A set of flush wall aligned doors is one of the most unforgiving elements in a project order. The leaf, the frame and the surrounding wall finish are meant to read as one plane, so every deviation — a warped core, a chipped arris, a hinge mortise cut 2 mm out — becomes visible the moment the paint goes on. That is exactly why the export leg of the job deserves as much planning as the manufacturing leg. Below is the sequence we work through on international orders, from the drawing pack to the handover list at site.
Start with the door schedule, not the container
Before any freight question is answered, the order needs a door schedule your production team and your site team can both read. For each opening it should record the leaf size and thickness, the swing direction and hand, hinge type and quantity, the lock or latch body, the frame profile, the finish, and — for concealed hardware — the exact set reference. Flush doors are made to measure, so a schedule that leaves out one hanging detail turns into a site query three weeks later.
Two items in particular should be fixed at this stage. The first is the floor cover build-up: a leaf sized against a screed level rather than the finished floor will sit too high or drag once the tile or timber is laid. The second is the wall make-up on both faces, because the frame has to be set to the correct depth before the boarder or plasterer closes up around it.
Confirm finishes and hardware while the order is still in production
Flush doors are usually specified with a painted or veneered face, and the finish travels badly if it is treated as ordinary cargo. Where a primed leaf ships for on-site finishing, say so clearly on the drawing; where a factory-finished leaf ships, the packing has to protect the face rather than just the edges. The same applies to the wider joinery package. A project that pairs doors with integrated door and paneling work should have one drawing set govern both, so the panel joint and the door reveal are dimensioned against each other instead of being solved on site.
Hardware is worth ordering with the doors rather than buying locally after arrival. Concealed hinges, pivot sets and handleless details are sized to leaf weight and thickness; a substitute bought at the destination rarely matches the pre-cut provisions. If your project also includes flush hinged doors or sliding and pocket variants, keep one schedule that shows which opening uses which system, so hardware quantities are checked once instead of per collection.
Decide the delivery terms before you quote freight
The same shipment costs very different amounts depending on where your responsibility stops. Door packages are bulky and relatively heavy for their value, so a part-load or groupage consignment behaves differently from a full container you consolidate yourself. Settle these points in writing with the supplier before comparing quotes:
- Whether the price covers packing to the factory gate, loading, ocean or rail freight, destination clearance, and delivery to the site door.
- Which party acts as importer of record and who pays duty, taxes and port charges at destination.
- Whether the shipment goes by sea, air or rail, and what that means for a made-to-measure item that cannot be re-manufactured quickly.
- Whether cargo insurance is included, and what it actually covers for finish damage on doors and joinery.
Ask the supplier to prepare the commercial paperwork with the same care as the packing. Commercial invoices, packing lists and certificates of origin are routine on this kind of order; import permits and clearance requirements sit with the destination country and should be checked early by whoever is acting as importer. Our logistics and door-to-door delivery service covers freight forwarding, documentation, packing and container loading planning, and shipment tracking — but the destination-side obligations still need a named owner on your project.
Pack for the finish, not for the weight
Doors fail in transit in three predictable ways: edges chipped against a rigid corner, faces scratched by movement inside the bundle, and leaves that warp because they were stored flat or leaned at an angle in a hot container. A practical packing brief should therefore state how leaves are banded and interleaved, whether frames travel assembled or knock-down, how hardware is separated and labelled, and how bundles are positioned in the container so nothing heavy rests on a finished face.
Labelling matters more than most site teams admit. Every bundle should carry the schedule number from the door list, not just a carton count, so the right leaf goes to the right opening without anyone guessing. When doors ship alongside cabinetry, wardrobes or wall panels, mark each bundle with its zone as well — the joinery usually gets unloaded first and can sit in storage for weeks.
Sequence the delivery against the site programme
Flush doors cannot arrive too early or too late. Frames need to be set before wall finishes close up; leaves should not go into a wet trade environment any earlier than necessary. Build the delivery date backwards from your first-fix and second-fix dates, then add a buffer for clearance. A made-to-measure order that arrives after the wall closes is a re-order at the destination's freight rate, so an extra two weeks of contingency on the arrival window is usually cheaper than one replacement leaf.
Storage conditions at destination are part of the plan, not an afterthought. Keep leaves dry, upright and supported, keep hardware in a secure dry store, and keep the packing list with the goods so inspection is quick.
Inspect on arrival against the schedule
Open enough of each bundle to check what matters while a claim is still possible: leaf dimensions against the schedule, squareness, finish condition on both faces, edge integrity, and hardware quantities against the list. Photograph anything damaged before it is moved, and record it against the schedule number rather than a room name. This is the moment where a clear drawing pack pays for itself — you are checking against agreed dimensions instead of debating what was ordered.
Installation and handover
Flush detailing only looks right when the gap around the leaf is even on all four sides, which means frame alignment and wall flatness are checked together. Our installation and after-sales support service covers on-site installation, inspection and snag resolution, plus spare parts and replacement where needed; the scope should be agreed per project so both sides know what happens if a leaf is damaged after handover.
Close out with a handover pack: the final door schedule as built, the finish reference for each face, the hardware set references, and any adjustment notes. Whoever maintains the building later needs to know which opening used which concealed system.
A short checklist before you place the order
- Door schedule complete: sizes, hand and swing, hinges, lock bodies, frame profile, finish.
- Floor build-up and wall make-up confirmed on both faces for every opening.
- Hardware ordered with the doors; concealed sets referenced per opening.
- Delivery terms fixed in writing, including importer of record and insurance scope.
- Packing brief written for finished faces; bundles labelled with schedule numbers.
- Arrival window set backwards from first fix, with clearance buffer included.
- Inspection on arrival against the schedule, with photo records and a named claim owner.
If you are assembling a doors-and-joinery package for a villa or hospitality project, send us the drawing set and door schedule and we will confirm sizes, finishes, packing and the freight option that fits your programme. See our turnkey solutions for how design, production, logistics and installation are coordinated as one scope, or contact us directly to start with a schedule review.