A high gloss sliding door wardrobe looks simple on a rendering: two or three reflective panels gliding across a bedroom wall. In production and on site it is anything but simple. The finish amplifies every millimetre of out-of-square wall, the sliding mechanism dictates how much floor depth you can afford to lose, and the interior layout has to be decided before the door sizes are fixed. When the design intent and the procurement specification are not aligned, the result is a wardrobe that arrives late, sits proud of the skirting, or will not close properly.
Below is the alignment checklist we work through with designers, contractors and purchasing teams on residential villa and apartment projects — the same sequence we follow on bedroom joinery for projects such as the villas we have furnished in Willoughby, North Turramurra, Perth, Melbourne and Sydney.
1. Room Geometry: Whose Measurement Governs?
Sliding wardrobe doors run on a track and need a genuinely plumb and level opening. A designer's dimension taken off a drawing is not the same thing as a site dimension taken after flooring, skirting and plaster are complete. Agree early who takes the final measurement and at which stage of the build.
- Depth: sliding panels travel in front of the carcass, so overall projection is deeper than a hinged wardrobe of the same interior. Confirm the clear floor-to-ceiling depth available, including any ceiling cornice or floating floor build-up.
- Out-of-square walls: high gloss surfaces reflect light in a continuous band, so a wall that leans by a few millimetres becomes visible. Specify scribing or packing detail on the drawing rather than leaving it to the fitter.
- Obstructions: light switches, air-conditioning grilles, door reveals and bedheads all interfere with panel travel. Mark them on the setting-out drawing before door sizes are locked.
2. Finish: What "High Gloss" Actually Means on the Order
"High gloss" is a look, not a material. Two projects with identical drawings can end up with very different panels depending on the surface specified, and the two affect price, lead time and how the wardrobe behaves in daily use.
| Surface route | What to confirm before ordering |
|---|---|
| Acrylic panel, e.g. the white acrylic wardrobe range | Colour or RAL reference, panel thickness, edge treatment, and whether the reverse face is matched or standard. |
| Lacquer / painted finish, e.g. high gloss lacquer wardrobes | Number of coats, drying allowance in the schedule, and a signed-off physical sample panel — gloss level reads differently on a 600 mm door than on a sample tile. |
| Veneer with a high gloss surface, e.g. high gloss veneer wardrobes | Grain direction across multi-panel elevations, and whether grain continuity runs through the panel breaks. |
| Melamine with a glossy finish, e.g. glossy finish melamine wardrobes | Deco code from the board range, edge banding colour match, and suitability for the panel sizes on the elevation. |
3. Hardware and Panel Layout: Decide Together, Not in Sequence
Panel width, panel count and the track system are one decision, not three. A two-panel layout on a 2400 mm opening behaves differently from a three-panel layout on the same opening, and each mechanism has its own load limit per panel.
- Track type: top-hung or bottom-rolling, and whether the track is exposed or recessed into a head casing. This affects ceiling detailing and cleaning access.
- Load per panel: tall floor-to-ceiling panels are heavy; confirm the mechanism rating against the finished panel weight, not the bare board weight.
- Overlap and reveal: how much panels overlap at the meeting stile determines the visible gap when closed. Fix this on the elevation so the designer knows what shadow line to expect.
- Handles or push-open: a handleless gloss elevation reads cleaner but needs the mechanism and finger clearance designed in from the start.
Where a project wants a different door material but the same sliding geometry, keep the mechanism specification constant across the variations. That is how matte sliding door wardrobes in a secondary bedroom and gloss panels in the main suite can be delivered on one schedule and installed to the same tolerance.
4. Interior Layout: Fixed Before Door Sizes Are Locked
Doors hide the interior, so it is tempting to leave the internal fit-out open. But hanging heights, drawer banks and lighting all sit behind panels whose sizes are fixed early, and each one needs a dimension signed off before carcass panels are cut.
- Long-hang, double-hang and shelf zones mapped to the user's actual wardrobe, not to a generic template.
- Drawer banks positioned where they can actually be pulled out — sliding panels partially block the opening, so a drawer behind the overlap zone will never open fully.
- Interior lighting: power feed location, driver access for maintenance, and whether the fitting is surface or recessed.
- Matching interiors to other cabinetry in the same dwelling so carcass colours, edge thickness and hardware read as one package.
For bedrooms where an open or walk-in scheme is under consideration instead, we handle those as a separate specification — boutique style walk in wardrobes and minimalist open wardrobes have no door mechanism at all, but far stricter requirements on carcass finish quality, since everything is on display.
5. Commercial and Project Terms Buyers Should Fix Early
Designers specify the object; buyers control whether it arrives complete, on time and installable. The following items cause most of the rework on imported joinery packages.
- Sample approval before volume production — one full-size door sample or at minimum a panel in the actual finish, approved and signed.
- A single revision cut-off — after carcass cutting starts, layout changes become re-manufacture, not amendment.
- Packaging and pallet marking by room and elevation, so the site team can find the right panel without opening every crate.
- Delivery terms and who receives the goods — door-to-door freight is one thing; getting crates through a finished apartment lobby is another.
- Snag and spare-parts route — replaceable panels, mechanism spares and the contact for after-sales, agreed before handover.
How We Work to This Checklist
SANTERSON has manufactured furniture and building materials since 2008 and supplies made-to-measure bedroom joinery as part of a wider fit-out package, so wardrobes, cabinetry, flooring, wall finishes and lighting for the same dwelling come from one production schedule rather than five separate suppliers. Our interior design services cover space planning, drawings and production coordination; custom and OEM service covers bespoke finishes and prototyping; and logistics and door-to-door delivery plus installation and after-sales support cover the goods all the way to handover.
Every wardrobe we make is specified per project — dimensions, layout, surface and hardware are confirmed with the client before production. If you have drawings ready, send them and we will return a buildable specification with the gaps flagged. If the design stage is still open, our team can work from the room and the budget.
Send us your wardrobe elevation
Share the room dimensions, the finish reference you want, and how the interior should be organised. We will come back with a specification that closes the items above before anything goes into production.