A floating modular shelf looks simple on a drawing: a clean horizontal plane, no visible brackets, storage that appears to grow out of the wall. That simplicity is exactly why these units fail when they are ordered from photographs instead of specifications. Wall fixings, substrate, load path, service runs and finish tolerances are all hidden, so the manufacturer only discovers the missing decisions after production has started.
If you are sourcing built-in joinery for a villa or apartment fit-out, the brief you send is the product. Below is the information set we need to quote Santerson Floating Modular Shelves accurately, and to keep the installation on site as quiet and clean as the design intends.
Start with the wall, not the shelf
Floating units carry their load into the structure behind the finish, so tell us what that structure is before anything else. Send the wall build-up for each location: masonry, stud and lining, timber battening, existing plasterboard, or a new framed wall we are asked to reinforce. Note the finished wall line and any skirting, cornice or panelling the shelf has to clear.
Where the wall is already built, photographs of the elevation plus a note on whether it can be opened up for concealed fixings will change the solution completely — an exposed fixing detail and a concealed bearer detail are different products with different lead implications. If the wall cannot be opened, say so in the first message.
Give us the three dimensions that actually matter
- Projection and depth: shelf depth front to back, plus whether the front edge is square, chamfered or mitred to match adjacent joinery.
- Bay width and module breaks: overall run length and where you want joints. Long runs read as one piece only if the modules are planned; otherwise expansion, transport limits and site access will force a joint anyway.
- Set-out heights: the vertical position of each shelf relative to the finished floor level, plus the clearance needed for the objects you intend to store — books, glassware, a coffee machine, framed art.
Our shelving listings are made-to-measure with material and finish options and layouts tailored to the project, so nothing here is a fixed catalogue size. What we cannot do is guess. Confirm dimensions and selected specifications for each project before we cut.
State the duty load and what goes on the shelf
"Books" covers everything from paperbacks to a row of stone sculpture, and the fixing design follows the heaviest realistic arrangement rather than the average one. Tell us the intended load per running metre, whether children or guests will lean on the units, and whether any bay carries equipment that generates heat or needs ventilation.
Where a run continues to the ceiling, it is usually better treated as part of a wall system than as isolated boards. Our Santerson Floor to Ceiling Systems are specified the same way — made-to-measure with project-tailored layout — and mixing floating bays with full-height carcasses is a normal, workable detail as long as the transition is drawn rather than improvised on site.
Decide how services and lighting are handled
Cables and light are the two most common late changes. If you want concealed wiring for lamps or devices, we need the routing before the carcass is built, together with where isolators and sockets will sit and who is responsible for the electrical connection. For lit shelves, our Santerson Integrated Lighting Systems are configured as part of the shelving system itself; you still confirm the electrical specification and compatibility for the chosen configuration with your engineer.
Specify finishes against a physical sample
Floating shelves rarely stand alone — they sit next to wardrobes, media units or kitchen cabinetry, and a mismatch in grain direction or sheen is obvious at close range. Send the adjacent joinery specification, including edge treatment, so we can match veneer, laminate, lacquer or metal finishes consistently. If you are also specifying Santerson Metal Frame Modular Systems in the same apartment, tell us early: mixed timber and metal frames need coordinated shadow gaps and fixing depths.
For bathroom and wet-area shelving, the brief changes again. Humidity, cleaning products and the substrate behind the tiles all matter, so those locations should be listed separately with their wall build-up rather than folded into a general living-room schedule.
Send this package with your enquiry
- Marked-up elevations for every wall, with finished floor level and setting-out dimensions.
- Wall construction notes and site photographs where the wall already exists.
- Duty load per bay and a list of what will be stored on it.
- Finish selections or the adjacent joinery specification to match.
- Service requirements: lighting, sockets, isolators, who connects them.
- Delivery address, access constraints, and whether the units must pass stairwells or lifts.
With that package we can move straight to a quotation and detail confirmation rather than a round of questions. Our Interior Design Services cover space planning, furniture layout and 3D visual renderings, plus drawing and production coordination with on-site guidance — useful when the shelving has to resolve several rooms at once.
How the order runs after the brief
The cooperation sequence is straightforward: project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. As a custom furniture manufacturer we handle bespoke dimensions, material and finish choices and prototyping, and where a developer or brand needs the same detail repeated across units, flexible minimum order quantities and OEM production are available.
Freight is arranged by sea, air or rail with packaging and container loading planned around fragile joinery, and logistics and door-to-door delivery covers the paperwork on our side. On arrival, installation and after-sales support includes site fitting, inspection and snagging. Confirm the specific terms — transit route, installation scope and warranty coverage — for your project in the quotation; we do not treat general service descriptions as contractual commitments.
Two questions worth answering before you send the drawings
First: is this a decorative shelf or a working one? A shelf that carries weight weekly needs a different fixing design from one that holds an object on display. Second: who signs off the wall? Structural adequacy behind a floating unit belongs to the engineer or builder on site, and we design our carcasses and fixings around the substrate they confirm.
Answer those two, attach the marked-up elevations, and the brief is complete enough to price. Send it through our contact page and we will come back with a proposal and the details that still need confirmation.
SANTERSON — furniture and building materials manufactured in China, supplying villa, hospitality and office projects worldwide. Phone / WhatsApp: +86-13928214007 (PHILLIP) · Email: santerson@qq.com