A door schedule looks simple on paper: a list of openings, sizes and swing directions. It becomes complicated the moment those doors are made to measure in China and have to arrive on site in another country without being damaged, short-shipped or delivered before the openings are ready. This guide walks through how we plan a project order of Classic Panel Hinged Doors for international delivery, stage by stage, so purchasing teams and site contractors know what to prepare on their side.
Start with the door schedule, not the product page
Our Classic Panel Hinged Doors are made-to-measure. Each leaf is produced to the dimensions, layout and finish you specify for that particular space, which means a project order is only as accurate as the opening schedule behind it. Before we quote, we ask for:
- clear opening width and height for every door, with the finished floor level marked;
- wall build-up and expected frame depth, so the lining matches the actual construction;
- swing direction and latch side for each leaf, plus whether pairs open inward or outward;
- the finish you want, and any hardware to be supplied with the leaves;
- room-by-room numbering that your site team will also use on drawings.
Numbering matters more than buyers expect. A container of doors is unloaded by a crew who have never seen your drawings, so the tags on the packaging need to match the tags on the plans. We print room references on every package and keep the same numbering in the packing list, the commercial invoice and the production drawings.
Confirm specifications before production starts
Because sizing, materials and finishes are all project-specific, we treat the confirmed order as a fixed reference point. Production of interior hinged doors for a project begins once the schedule is signed off, so any change after that point affects both the production sequence and the container plan. Our practice is to send shop drawings and specification sheets back to the client for confirmation, then hold that version as the single source of truth through manufacturing and quality control.
Two decisions are worth settling early because they change what you receive:
- Delivered loose or fully assembled. Leaves, frames and linings can ship separately for easier handling on site, or pre-assembled where the opening and access allow it.
- Hardware included or sourced locally. Where handles, hinges and closers are bought in the destination market, we confirm cut-out and fixing details in advance so the leaves arrive ready for that hardware.
If your project also needs matching joinery — wardrobes, wall panelling, vanity units — it is usually more efficient to place those items on the same order. They share the same material and finish references, ship in the same container plan, and go through one round of coordination rather than several. Our custom and OEM service covers bespoke finishes and textures across these product groups.
Build the delivery plan around your site programme
Doors are a late-trade item. If they land before the wet trades, screeds and floor finishes are complete, they sit in storage and get damaged; if they land after the decoration is finished, the whole handover slips. We plan backwards from your installation window.
In practice that means agreeing three dates at the start of the order: production completion, the shipping date, and the delivery date to site or to your nominated warehouse. Our logistics and door-to-door delivery service then covers sea, air or rail freight forwarding, export paperwork such as commercial invoices, packing lists and certificates of origin, container loading plans, shipment tracking and customs support documents. For a multi-unit residential project we can also stage the shipment by building, floor or unit, so the crew receives what it can install that week instead of a full building load at once.
For buyers comparing options, our team will quote different Incoterms and freight modes against the same door schedule, so you can see the cost difference between port-to-port and delivered-to-site before committing. Transit times, duties and import requirements differ by destination and change over time, so we confirm those specifics for your country at quotation stage rather than publishing general figures.
Packaging and packing lists
Panel doors are vulnerable at the edges and on the moulded faces. We pack leaves flat or upright in timber-framed cases with edge protection and surface interleaving, keep frames and linings bundled by size, and separate hardware into labelled boxes tied to the relevant room numbers. The packing list states case count, net and gross weight, dimensions per case and the rooms each case belongs to — information your clearing agent and site supervisor both need.
A practical tip from project work: photograph the case labels on arrival before opening anything. If a case is damaged in transit, clean photographs of the label and the damage make the insurance claim straightforward, and we can produce replacement leaves against the original confirmed specification without re-surveying.
Receiving, installation and after-sales
On delivery, check case count against the packing list first, then open by room group and check each leaf against the schedule: size, swing direction, finish and any cut-outs. Keep the leaves in their packaging until the openings and floor finishes are complete, and store them dry and upright.
We support installation with fixing details and on-site guidance, and our installation and after-sales support service covers inspection of snags, warranty items and spare parts or replacements for a project order. Where a site team installs the doors themselves, we stay in contact through the fitting stage so adjustments are handled while the trade is still on site rather than after handover.
A short checklist before you place an international door order
- Opening schedule complete, numbered and signed off by your site team.
- Swing directions, latch sides and frame depths confirmed for every leaf.
- Finish and hardware decisions closed; shop drawings returned confirmed.
- Installation window fixed, with production and shipping dates set backwards from it.
- Incoterms, freight mode and delivery address agreed with your clearing agent.
- Packing list format agreed so site crew can unload by room reference.
Send us your door schedule and programme dates and we will come back with a specification sheet, shop drawings and a delivered-price option for the whole order. If your project needs doors coordinated with cabinetry, wardrobes or wall panelling, our Windows and Doors team can manage them as one package from production through to handover.