A swim spa specification lives or dies on the details you send before production starts. For a configurable model such as our Outdoor Swim Spa WS-PC03, the difference between a smooth build and an expensive rework is usually a short, well-organised brief rather than a longer one. If you are sourcing a compact plunge-and-hydrotherapy unit for a villa terrace, a resort garden or a private wellness area, here is exactly what to put in front of the factory so the quotation and the delivered product match each other.

Start with the site conditions, not the model number

The catalogue entry for this unit lists a footprint of 3000 × 3000 × 1000 mm. Send us the finished dimensions of your slab or deck, the clear opening you can allow for access and delivery, and where the shell will sit relative to walls, glazing and planting. A square plan is often the easiest fit for a terrace corner or an indoor wellness room, but tell us early if the space is irregular so we can look at the Customizable Shape Outdoor Spa option, which covers square, round, oval and curved layouts.

Also state how the unit will be supported: fully recessed, partly recessed or freestanding on a prepared base. This changes the access panels, the insulation package and the way the steps are arranged.

Confirm what is included in the configuration

The published specification for this model shows one control system, one water pump, one filter pump, a jet total of 50 pieces with 4 water columns, and one LED light. Treat those figures as the reference point for your enquiry and then tell us what you actually intend to use the spa for — short cold plunges, daily hydrotherapy for guests, or a family soak in the evening. Jet layout and pump arrangement follow from that answer, not the other way round.

Reference configuration as published:

Footprint 3000 × 3000 × 1000 mm · control system 1 set

Water pump 1 pc · filter pump 1 pc

Jet total 50 pcs, including 4 water columns · LED light 1 pc

Total power 2.75 kW · features shown: water jets, LED lighting, ozone

Swim training system: not listed for this model

If lap or counter-current swimming is part of your plan, say so at the start. A swim training system is not listed for this particular model, and we would rather redirect you to a different unit in the range now than discover it during installation.

List the options you want priced, and those you do not

Catalogue-listed extras for this series include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so we confirm each item against the selected configuration before quoting. To keep the exchange short, send us a simple list:

  • Heating route — heat pump or electric heating, and the water temperature you expect to hold in your coldest month.
  • Water treatment — ozone is shown on this configuration; tell us whether you also want UV sterilisation and whether sand filtration replaces or supplements the cartridge filter.
  • Insulation level — driven by climate and how often the spa sits idle between sessions.
  • Access — entry steps, handrail positions and which side needs a service panel once the surround is built.

Give us the electrical and plumbing reality

The published total power figure for this configuration is 2.75 kW, and adding a heat pump or extra pumps changes that number materially. Please send the supply available at the site — phase, voltage and breaker capacity — together with where the electrical connection point will be relative to the spa. The same applies to drainage, filling and any overflow route. If a local electrician or plumber is holding the design, copy their requirements into the brief instead of leaving us to assume them; electrical requirements for the selected configuration are confirmed with your team before production.

Say who the spa is for

A private villa owner and a hotel operator ask different questions. For guest-facing installations, tell us the expected daily sessions, whether staff or guests control the settings, and whether the lockout limits on the control system need to be set for shared use. That information shapes the control package and the maintenance access far more than cosmetic choices do.

Bring your drawings with you. A plan view, a section through the surround, and one photograph of the site tell us more in a single message than several rounds of written questions.

What we send back

Once the brief is in, you receive a configuration sheet that names every included item and every option, so there is one document to sign against rather than an email chain. From there our Custom & OEM Service covers design and prototyping through to production, and the wider Turnkey Solutions scope handles logistics and site coordination when the swim spa is one line in a larger villa or hospitality package. If you are also furnishing the surrounding terrace, the same team works on the Swimming Pools and Swim Spas range alongside outdoor furniture, lighting and finishes.

Send the site dimensions, the intended use, the option list and the electrical facts, and the quotation you get back will describe the spa you actually need. For a project enquiry on this model, include the model reference in your message so we can check current configuration availability against it straight away.