A lit display cabinet looks simple on a rendering. It is one of the last items on a joinery schedule and one of the first things a client points at on site. When the brief only says "display cabinet with lighting", the quotation that comes back is guesswork, and the price gap shows up later as variation orders.

This note walks through what to put in a procurement brief for a Santerson Illuminated Display Cabinet, so the drawing, the quotation and the delivered unit describe the same piece of furniture.

What this product actually is

The Santerson Illuminated Display Cabinet is part of the Display Cabinets collection, designed for residential living projects: finish, layout and dimensions are specified per project rather than chosen from a fixed size list. That single fact changes how you brief it. You are not selecting a catalogue item and hoping it fits; you are specifying an opening, a carcass, a door treatment and a lighting detail that get manufactured together.

Because the cabinet is configurable, the quotation you receive is only comparable with another quotation if both were built from the same set of inputs. The sections below are those inputs, in the order they normally get frozen.

Section 1 — Location, opening and interface conditions

Start with where the unit lives and what it touches. A built-in display cabinet is measured against walls, floor and ceiling that are never perfectly square, so the brief should state the interface, not just a nominal size.

  • The room and the wall, with the reflected ceiling plan or elevation reference from the drawing set.
  • Whether the unit is recessed into a niche, flush with an adjacent wardrobe run, or standing proud of the wall face.
  • Floor finish build-up at the cabinet line, and whether the plinth or base is to sit on the finished floor or be packed under it.
  • Ceiling condition above: recessed downlights, cove detail, sprinkler heads or bulkheads that limit carcass height.
  • Adjacent trades — plasterboard, stone, timber panelling — and who carries the making-good around the cabinet.

Where the display cabinet is part of a larger wall rather than a stand-alone piece, brief it together with the surrounding system. Santerson's Santerson Open Display Niches are lit recesses inside an integrated storage wall, which is a different build detail from a cabinet with its own carcass and doors. Deciding between the two at brief stage avoids paying twice for lighting that only needs to exist once.

Section 2 — Layout and what will be displayed

Shelf spacing follows from the objects, not from a default grid. State the categories being displayed and let the shelf pitch follow them.

Item in the briefWhat to write down
Display contentsObject types and their largest dimensions — ceramics, awards, glassware, books, art objects.
Shelf typeFixed, adjustable on pins, or glass shelves with metal edge trim.
Shelf pitchVertical spacing per bay, and how many adjustable positions are required.
EnclosureOpen, glazed doors, or a mix of open bays and closed cabinets below.
Back panelMirrored, matching carcass finish, fabric-wrapped, or slatted for concealed lighting.
SecurityLocks on glazed doors, soft-close hardware, child-restraint needs in residential work.

If some bays are meant to be read as open shelving and others as enclosed cases, say so explicitly. Santerson Open Display Units and Glass Front Display Cabinets are separate entries in the same collection, and mixing them within one wall is common — but only if the schedule says which bay gets which treatment.

Section 3 — The lighting specification, written properly

This is where most briefs fail. "LED strip" is not a specification. For an illuminated display cabinet, write the lighting as its own line item with these attributes:

  • Mounting position — top of each bay, concealed in a rebate, vertical channels at the jambs, or toe-kick uplight.
  • Light distribution — wall-washing to avoid hot spots on a back panel, or point lighting aimed at specific objects.
  • Diffusion — aluminium channel with a milky or clear diffuser, so the strip itself is never visible from the viewing angle.
  • Colour temperature and rendering — state the target colour temperature and how it matches the room's other lighting; for collectibles and art, specify a high colour-rendering requirement rather than assuming it.
  • Output and dimming — whether the circuit is dimmed, and with which control gear, since the driver has to be reachable for service.
  • Driver location and access — an inspection hatch or removable panel, agreed on the drawing before the carcass is built.
  • Cable routes — where the feed enters the unit and whether it travels through an adjacent cabinet.

Where the lit display sits within a run of joinery that also has task or accent lighting, brief the lighting as one system. Santerson lists Santerson Integrated Cabinet Lighting as a configurable accessory, and its product page states that electrical specification and compatibility with each cabinet design need to be confirmed for the project. Treat that confirmation as a required step in your programme, not an optional query.

A practical rule: if the drawing does not show where the driver sits and who switches the circuit, the lighting is not specified yet — only drawn.

Section 4 — Materials, finishes and make-up

The cabinet has to match joinery made by other suppliers on the same job, so the brief should fix the make-up rather than a colour name.

