Media walls are easy to under-specify. A guest suite or residence lounge needs a screen that reads as architecture, not as equipment bolted to plasterboard, and it needs the joinery behind it to hold hardware, cables and storage without a site team improvising on the day. That is exactly where Santerson Sliding Panel TV Systems sit in our catalogue: configurable wall systems in the Media & TV Walls collection, made to measure for each space. This guide walks procurement teams through how we take those systems from a drawing to an installed handover on a hospitality project.

What the product listing actually commits to

We describe these listings plainly, because vague product copy is what causes variation orders later. A sliding panel TV system in this collection is configurable in three ways: finish, layout and dimensions. The panel face can be matched to the joinery and wall panelling used elsewhere in the same project, so a closed wall reads as one continuous surface. Sliding panels carry the track and hardware needed to move across the opening, and the carcass behind them carries the screen recess, cable routes and storage.

What we deliberately do not do is publish a single fixed size or a universal panel specification for this range. Each system is made to measure, which means dimensions, panel materials and the mechanism are confirmed per project before production. If your design team needs a stated dimension from a brochure, ask us for it against your drawing — that is how these systems are quoted.

Step 1: Lock the screen decision before the wall detail

The panel system is sized around the display, so the display decision has to come first. Before we draw anything, we need the following from your design or technical team:

  • Screen size and mounting method. Whether the panel closes over the screen with a clearance gap, and how much of that gap is acceptable visually in the room.
  • Cable and connection plan. Where power, signal and network entries land behind the recess, and who is responsible for that first fix.
  • Panel stacking. How many panels open the wall, which direction they travel, and where they stack when open. This drives the opening width you can actually achieve.
  • Finish reference. The panel face needs to match adjacent panelling or cabinetry, so send the finish reference rather than a colour name.

Send these four items together and we can return a layout that matches your elevation. Sent one at a time, they cost weeks in email.

Step 2: Choose the wall system type per room type

Not every media position in a hospitality project needs the same build. Within our Interior Fixtures range, these are the configurations we most often pair with sliding panel TV systems:

SystemWhere it works on a hospitality projectWhat to confirm before ordering
Sliding Panel TV Systems Suites, residence lounges and penthouse living rooms where the screen should disappear when not in use. Panel count, travel direction, stack position, track fixing to the structure above.
Integrated TV Panels Positions where the screen stays visible and the wall is built around it as a designed panel. Screen recess dimensions, ventilation, and how services are concealed.
Full Height Media Walls Lounge walls that carry display, storage and the screen as one composition. Overall height against floor level, and the open/closed storage split.
Backlit Feature Walls Arrival spaces and lounge walls where lighting is part of the design intent. Lighting specification, driver access, and dimming control interface.
Storage & Display Combo Guest-facing areas needing glassware, minibar or display shelving next to the screen. Shelf loading, glass type, and internal fit-out layout.
Integrated Media Storage Media positions that also have to absorb luggage space, linen or equipment storage. Internal configuration and door or panel interface with the rest of the wall.

Where a project needs a room divider as well as a media wall, our Partition Sliding Systems are specified separately and need the track, hardware and opening dimensions confirmed for each position. Where sound separation between spaces matters, tell us at specification stage: Acoustic Sliding Panels are a different listing and their acoustic performance must be confirmed for the configuration you select.

Scope note we always raise early: wall systems of this type are catalogued as residential wall system projects. On a hospitality development, positions in guest rooms and public areas should be reviewed with your architect and M&E consultant for the local requirements that apply to your building. We confirm dimensions, materials, hardware and electrical provisions against your drawings; we do not substitute for your design team's compliance sign-off.

Step 3: Bundle the wall system with the rest of the joinery package

A media wall specified in isolation is a small order that still consumes procurement time. The efficiency comes from ordering it inside the same joinery and fit-out package, so one set of drawings, one production run and one shipment covers the whole floor. As a one-stop furniture and building materials supplier, we produce the surrounding work in the same factory:

  • Kitchen cabinets and hotel appliances, including custom built-in cabinetry for suites and serviced apartments.
  • Built-in furniture such as wardrobes, closet sliding panels, tall cabinets and modular living systems that share the finish with the media wall.
  • Wall panels and cladding, engineered wood flooring and ceiling panels, so the media wall ties into floor and ceiling lines rather than fighting them.
  • Bathroom sanitary fixtures, lighting, carpets and rugs for the same room set.

