Raised panel wardrobe doors look simple on a drawing: a frame with a field that stands proud of it. That relief is exactly what makes them fragile in transit. A flat slab can take a knock and be sanded out; a raised panel has moulded edges, a thin floating centre and a finish layer that shows every point of contact. Before you approve production, ask your supplier the packaging questions below and get the answers written into the order.
1. Assembled cabinet or flat-pack: which one are you actually buying?
This is the first decision, because it changes every other answer. Fully assembled carcasses with doors hung travel as bulky volumes and need edge protection at all four corners; knocked-down units save cube but put the joinery risk on site, since the panel edges and dowel holes are exposed at assembly.
Our Raised Panel Wardrobes are made to measure, with the layout, material and finish set per project, so the packing method is agreed together with the size and number of units rather than fixed in advance. Ask your supplier to state, in writing, which option applies to your order and what protection each variant carries.
2. How are the raised panel doors protected individually?
Doors are the part that comes back damaged. Confirm these points specifically:
- Corner protection on every door, not just the outer faces of a stack.
- A separator between adjacent finished faces — foam sheet, corrugated board or a soft interleaf, with the type named on the packing list.
- Panel orientation: doors packed upright and restrained, or flat with a rigid substrate under each one. Loose stacking of relief panels is what causes chipped mouldings.
- Edge banding already applied at the factory, so cut edges are not exposed to moisture on the voyage.
3. What is written on the carton or crate?
Markings are a practical tool, not decoration. For a multi-bedroom fit-out you want every bundle labelled with the room, unit code and bundle number of that package — for example "Bedroom 2 / Unit B / 1 of 3" — so the crew never has to open everything to find one part. A packing list should match those markings line by line, and fragile and this-side-up symbols should be printed where they apply.
Ask for a photo record of the packed goods before the container is loaded. It costs nothing and settles most damage claims at the destination.
4. How will the load be secured inside the container?
The packing specification should cover the container, not only the boxes. Worth confirming: whether units are crated or banded to pallets, what dunnage and corner boards sit between rows, whether straps and air bags hold the load against the walls, and whether panels travel on edge rather than flat. Humidity is the other item — for coated or wood-effect finish panels, ask whether desiccants or moisture barrier film are used for ocean freight.
As part of Furniture Logistics and Door-to-door Delivery, we handle packing and container loading together with the freight booking, so the packing method and the transport mode are decided in one conversation instead of being negotiated twice.
5. Who inspects, and when?
Agree the inspection point before shipping: photographs of finished doors before packing, an inspection report on packed goods, and a clear note in the order about what happens if a panel arrives chipped — replacement panel, refinish on site, or credit. If your project also includes matching Recessed Panel Wardrobes in other rooms, confirm that replacements are made from the same batch and finish run, otherwise a colour mismatch will show once everything is lit.
6. Does the packing match the site conditions?
A crate that fits a loading dock in one building may not clear a stairwell or service lift in another. Send your site access dimensions — lift opening, corridor width, turning radius, any basement constraint — and ask for bundle sizes that fit them. For villas and apartment fit-outs where storage on site is limited, staged delivery by room keeps the installation sequence workable.
A short list to send your supplier
- Assembled or flat-pack, and what protection each variant carries.
- Door-by-door protection: corners, separators, orientation, factory-finished edges.
- Room and unit markings on every bundle, matched by a packing list.
- Container method: crating, dunnage, strapping, humidity protection.
- Pre-shipment photographs and the damage-recovery procedure.
- Bundle sizes checked against your site access dimensions.
None of these questions are unusual, and a supplier who packs joinery for export will answer them quickly. If the answers come back vague, that is your signal to fix the specification before production starts — which is far cheaper than repairing a raised panel after six weeks at sea. Send us your drawings and site access details and we will confirm the packing method with the quotation.