A mirrored hinged wardrobe looks simple on a showroom drawing: doors that open outward, mirror panels on the outside, hanging space inside. The problems show up later — a door that fouls the bed frame, a mirror panel that arrived cracked, a carcass finish that does not match the vanity next to it, hardware that sags after two seasons of daily use. A buying checklist exists to move those failures from site to quotation.

If you are specifying wardrobes for a villa, apartment or guest-room programme and sourcing them internationally, this is the sequence we work through with project buyers at SANTERSON. Use it as a request-for-quotation template: every item below should appear in writing before you place an order.

1. Door swing and clearance — measure before you choose the mirror

Hinged doors need the room to swing through. Work this out first, because it decides the layout more than any other constraint.

  • Confirm the clear distance in front of every door leaf: the door width plus a working allowance for a person standing there to dress. Measure against the actual furniture layout, not the wall line — bed, nightstand, en-suite threshold and skirting all reduce the usable arc.
  • Check what sits in the swing path on both sides: light switches, door handles, radiator or air-conditioning returns, curtain tracks and skirting boards.
  • Decide the opening sequence for multi-leaf runs. Specify which leaf is hinged where, and whether any leaf meets a return wall at an angle that restricts travel.
  • If the bedroom is tight, ask whether a sliding or open wardrobe from the same finish range would serve better before committing to hinged doors.

2. The mirror specification — glass type, fixing and safety

The mirror is the part buyers specify least carefully and regret most.

  • State the mirror thickness and the substrate behind it. A mirror bonded to a thin, unsupported panel will flex and distort the reflection; a board-backed door keeps the image true.
  • Ask how the mirror is fixed: adhesive bonding, mechanical trim, or a rebated frame. Ask for both, so failure of one method does not release the panel.
  • For guest rooms, children's rooms and hospitality use, ask for safety-backed mirror glass (a backing film that holds fragments together) and confirm what is standard versus an upcharge.
  • Decide edge treatment: polished, bevelled or framed. Exposed edges are the first place a mirrored door chips in transit and on site.
  • Confirm mirror placement relative to the bed and window, since a mirror facing a bright window or a sleeping position is an objection buyers raise late in a project, after production has started.

3. Carcass, doors and finish — how it matches the rest of the joinery

A wardrobe rarely stands alone. It sits beside internal doors, skirting, vanities and kitchen cabinetry in the same palette.

  • Name the finish by reference, not by description. "Oak" means nothing across suppliers; a board code, colour standard or approved sample does.
  • Order a physical sample of the door face and carcass edge before sign-off, and check it against the flooring, doors and worktops already selected on site.
  • Choose the door construction deliberately: flat panel, paneled or veneer doors behave differently in humidity and take light differently. Our Mirrored Hinged Wardrobes are made-to-measure, so the door style, board material and finish are set per project rather than picked from a fixed catalogue size.
  • Ask which surfaces are finished on all four faces. Visible carcass ends, returns above wardrobes and the inside of doors are where cost gets cut quietly.
  • Specify gloss level explicitly for lacquer, acrylic or melamine — a matte and a satin panel in the same colour read as two different products under bedroom lighting.

4. Hardware — the line item that decides service life

  • Specify hinges by load and cycle rating, and state whether soft-close is included for every leaf or only some.
  • Mirror-faced doors are heavier than plain ones. Confirm the hinge grade matches the finished door weight, not the bare panel weight.
  • Ask what handle or profile is used, and whether a handleless groove is possible on a mirrored leaf — some profiles cannot be cut into a mirror-fronted door.
  • Request spare hinge and handle sets in the same shipment. Reordering a small hardware batch to another country later usually costs more than buying it up front.

5. Internal layout — design it around what you actually store

  • List the storage mix per room: long hanging for dresses and coats, double hanging rails, drawer zones for folded items, open shelves for daily use, and a high shelf for seasonal pieces.
  • Set rail heights from the tallest garment plus hanger depth, not from a default drawing dimension.
  • Confirm which internal components are included as standard and which are options: drawers, pull-out trays, trouser slides, lighting, mirrors on the door interior, and dividers.
  • For hospitality projects, keep the layout identical across room types so housekeeping and procurement stay predictable; note exceptions explicitly.

6. Hinged or sliding — decide on the record

Point of comparisonMirrored hinged wardrobeMirror sliding door wardrobe
Floor space in frontNeeds a clear swing arc for each leafNo swing arc; doors travel within the unit depth
Access to the interiorFull opening of the bay in front of youOnly the open panel is reachable at a time
Mirror area per leafLarger uninterrupted panelsSplit by the track and by overlapping panels
Maintenance pointsHinges may need re-adjustment over years of useTrack collects dust; rollers need replacement
Best fitBedrooms with clearance, and full-height mirror wallsNarrow bedrooms and corridors where a swing is not possible

Where the plan genuinely has no room to swing, our Mirror Sliding Door Wardrobes cover the same brief in a different mechanism. Decide which one you are buying before pricing, because the two are not interchangeable once production starts.

