occupants, designed by the local engineer.
  • Any screening, decking, pergola or shading around the unit. Our motorized louvered aluminium pergola and poolside collections are frequently paired with these units so the spa, shade and loungers share one material palette.

Do not let the local builder guess at the base. Ask for the filled weight and support point layout from us in writing and hand it to the structural engineer as a design input; that one document exchange removes most of the risk on the civil side.

Coordinate the spa with the rest of the outdoor palette

A swim spa rarely fails on its own merits; it fails aesthetically because the decking, planters and loungers were bought from three suppliers in three different tones. Where the project already uses our outdoor furniture — aluminium sling sun loungers, a rope weave lounge, or a cabana daybed with canopy — put the spa in the same specification package and ask for matching finishes. As a swimming pool and outdoor range produced by a China-based furniture and building materials manufacturer, we can align frame colours, teak-look surfaces and hardware across the terrace so one approval covers all of it.

State the delivery and after-handover terms you need

Our logistics and door-to-door delivery service covers freight forwarding, export paperwork, packing and container loading, with delivery arranged to the site. For a swim spa the brief should fix:

  • The Incoterms and whether the quoted price includes duties, clearance and inland transport.
  • Whether offloading equipment and a crane are on the supplier or the contractor.
  • The delivery window against the deck and landscaping programme — a spa delivered before the slab cures is just an expensive storage problem.
  • Commissioning support, spares and warranty terms, as set out under installation and after-sales support. Ask for the written scope rather than assuming it.

Where a project needs a different shape or size, we also work to bespoke configurations — see Customizable Shape Outdoor Spa, Personalized Hydrotherapy Pool. Send the drawing early: shape changes affect the mould, and mould decisions belong at concept stage.

A quick check before you issue it

  • The exact model code appears in the schedule, with the variant suffix.
  • Clear envelope, access route and installation method are stated with dimensions.
  • Swim and hydrotherapy use is described in words, not just jet counts.
  • Power, water, drainage and structural base are assigned to a named party.
  • Surrounding finishes and furniture are in the same package for one approval.
  • Incoterms, offloading, commissioning and warranty scope are written down.

Six lines of discipline in the brief save weeks of correspondence later. If you are putting together a procurement package that includes WS-PC06ST or another code in the range, send us the plan and the use case and we will return a specification sheet, the support-point information your engineer needs, and a quotation built around your programme — through our contact page.