The practical benefit is finish consistency. When the sliding panel face, the wardrobe doors and the adjacent panelling come off the same production batch, colour and grain matching are far easier to control than when three different suppliers deliver separately.

Step 4: Use custom and OEM service where the standard configuration stops

Where a design intent goes beyond our catalogue options, Custom & OEM Service covers bespoke finishes and textures, material selection across wood, metals, engineered stone and laminates, prototyping, and brand customisation. For media walls this usually means a panel face in a specified veneer or lacquer, an integrated lighting detail, or a mechanism requirement that the standard listing does not cover.

One point to raise at quotation stage rather than after order confirmation: minimum order quantities vary by product and configuration. Ask us for the applicable quantity for your room count before you commit the specification into a tender document.

Step 5: Sequence production, logistics and installation

Our Turnkey Interior Project Solutions follow a defined sequence, and wall systems sit at a specific point in it because they are fixed to the structure:

  • Consultation and design planning. Elevations, room schedule and finish schedule agreed; dimensions confirmed on site where tolerances matter.
  • Detail confirmation and quotation. Panel materials, mechanism, electrical provisions and internal layout signed off before production starts.
  • Production and quality control. Manufactured with the wider joinery package so finishes match.
  • Logistics. Freight by sea, air or rail with commercial invoices, packing lists and origin paperwork, packaged for panel systems that cannot take rough handling. Confirm Incoterms, insurance and delivery address scope for your port of entry on the order.
  • Installation and handover. Site installation, inspection and snag list, then warranty, spare parts and maintenance support under Installation & After-sales Support.

Two sequencing points save real money on hospitality projects. First, the screen recess and cable routes are fixed items — get them into the first-fix programme, not the joinery installation week. Second, order one sample wall or mock-up position ahead of the room set. A single approved mock-up settles panel travel, gap tolerance and finish before you commit to repeats.

A practical specification checklist

Before you send us an enquiry for a media wall package, this is what we need to quote accurately:

  • Room schedule with the count of each media position type.
  • Elevations showing overall width and height, plus finished floor levels.
  • Screen make, model or size range, and mounting method.
  • Panel layout: number of panels, travel direction, stack position.
  • Track support condition — what structure the track fixes to, and whether it is exposed or concealed.
  • Finish references matched to adjacent joinery and panelling.
  • Internal fit-out: shelving, glass, drawers, cable management, ventilation for equipment.
  • Delivery location, Incoterms preference and required delivery window.
What we will not quote from a colour name or a mood board alone. Send finish references and dimensions. These systems are made to measure, and an accurate enquiry returns an accurate price the first time.

Frequently asked questions

Can sliding panel TV systems be matched to our wardrobe and panelling finishes?

Yes, when ordered as part of the same joinery package. Panel faces are specified from material and finish options, so matching veneer, lacquer or laminate across wardrobes, closet sliding panels and the media wall is a normal part of the specification process.

Are dimensions published for this range?

No single fixed dimension applies. Layout, dimensions and finish are specified per project, which is why we quote from your elevations rather than a standard size chart.

Do you supply the screens and electrical work?

We build the wall system, including recesses, cable routes and provisions for lighting and equipment. Display hardware and on-site first-fix electrical work are normally delivered by your AV and M&E contractors, so we coordinate those interfaces with them rather than assuming them.

How do you handle warranty and replacement panels after handover?

Installation, inspection and snagging are followed by warranty coverage, spare parts and ongoing maintenance. For panel systems, keep your approved finish and configuration record — repeat panels are produced against that record.

Next step: send us your room schedule, elevations and finish references for the media wall positions, and we will return a layout and quotation for Santerson Sliding Panel TV Systems as part of your wider fit-out package. Enquiries go to Contact Us, with the project location, room counts and target delivery window so we can advise on lead time and packaging for your port of entry.