  • Carcass material and thickness, and whether the carcass finish matches the interior or is a standard neutral.
  • Door construction — flat panel, framed, or glass in an aluminium or timber frame — with the frame profile drawn to scale.
  • Finish system: lacquer, laminate, veneer or wood-effect, plus sheen level. Sample approval should be a named deliverable in the schedule.
  • Edge treatment on shelves and visible carcass edges, especially where glass shelves meet a timber frame.
  • Glass type for glazed doors — clear, low-iron, tinted or ribbed — with safety glazing required for doors in circulation areas.
  • Hardware brand and model line, so the same hinges and slides appear on every quotation.

If the project already has approved finishes elsewhere, attach them. Santerson's Custom & OEM service covers custom furniture design and prototyping together with bespoke materials, finishes and textures, so a brief that carries actual samples or approved finish codes gets a much closer first price than one written in words alone.

Section 5 — Documentation to attach to the enquiry

Send the same pack with every enquiry so the returns are comparable. A complete pack for one display cabinet contains:

Dimensioned elevation and plan of the unit, with overall height, width and depth.

Bay-by-bay shelf schedule with pitch, shelf material and load notes.

Door and glass schedule, including ironmongery schedule references.

Lighting layout showing fixture positions, driver location, circuit and control.

Finish schedule with approved samples or finish codes.

Interface notes: floor build-up, ceiling condition, adjacent trades, making-good responsibility.

Site access and delivery constraints — lift size, stair width, protection requirements.

Programme dates for sample approval, manufacture, despatch and installation.

The last two items are the ones procurement usually forgets. A made-to-measure glazed cabinet that cannot get through the site entrance or into the service lift becomes a site-assembled problem, with a cost attached, after the order is placed.

Section 6 — Comparing quotations without surprises

Read the returns against your own line items rather than against the headline number. Typical gaps between two display-cabinet prices come from: glass type and safety glazing; whether lighting is included with its driver and control or priced as an extra; whether the carcass interior matches the exterior finish; the hardware line; and whether delivery, packaging and installation sit inside the price.

For a single supplier handling several trades, those inclusions are easier to normalise. Santerson is a China-based one-stop furniture and building materials supplier covering design consultation, material selection, manufacturing, project coordination, door-to-door delivery and installation support, so the display cabinet can be quoted in the same package as the surrounding cabinetry, wall panelling and lighting. That keeps the cabinet, the surrounding cabinetry and the lighting on one production and logistics sequence instead of several separate ones.

Section 7 — Logistics and installation for a fragile, wired unit

A glazed, lit cabinet is the highest-risk item in a joinery shipment. Put the packaging and handling method in the brief: crating method, glass protection, whether doors are hung or shipped loose, and how the lighting components travel. Santerson's logistics and door-to-door delivery service covers freight forwarding, customs paperwork, packaging and container loading, with shipment tracking — so ask which of those appear on the quotation as line items.

Then close the loop on site. Installation and after-sales support is listed as a service, covering on-site installation, inspection and snags, with spare parts and maintenance support behind it. Agree in writing who provides the electrical connection at site, since that is normally a local contractor and it is the most common point where responsibility gets lost between two contracts.

A short brief template you can copy

Paste this into your schedule and fill each line. Empty lines are what turn into variations later.

Brief lineYour entry
Unit reference / room 
Overall W × H × D, and recess or stand-alone 
Bays: number, shelf pitch, shelf material 
Enclosure: open / glazed / mixed per bay 
Glass type and safety requirement 
Carcass and door material, finish code, sheen 
Hardware line and lock requirement 
Lighting: position, diffusion, colour temperature, dimming 
Driver location and access provision 
Back panel treatment 
Packaging, delivery route and site access limits 
Electrical connection at site — responsible party 
Sample approval date / required on-site date 

Before you send the enquiry

Three checks save most of the rework. First, confirm every dimension is taken from site conditions and not only from a model. Second, confirm the lighting detail exists as a drawing with driver access shown. Third, confirm finish samples are attached rather than described.

Dimensions, materials, finish options, storage layout, electrical ratings and installation requirements for this product are set per project configuration and must be confirmed with the supplier for each order; do not carry figures from a sample or another project into your own specification.

Send your elevations, shelf schedule and lighting layout for a made-to-measure display cabinet, and get a quotation built from the same line items you briefed.