A frosted glass aluminium frame wardrobe looks identical in two quotations and completely different on site. Frame wall thickness, glass treatment, hardware grade and — most of all — how the opening dimensions were confirmed are what separate a clean handover from a snag list that stalls the whole bedroom fit-out. The checks below are the ones worth putting to any supplier before you place a built-in wardrobe order.

Start With What You Are Actually Ordering

Our Frosted Glass Aluminum Frame Wardrobes sit within the Glass & Aluminium Frame Wardrobe range and are made to measure: sizing, finish and internal layout are specified per project rather than picked from a fixed catalogue width. That is the point of aluminium framed glass doors — a slim sightline, a consistent frame profile across a wall of doors, and a translucent panel that hides a busy interior while still letting light through. The same construction logic carries across the rest of the family, so if you are comparing finishes side by side, Clear Glass Aluminum Frame Wardrobes and Smoked Glass Aluminum Frame Wardrobes are specified the same way and differ mainly in glass tint and how much of the interior stays visible.

If you want a softer, fully enclosed look with no metal frame line on the door face, Frosted Glass Wardrobes are a different construction and should be quoted as such. Ask the supplier to state, in writing, which construction each quotation refers to.

Six Questions That Expose Real Capability

  • Who measured the opening, and when? Ask whether dimensions came from architectural drawings or from a site check after flooring, ceiling linings and skirting were installed. Framed wardrobes are fitted to finished levels; a drawing-only dimension is the most common cause of an out-of-square reveal.
  • Is the frame profile dimension stated? A serious quotation names the visible frame width, the door leaf thickness and how the doors meet at corners and returns. "Aluminium frame" on its own tells you nothing about the sightline you will get.
  • What glass, in what condition? Confirm the glass type and thickness, whether the frosted face is on the interior or exterior side, and how edges are finished. Also confirm how glazed doors are packed and braced for the leg from the factory to your port.
  • Which hardware, and rated for what cycle load? Sliding tracks, hinges, handles and soft-close components should be listed by type with a duty rating, plus what happens if one part needs replacing in three years. Ask which parts are stocked as spares.
  • Who confirms the internal layout? Hanging heights, drawer bank positions and lighting provisions need sign-off on a drawing before production starts. A supplier who cannot produce an annotated elevation for your approval is not set up for made-to-measure work.
  • Who fits it, and what is inspected at handover? Clarify whether installation is by the supplier's team or your local contractor, who owns alignment of adjacent trades' work, and how glazing damage found after installation is handled.

Read the Quotation Line by Line

Line itemAdequate answerWeak answer
DimensionsMade-to-measure to site-confirmed finished levels, with an elevation drawing for your sign-offA standard width band, or "site to confirm later"
Frame and finishNamed profile, named surface treatment, sample or reference image of the actual frame colour"Aluminium frame, colour as per range"
GlassType, thickness, edge treatment, orientation of the frosted face, packing method for transit"Frosted glass included"
HardwareComponent types with duty rating and a spare-parts route"Premium hardware"
Scope boundaryClear split between supplier scope and builder scope: leveling, anchoring, adjacent finishesSilent on site preparation
Delivery and handoverPack list by room or unit, marked crates, an inspection step at handover"Delivered to site"

Where the supplier also handles cabinetry, joinery and other fit-out items on the same project, ask for one consolidated pack list keyed to room numbers. Wardrobes arriving in unmarked crates alongside kitchen components is how panels go missing between delivery and installation.

Why One Supplier Handles This Better Than Four

Built-in wardrobes rarely stand alone. They share a wall with interior fixtures, repeat the frame language of Frosted Glass Aluminum Cabinets in the kitchen, and often sit opposite wall panelling or a media wall. Coordinating that through separate vendors means chasing frame colours between three invoices. As a one-stop furniture and building materials supplier, we specify wardrobes, cabinetry, joinery and finishes against the same drawings and one pack list, so the frame profile you approved on the wardrobe elevation is the profile that arrives.

For projects where the door layout or finish is not in the standard range, Custom Furniture Manufacturer work covers bespoke design and prototyping, material and finish selection, and OEM production with flexible order quantities. Send us the elevation, the glass preference and the target handover date, and we will confirm what can be produced and how it ships.

Evidence Worth Asking Any Supplier For

  • Annotated elevations from a comparable wardrobe project — the drawing, not only the finished photograph.
  • A physical or photographed frame corner showing the profile and finish you are being quoted.
  • Their stated sequence for confirming dimensions: when the site check happens relative to flooring and ceiling completion.
  • A pack list sample showing how glazed components are identified per room or unit.
  • Their written route for replacement hardware and for damage discovered after installation.

Any supplier working at made-to-measure scale should answer all five without hesitation. Vague answers on the first two are usually resolved by a paid sample or mock-up before the full order — worth the cost on a multi-unit job.

A Simple Sequence That Prevents Most Problems

  1. Confirm finished levels first. Door heights and reveal widths are set against completed floors and ceilings, not structural slabs.
  2. Fix the layout on a drawing. Hanging, drawers, shelves and any integrated lighting, initialled by you before production opens.
  3. Approve the frame and glass together. Frame colour and glass tint read differently side by side than on separate samples.
  4. Agree the site boundary in writing. Who levels, who anchors, who touches up adjacent finishes.
  5. Inspect at handover, not at invoicing. Check door alignment, glide on every track, and glazing edges before signing off.

Send us your wardrobe elevations. We are a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, including residential work in Sydney, Melbourne, Perth and Willoughby. Share the drawings, the glass and frame preference, and the handover date, and we will come back with a specification that names the profile, glass, hardware and site boundary rather than a single line price.

Contact: PHILLIP · Phone/WhatsApp +86-13928214007 · Email santerson@qq.com · Enquiries via our contact page.