Open wardrobes look simple on a drawing — a frame, some shelves, a hanging rail and a warm wood finish. That apparent simplicity is exactly why they go wrong in production. Once the doors are removed from the specification, every visible edge, bracket and back panel becomes a design decision, and every dimension has to hold up against what is actually in the room. Below is the confirmation list we work through with buyers, builders and designers before a custom wood tone open wardrobe unit goes into manufacturing.

Start With the Room, Not the Unit

A made-to-measure open wardrobe sits against real walls, a real floor and a real ceiling, and in most buildings none of those three are square or level to the millimetre. Before anything is cut, we ask for measured heights at several points along the run — left, centre, right — plus the floor finish build-up and where the finished floor level will land. A unit designed off a single nominal height will either sit proud of the skirting or leave a visible gap under the top rail.

Send drawings when you have them, but a site-measured sketch is enough to start. What matters is that the dimensions we manufacture to come from the site condition after finishes, not from a design-stage plan. Every built-in furniture item in our range is made to measure for this reason.

Decide How the Wood Tone Is Achieved

"Wood tone" covers several different constructions, and they are not interchangeable once a project has other timber elements around it. The three we quote most often for open wardrobes:

  • Veneer — a thin cut of real timber over an engineered substrate. Continuous grain and the most convincing appearance, but grain matching across a long run needs to be specified at order stage.
  • Melamine / laminate — a printed decorative surface on board. Consistent from panel to panel and the practical choice where budget and volume drive the schedule; see Wood Grain Melamine Wardrobes for the same surface logic applied to a closed unit.
  • Solid timber — through-coloured timber with mitred edges. Heavier and more expensive, and it moves with humidity, so it needs correct jointing rather than being treated like a board product. Walnut Solid Wood Wardrobes shows that construction.

Two confirmations settle most disputes later: a physical sample of the exact surface, and written agreement on which face of the panel the finish is applied to. Edge banding or solid edge detail should be named in the order too — on an open unit the edges are seen from both sides, so a cheap edge reads immediately.

Lock Down the Layout Before Production

An open wardrobe has no door to hide an awkward internal arrangement, so the layout is the design. Hanging heights, shelf depths and drawer positions should be set from the client's actual storage mix rather than a generic template. We confirm:

  • Long-hang, double-hang or short-hang zones, and the rail height for each
  • Shelf spacing — set to the items being stored, not to a default grid
  • Drawer blocks and pull-out fittings, including clearance for their runners
  • Lighting provisions: fitting type, cable route and where the driver is accessible for maintenance
  • Which faces are exposed — a unit against one wall needs a finished carcass on three sides; an island unit needs it on all four

Our Wood Tone Open Wardrobes line is specified this way: finish, layout and dimensions are set per project rather than chosen from fixed sizes. Related open configurations — Metal Frame Open Wardrobes and Minimalist Open Wardrobes — follow the same made-to-measure process if a slim metal carcass suits the scheme better than a timber one.

Confirm Structure and Fixing Method

Open units carry their loads visibly, so the carcass construction is part of the specification, not an internal detail. Wide unsupported shelf spans need either a thicker board, a mid support or a hidden stiffener, otherwise shelving loaded with folded items will sag within a few seasons. State the intended load per shelf in the order.

Then confirm how the unit is restrained: fixed to wall, floor, or both; what the substrate behind it is (stud, brick, concrete, plasterboard); and whether a top panel or scribe will close the gap to the ceiling. Where a run turns a corner or stops short of a wall, decide now whether the return is finished square or filled with a scribed filler.

Get the Commercial Details in Writing

Most production delays on custom joinery come from commercial ambiguity rather than technical problems. Before we release an order to the floor, these are agreed on paper:

ItemWhat to confirm
Order basisSigned shop drawing with dimensions, elevations and finish callouts — production follows the drawing, not the concept image
Sample approvalPhysical surface and edge sample approved before cutting; note the approved reference in the order
Batch consistencyVeneer lots and printed surfaces can vary between batches — order the full run together where grain continuity matters
Delivery termsIncoterms, packaging standard, container loading plan and delivery address for each site
Installation scopeWho assembles and fixes on site, and what preparation the trade contractor must complete beforehand

Our Custom & OEM Service covers bespoke finishes, prototyping and flexible order quantities, and Logistics & Door-to-Door Delivery handles freight, customs paperwork and container loading so the units arrive at site rather than at port.

A Simple Sign-Off Sequence

In practice the whole thing takes four sign-offs, and each one closes off a category of risk:

  1. Site measurements accepted — dimensions confirmed after floor and ceiling finishes.
  2. Shop drawing approved — layout, exposed faces, fixing method and lighting routes shown.
  3. Surface sample approved — wood tone, sheen and edge detail matched physically.
  4. Commercial terms confirmed — order basis, batch plan, delivery terms and installation responsibility.

Once those four are in place, a custom open wardrobe moves through production without renegotiation. If you are specifying open wardrobes alongside kitchen cabinetry, flooring and wall panelling for the same project, sourcing them from one one-stop solution supplier keeps finishes matched across trades instead of reconciled on site.

Send us the drawings or a site-measured sketch, the finish you are working to, and the target installation window, and we will come back with a specification sheet and quotation for review before anything enters production.