A glass-front wardrobe looks simple on a drawing. Framed glass, clean lines, a run of hanging space behind it. The part that decides whether it lands well on site is not the elevation — it is the plan written before the panels are cut. Glass modular wardrobes are made to measure for each project, so an installation plan has to carry everything the fitter needs: verified openings, floor and ceiling conditions, hardware decisions, sequence of works and the points where glass meets the rest of the room.

Start with measured openings, not design drawings

Our Glass Modular Wardrobes are made-to-measure, with finish, layout and dimensions specified per project. That means the numbers on a design drawing are only a starting point. A plan worth sending to the factory records what the opening actually measures at the site it will be built into.

  • Width, height and depth taken at several points across each opening — floor to ceiling in at least three positions, not one.
  • Plumb and level checks on the walls and floor the carcass will sit against, with the out-of-tolerance readings written down rather than assumed away.
  • Skirting, cornices, architraves and any existing joinery that must be removed, scribed around or matched to.
  • Fixed obstructions: switch plates, power points, air grilles, downlights, sprinkler heads, door swings and drawer clearance paths.

Where the run turns a corner or wraps past a doorway, note which leg is built first and how the scribe panel is handled. Those decisions change the panel sizes, so they belong in the plan before production, not in a message to the factory the week before shipment.

Record the glass and frame specification you are installing

Glass reads differently depending on what sits behind it. A clear panel shows the interior layout, hanging rails and whatever is stored inside; a frosted or smoked panel hides that and changes how much light reaches the room. The installation plan should state the glazing type, frame finish and handle style for every elevation, so the person on site is not matching finishes by eye at handover.

  • Glazing choice per door: clear, frosted, smoked or ribbed, and whether any panel is mirror.
  • Frame finish and profile — a slim aluminium frame behaves differently from a full-panel hinged door when it comes to alignment and adjustment range.
  • Opening method per bay: sliding, hinged or open. Sliding runs need track levels and overlap tolerances; hinged doors need swing clearance and consistent reveal.
  • Interior configuration by bay — hanging rails, shelves, drawers, lighting — because the interior build has to be complete before glazing goes on.

If the scheme mixes materials, list where glass stops and a solid panel begins. A framed glass wardrobe beside a closed melamine or lacquer run needs the transition detail drawn, along with how the two finishes meet at the reveal.

Confirm the substrate conditions the glass depends on

Glass is unforgiving of a frame that has moved. Sliding doors bind if the track is out of level; hinged glass doors drop out of alignment if the carcass settles or the wall fixings are under-specified. The plan should name who prepares the room and what "ready" means before any panel arrives.

Condition to confirm Why it matters for glass fronts
Floor level across the full run Sliding tracks and bottom rails are set from this. A fall along the run shows up as doors that drift or rub.
Wall plumb and fixing substrate Fixings must reach solid framing or the correct anchor for the wall type. Packing alone will not hold a glass-front carcass square.
Ceiling line and any recess Determines whether the run is scribed to the ceiling, built with a top panel, or detailed as a floating unit.
Wet-area proximity Ensuite and wardrobe-adjacent bathrooms need the finish and edge detailing agreed for humidity exposure before ordering.
Services set out and tested Integrated lighting needs wiring, drivers and access points in place before glazing; retrofitting means removing glass.
Wet trades finished and dry Paint, tile adhesive and screed should be cured so moisture and dust are not trapped behind sealed panels.

Write the tolerances into the plan as numbers. "Level within an acceptable range" is a sentence that causes rework; a stated maximum deviation for the track line, checked with a laser before fixing, is something a site team can actually work to.

Set the sequence and access plan for delivery

Modular components arrive as panels, frames, tracks, hardware and glass. Where they land and how they reach the room is part of the installation plan, especially on apartments and multi-level villas.

  • Route from the delivery point to the room: lift dimensions, stair widths, corridor turns, and whether full-length panels physically fit.
  • Storage location that is dry, level and safe for glass — not a shared landing under other trades' materials.
  • Build order: carcass and interior first, alignment and door adjustment next, glazing last where the sequence allows.
  • Trade exclusions on site: who protects adjacent finishes, who removes packaging, who cleans glass after fitting.
  • Protection through to handover, so fitted glass is not scored by later trades or left with adhesive residue.

For projects where we handle on-site installation and after-sales support, the same document becomes the briefing for the fitting team. For self-managed installs, it is what your local fitter should be quoting against, so scope gaps do not appear as variation claims.

Include the sign-off items people forget

Handover disputes are rarely about the wardrobe itself; they are about what was never written down. Add these to the plan and have them checked before the job is called complete.

  • Door-by-door adjustment check: alignment, reveal consistency, smooth travel on every sliding bay, soft-close behaviour where fitted.
  • Glass inspection under raking light before protection goes back on, with any transit or fitting damage logged on the day.
  • Hardware spares handed over — spare rollers, handles, keys for locked bays — listed on the delivery note.
  • Care and cleaning instruction for the specific glazing and frame finish supplied.
  • Snag list with named responsibility and dates, closed out before final handover.
Scope note: warranty terms, response times and installer arrangements vary by project and region. Confirm them for your specific order rather than relying on general website statements, and record the agreed scope in the same plan document you use for measurement and fitting.

Plan the wider fit-out around the wardrobe run

Wardrobes rarely sit alone. In a villa or apartment fit-out they align with wall panelling, doors and vanities, so the wardrobe plan should be cross-referenced with the other joinery packages rather than issued as a standalone drawing. A glass walk-in wardrobe that shares a wall with panelling, or a run that turns into an entryway unit, needs one coordinated set of levels and reveals across all three trades.

Our custom and OEM service covers bespoke finishes, textures and dimensions, so the plan can carry a finish schedule that matches what is specified elsewhere in the project. Sent through logistics and door-to-door delivery, the same measured package arrives as one coordinated shipment instead of parts tracking from three suppliers.

Send us the opening dimensions, glazing and finish choices, and the site conditions you have already checked, and we will return a made-to-measure proposal with the fitting sequence built in — so the plan is settled before the first panel is cut. Contact SANTERSON to start the specification.