A motorized louvered pergola is one of the few outdoor structures that can be specified, engineered and shipped as part of a wider project package. Before we can price ours, we need a short set of decisions from you: how big it is, where it stands, how it opens and what accessories sit with it. This guide walks through exactly what to send so your quotation comes back accurate the first time — no guesswork on our side, no surprises on yours.
Start With the Product Page You Are Quoting
Our Motorized Louvered Aluminum Pergola with LED Strip & Zip Screens is a bioclimatic structure: the aluminium louvers rotate, so you adjust the microclimate underneath rather than simply shading it. Closed, the roof sheds light rain; open, it lets air and daylight through. Built-in LED strips run along the frame, which removes the need for separate surface-mounted fixtures, and zip screens can be fitted on any side to cut low sun, block breeze and add privacy without fully closing the space in.
That combination is why it keeps appearing in resort terraces, rooftop bars, spa decks and villa poolsides. It is also why a quote request that only says "one pergola, 4 x 3 m" cannot be answered properly — the louvers, lighting and screens are all separate specification lines.
What to Send in Your Enquiry
Send these items together and we can move straight to a costing instead of a round of clarifying questions.
- Bay dimensions and layout. Overall length, width and clear height, plus whether the structure is freestanding or fixed against a wall or building face. Tell us the number of bays if you are covering a long terrace in modules.
- Fixing condition. Concrete slab, deck, pavers, rooftop membrane or planter edge. This drives the base detail and what your local contractor prepares on site.
- Frame colour. We make frames in a dual-colour finish, so specify the exterior colour and the underside colour separately if they differ, and note any matching requirement to existing joinery or balustrades.
- Control preference. Where the motor and control sit, and whether you want wall control, remote control or integration into a building management system. Send your electrical supply details for the destination country.
- LED strip requirement. Length of run, colour temperature, and whether dimming is required. If your design already shows a lighting layout, attach it.
- Zip screens. Which sides, drop height, and the openness or transparency you want — full shade, filtered light, or privacy with a view retained.
- Quantity and site locations. One villa terrace and twelve hotel villas are priced and packed very differently.
- Delivery terms and destination. Port or door-to-door address, and your preferred Incoterms. We arrange freight by sea, air or rail with the customs paperwork handled on our side.
Drawings help but are not essential. A marked-up plan, a reference photo of the position, or even a sketch with dimensions is enough for us to start. If you have a mood board or an architect's elevation showing how the pergola should read against the facade, include it — colour and proportion decisions get resolved much faster.
How We Turn Your Enquiry Into a Quotation
Once the enquiry is complete, our team confirms the specification line by line: bay size, frame profile, louver mechanism, motor and control, LED run, screens and finishes. You receive an itemised quotation rather than a single lump figure, so you can see where each element sits in the cost and adjust scope without losing the design intent.
After you approve details, we move to production. Because this is a made-to-order product, dimensions, frame colour and screen transparency are all set to your drawings — nothing is cut to a stock size and trimmed on site. As part of our Custom & OEM Service, we also handle prototyping and bespoke finishes when the project calls for them.
Coordinating the Pergola With the Rest of the Outdoor Package
In most projects the pergola is not bought alone. It sits above dining tables, loungers and daybeds, and it shares a colour palette with the building's cladding and joinery. We supply outdoor furniture for villas and resorts and building and construction materials from the same factory, so frames, tops and finishes can be matched across the terrace instead of being reconciled after the fact by three different vendors.
If your project needs the whole scope handled — design coordination, production, freight, installation and after-sales — our Turnkey Solutions cover villa, hospitality and office work end to end. That is usually the more efficient route when outdoor structures, furniture and finishes all have to arrive on one programme.
Questions Buyers Ask Before Committing
Can the roof really keep rain out? With the louvers fully closed the roof forms a watertight cover against light rain. For exposed sites with driving wind and heavy weather, tell us the exposure — we will advise on orientation and screen configuration rather than promise performance the site will not support.
Can screens be added later? Yes, but it is better to specify them at quotation stage. The side fixings and drop are engineered into the frame, so retrofitting means a different detail.
Who installs it? We ship with assembly documentation and provide installation support; on turnkey projects our team coordinates on site. Site preparation — foundations, slab, electrical first fix — is normally handled by your local contractor to the dimensions we issue.
What about compliance paperwork? Send us the requirements from your certifier or architect and we will confirm in writing which documents we can provide for your specific project before production starts.
Ready For a Price
Send dimensions, fixing condition, frame colour, control preference, LED requirement and screen positions to our contact page, or reach us directly on WhatsApp at +86-13928214007. Quote PHILLIP as the contact and attach any drawings you have. We reply with an itemised quotation, and if anything is missing we will name exactly what we need rather than quoting a guess.