A full-height media wall looks simple on a rendering and complicated on site. It spans floor to ceiling, carries a television, hides cabling, mixes open display with closed storage, and has to line up with the joinery, wall panelling and flooring around it. That is exactly why Santerson Full Height Media Walls should be documented as a project-specific system rather than ordered like a loose cabinet.

Every full-height media wall in this collection is made to the space: finish, layout and dimensions are specified per project, and the product page itself asks buyers to confirm dimensions and storage configuration for each project. The documentation you send us therefore decides how accurate the drawing, the quotation and the production file will be.

What the collection actually covers

Full Height Media Walls sit inside our Media & TV Walls range for residential wall systems. Alongside them we list Santerson Wall Mounted Media Walls, Santerson Integrated TV Panels, Santerson Sliding Panel TV Systems and Santerson Backlit Feature Walls. Freestanding and wall-hung alternatives such as Santerson Freestanding TV Cabinets and Santerson Integrated LED Media Units are catalogued separately, which matters when a room needs the media wall to stop short of the ceiling.

Because these are configurable systems rather than fixed SKUs, a purchase order that only says "one media wall, walnut" cannot be turned into production drawings. The five documentation blocks below are what we need in writing.

1. Room data and the wall itself

  • Wall width, height and the finished floor level, stated as clear dimensions after flooring and ceiling finishes are installed.
  • Whether the media wall runs floor to ceiling, or stops at a bulkhead, cornice or lighting cove.
  • Wall construction behind the unit — masonry, stud partition, or existing finished surface — because that determines how the carcass and any wall-hung components are fixed.
  • Obstacles: skirting, architraves, switch plates, air grilles, radiators, fireplaces, structural columns, and any door swing that crosses the wall.
  • Room reference or drawing number, so the unit is not confused with a similar wall on another floor of the same villa.

Where the media wall continues into other built-in work — for example Wall Panel Systems, Custom Niche Paneling or the joinery in a whole house custom cabinetry project — say so on the same sheet. Matching reveals, shadow gaps and material transitions are resolved once, across the whole wall, not by two separate production files.

2. Television, equipment and services

Item to documentWhy it changes the build
Screen size, model or at least the screen dimensions and weightSets the bracket zone, backing reinforcement and the opening in the panelling.
Wall-hung or shelf-mounted screenDetermines whether a solid backing is required inside the carcass or behind the panel.
Source devices: console, soundbar, media player, set-top boxSets shelf depths, ventilation gaps and how many access panels are needed.
Power, data, aerial and speaker cable routes, with positionsCable paths are built into the design; retrofitted trunking is visible on a full-height feature wall.
Any integrated lighting and its switchingWhere lighting is part of the design, the electrical details for that design need confirming before production.

Send the electrician's setting-out drawing with your request wherever it exists. If services are already in the wall and cannot be moved, mark their positions on the site dimension sheet and note which ones are fixed.

3. Storage layout, in writing

The collection is configured by mixing open display with closed storage, so the layout needs to be stated rather than implied:

  • How much of the wall should read as open shelving versus closed cabinetry.
  • Door type for closed sections — hinged, sliding or lift-up — and which sections need to look handleless.
  • Shelf heights, and whether any shelves are adjustable rather than fixed.
  • Items with fixed dimensions that must fit: a soundbar, a record player, a games console, artwork, decorative objects.
  • Anything that must be hidden from the living room, and anything that must stay on display.

If your package includes Santerson Storage & Display Combo or Open & Closed Combo Units, name them on the enquiry so the layout intent is clear. A hand sketch with dimensions beats a reference photograph alone, because photographs do not tell us which proportions you want to keep.

4. Materials, finishes and edges

  • Body material and the door or panel material — for example melamine, lacquer, veneer or a wood-grain surface.
  • Colour or grain reference, plus the samples or swatch codes already approved on the project.
  • Which surfaces must match adjacent work: wardrobes, kitchen cabinetry, media units, internal doors and panelling.
  • Edge treatment — matching edge banding, a shadow gap, or a butt joint against plaster.
  • Surface performance expectations for the household: fingerprints, children, pet traffic, cleaning method.

A common failure point is a media wall specified in isolation and then delivered next to cabinetry from another supplier. If the wall has to sit flush with Integrated Door & Paneling or repeat a veneer used elsewhere in the house, record that requirement in the specification sheet and send the reference.

5. Delivery, access and installation records

  • Site address, floor, lift dimensions and stair geometry — full-height panels are sized to get through the access route.
  • Delivery window, site restrictions, and whether the unit must be sub-assembled for transport.
  • Who installs: our team on site, your builder, or your joiner receiving flat-packed components.
  • Site readiness date — when flooring, painting and services are complete at the wall.
  • Inspection and snag process, and who signs off handover.

Our service scope covers design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, then installation and handover. Freight is arranged by sea, air or rail with customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Terms, duties, transit time and delivery scope are confirmed for each project rather than assumed.

A documentation checklist you can paste into your RFQ

DocumentMinimum content
Dimension sheetWall width and height, clear finished dimensions, obstacles, access route.
Layout drawing or sketchOpen versus closed zones, shelf positions, door types, screen position.
Services drawingPower, data, aerial, speaker and lighting positions; bracket load notes.
Finish scheduleMaterials, colour or grain references, approved samples, matching targets.
Project recordRoom reference, site address, readiness date, installer of record, contact chain.

Send the five items together and the drawing stage moves quickly: we can review the layout against your dimensions, then quote against a defined scope instead of an assumption. Under our cooperation steps, that means brief and design proposal first, quotation and detail confirmation second, then production, shipment and follow-up.

Documentation notes: full-height media walls in this collection are configured per project, so dimensions and storage configuration are confirmed for each order rather than taken from a standard size list. Lighting and electrical details are confirmed for the selected design before production. Material availability, hardware selection and lead times are quoted per enquiry.

If you are specifying media walls for a villa or apartment package, send the dimension sheet and finish schedule for each room and we will come back with a proposal for the full set. As a China-based manufacturer of furniture and building materials working on residential and hospitality projects, SANTERSON handles media walls together with the surrounding joinery, panelling, wardrobes and loose furniture, so one specification covers the whole floor. Contact us through the contact page to start the drawing stage.