A set of grey matte cabinets can look flawless in the drawing and still fail on site. The usual reason is not the cabinetry itself but a missing plan: nobody fixed who measures, who signs off the finish sample, where the units are stored before hanging, or who answers when a panel arrives chipped. Before production starts, an installation plan should answer those questions in writing.

1. Site conditions and verified dimensions

Grey is a finish that exposes uneven walls more than it exposes poor joinery. A gap behind a scribed panel reads as a workmanship fault even when the carcass is perfectly square. The plan should therefore start with field verification, not shop drawings.

  • Record finished floor levels and finished wall faces, and note where the two are out of square along each run.
  • Mark the positions of water outlets, waste pipes, switch plates, sockets and any ducted services that cabinet fixings or cut-outs may cross.
  • Confirm ceiling height at both ends of a full-height run before tall units are drawn to a single nominal dimension.
  • State who re-measures after the final wall and floor finishes are complete, and what tolerance the site team allows for packing and scribing.

For custom work such as our Grey Matte Cabinets, sizing, layout and finish options are specified per project, so the second set of measurements is what production actually works from. Schedule that re-measure as a named milestone with a date, not as an assumption.

2. A signed finish and construction sample

"Grey matte" covers a wide range of tones and sheens. Under kitchen task lighting a cool grey can read almost blue, and under warm downlights the same panel turns greige. The plan should include one approved physical sample that stays on site as the reference for every door and panel delivered.

  • Approve the sample in the room where the cabinets will be installed, at both day and night lighting conditions.
  • Check the direction of any grain or texture on the matte surface, and confirm how doors are to be laid out so the pattern runs consistently across the kitchen.
  • Agree which face is the visible face for return panels, and how edges and handles or handleless profiles are finished.
  • Keep the signed sample until handover; it is the reference used to settle any colour dispute at completion.

Where a project mixes finishes, for example matte grey fronts with a two tone matte island or with handleless matte fronts elsewhere, sample both and record which drawing reference each one belongs to.

3. Sequencing against the other trades

Cabinets sit in the middle of a fit-out, which makes them the trade everyone blames for delay. The plan should show where cabinetry falls relative to wet-area waterproofing, tiling, plaster set-out, electrical first fix and benchtop templating.

StageWhat must be locked before cabinets arrive
Services first fixAppliance schedule confirmed, so cut-outs, ventilation clearances and power positions match the selected units.
Wall and floor finishesTiling and flooring complete to the cabinet line, with setting-out agreed where tiles meet panels.
Delivery windowDry, secure storage on site, plus a clear path from the lift or kerb to the kitchen that does not cross wet trades.
BenchtopsBase cabinets levelled and fixed before templating, so stone cut-outs follow the installed geometry.

For projects sourced across borders this sequencing has to be built around shipping rather than around a local supplier's lead time. Our logistics and door-to-door delivery service covers freight forwarding, packaging and container loading, customs paperwork and tracking, so the plan should state the port or site delivery point, who receives the containers, and how long the site can hold them before installation begins.

4. Handling, storage and protection on site

A matte surface shows handling marks long before it shows wear. Installers should be told in advance how the panels are to be moved and protected, because damage found on the day of installation cannot be replaced within the programme.

  • Store panels flat and dry, off the floor, away from curing concrete or paint that adds moisture to the air.
  • Keep doors and drawer fronts in their labelled cartons until they are hung, so the set-out sequence survives a busy site.
  • Protect installed fronts with removable covering while other trades finish the room, and prohibit adhesive tape on matte surfaces.
  • Handle hinged doors by the frame edge rather than pressing into the panel face when carrying them.

5. Installation method and fixing details

Write down how the units are supported, because that decision is invisible once the kitchen is complete and it determines whether the run stays level years later.

  • Confirm the substrate behind the wall rails or battens, and the fixing type suitable for it, especially on stud or tiled walls carrying tall units.
  • Level base runs to a laser line along the whole kitchen rather than unit by unit, so doors align across corners.
  • Set door gaps and hinge adjustment before benchtops are templated, then re-check after the stone is in.
  • Record how integrated appliances are vented and how drawer runners and soft-close hardware are adjusted at final handover.

If you want guidance on site conditions before ordering, our design and production team can review drawings as part of custom and OEM service, and installation arrangements are covered under installation and after-sales support. Ask us to confirm the fixing details, warranty terms and service scope for your specific project rather than assuming a standard applies.

6. Snag list, responsibilities and handover

Close the plan with an inspection that has names against it. A snag list written by one person on one afternoon is worth more than a verbal walkthrough at handover.

  • Named site contact for measurements, delivery receipt and snag sign-off.
  • Agreed replacement route and lead time for any damaged or missing panel.
  • Photographic record of the completed run before other trades return to the room.
  • Care instructions issued with handover, covering which cleaners are safe on a matte finish.

Warranty terms, response times and installer arrangements vary by project and region. Confirm them in writing for your job; the figures published in marketing material should not be read as guaranteed service levels.

The short version

An installation plan for grey matte cabinets needs six items: verified site dimensions taken after final finishes, one signed finish sample held on site, a trade sequence with dates, handling and storage rules that protect a matte surface, written fixing and levelling method, and a snag list with named responsibility. Missing any one of them shifts the cost of the problem onto whoever discovers it last.

SANTERSON has supplied custom cabinetry and interior fixtures for villa and hospitality projects since 2008, working as a one-stop furniture and building materials supplier from design and production through to delivery and site coordination. Send us your drawings and site conditions and we will confirm dimensions, finish options and what the installation plan needs to cover for your kitchen.