7. Measurement and drawings — who signs them off

  • Confirm who measures: your site team or our team, and at what stage. Measure after floor and ceiling finishes are complete, not from the structural slab.
  • Ask for shop drawings showing overall dimensions, door split, hinge positions, handle detail, internal layout and mirror edge detail. Read them; corrections are free at this stage and expensive afterwards.
  • Record floor levelness and wall plumb. Out-of-square walls need scribing or a filler panel — specify it, do not leave it to the installer on site.
  • Confirm how the unit meets ceiling, skirting and adjacent cabinetry, and whether a light gap or cornice is intended.

8. Packing, transit and receiving — mirrors are the fragile item in the shipment

  • Ask how mirror-fronted doors are packed: edge protection, corner protection, glazing crates or interleaved padding, and whether panels travel flat or upright.
  • Agree the inspection routine before unloading: photograph any damage at the container, against the packing list, while it is still claimable.
  • Check that carton markings map to room-by-room delivery notes, so a bedroom set does not get carried to level two.
  • Agree replacement terms for transit damage in writing — who pays, how fast a replacement panel is made, and who covers freight on it. Our Logistics & Door-to-Door Delivery service covers freight forwarding, packaging and container loading, customs paperwork and delivery to site; the terms for your lane and Incoterms should be confirmed per project.

9. Installation, snagging and after-sales

  • Confirm who installs: your local contractor or a team supplied with the units, and what training or drawings they receive.
  • Set a snag list before handover — door alignment, hinge adjustment, mirror edge condition, drawer runners, finish damage — with a defined close-out date.
  • Get the warranty in writing: what is covered (panels, hardware, mirrors), for how long, and what is excluded. Do not rely on verbal assurances quoted from marketing pages.
  • Confirm how spare parts are supplied after handover, since a wardrobe's service life usually outlives the project team that ordered it.

10. Commercial terms — the questions that prevent a stalled site

  • Ask what the quotation includes: delivery to port or to site, duties, installation, hardware, internal fittings and lighting. Compare quotations on identical inclusions.
  • Fix a production schedule against your programme milestones, with written notice of any change; wardrobes are on the critical path for bedroom handover.
  • Confirm payment stages tied to drawing approval and shipment, not a single upfront sum.
  • Ask what happens if quantities change — an extra room set ordered after production starts is priced and scheduled differently from the original batch.

Two things to keep out of the specification. First, do not assume a standard wardrobe size will fit — mirrored hinged units in this range are made to project-specific dimensions, so the drawing package is what you approve. Second, do not carry supplier marketing claims into your contract: performance figures, warranty periods and response times quoted on a website should be confirmed in writing for your specific order before they appear in a purchase agreement.

Where a single supplier helps

Wardrobe failures are usually interface failures — the joinery finish does not match the internal doors, the mirror edge clashes with the tiling, the lighting is not wired to the carcass. Buying wardrobes, interior fixtures, doors and flooring from one custom and OEM manufacturer keeps those interfaces inside one drawing package and one production schedule. That is how our villa and apartment work in Australia — Willoughby, Perth, North Turramurra, Melbourne and Sydney — is coordinated: brief and design proposal, quotation and detail confirmation, then production, shipment and follow-up.

Frequently asked questions

How much clearance does a mirrored hinged wardrobe door need?

Allow the width of the door leaf plus space for someone to stand in front of the open door and dress. Measure that arc against the finished furniture layout, including bed, nightstands and any threshold, before you confirm the door split.

Are mirrored doors heavier than plain ones?

Yes. The mirror adds weight to every leaf, so hinge grade should be confirmed against finished door weight rather than the bare panel, and soft-close hardware needs specifying per leaf.

Can a mirrored hinged wardrobe be made to non-standard ceiling heights?

Yes. Made-to-measure sizing covers height as well as width and depth, so full-height units can meet the ceiling with scribing where walls are out of square. The shop drawing is where this gets settled.

What should I do if a mirror panel arrives damaged?

Photograph it at unloading against the packing list, before the crates leave site, and report it the same day. Replacement terms for transit damage should already be in your order documents.

Send us your bedroom layouts or a room-by-room wardrobe schedule and we will price them against this checklist — dimensions, door style, mirror specification, hardware and internal layout confirmed on drawings before production. Contact us to start a quotation.

SANTERSON — furniture and building materials manufacturer, one-stop project supplier. Phone / WhatsApp: +86-13928214007 (PHILLIP) · Email: santerson@qq.com