A linen cabinet looks like a small line on a joinery schedule until it is the only place in the house where towels, bed linen and bathrobes can live. Get the depth wrong and folded sheets spill out of the doors. Specify the wrong panel for a humid bathroom wall and the carcass swells within a year. Order it late and the whole fit-out waits on one tall box.
Because our linen cabinets are made to measure for each project rather than supplied in fixed sizes, the quality of your enquiry decides the quality of what arrives. Below is the list of questions we would want you to ask us — and that any joinery supplier should be able to answer without hesitation.
1. Where exactly does it sit, and against which wall?
The same cabinet behaves very differently in a guest cloakroom, an ensuite and a dedicated laundry room. Before you request a price, confirm the room, the wall it sits against, and what shares that wall — a wet zone such as a shower or bath, a soil pipe, or a party wall you are not allowed to chase into.
- Is the cabinet on a bathroom wall exposed to shower spray and steam, or in a dry corridor?
- Which side of the tall unit is the door intended to open from, and does that swing clear the toilet, basin or a doorway?
- Are there concealed pipes, insulation or noggins behind the fixing line that we need to know about now rather than at installation?
2. What are the finished dimensions, and how much of them is fixed by the room?
Our tall cabinets are supplied with made-to-measure sizing, so width, height and depth are specified to the space instead of chosen from a size chart. That flexibility only helps if you tell us what cannot move.
- Finished floor level: has the flooring been decided, and does the cabinet sit on the finished floor or under it?
- Clear height available — including any ceiling rebate, bulkhead, skirting or cornice that the carcass must return around.
- Clear depth required once doors, handles and any plinth are included, not just the box.
Send us a dimensioned sketch with door swings and existing services marked. If your drawings are still at concept stage, our design team works from space-planning layouts and 3D renderings before anything goes into production.
3. What actually goes inside — and in what order?
A linen cabinet is a storage plan, not a furniture style. Tell us the inventory and the shelf layout writes itself.
| What you store | What to ask for |
|---|---|
| Folded sheet sets and duvet covers | Deep, evenly spaced shelves with enough front clearance to lift a stack out without disturbing the one below |
| Bath towels and pool or spa towels | Shelf heights matched to your folded towel stack, plus ventilation if the room runs humid |
| Bathrobes and dressing gowns | A hanging rail at the correct drop, with shelving above for spare linens |
| Toiletries, cleaning products, spare consumables | Smaller compartments or pull-out units so items do not disappear at the back of a deep shelf |
| Bulky or awkward items | An adjustable or removable shelf zone instead of a fixed grid |
Where the same tall unit also has to carry appliances or laundry functions, say so at the outset — that changes the internal layout, and it is where our multi function tall cabinets configuration starts rather than a standard linen box.
4. Which material and finish suits this room's conditions?
Our Tall Cabinets collection is offered with material and finish options, so the panel can be matched to how the room is used rather than picked for looks alone. Ask your supplier directly which board and surface they are proposing for a bathroom wall, and why.
- Is the specified panel suitable for the moisture level of this particular room, and what edge treatment seals it?
- Does the finish need to match an existing kitchen or wardrobe run in the same project? Send the door sample, laminate code or a photograph of the reference.
- Matte, high gloss, lacquer, veneer or textured surface — which one holds up to daily fingerprints and routine cleaning in this setting?
We produce bespoke finishes and textures under custom and OEM work, so a project can carry one consistent joinery language from the kitchen through to the bathrooms. Confirm the exact panel, edge and hardware specification for each configuration before sign-off.
5. Who is ordering it — one villa or a whole room repetition?
A single unit and a hundred identical units are different conversations. For apartment blocks, hotels and villa portfolios the questions change to consistency and control:
- Is every unit identical, or do layouts vary by room type? Send a room-by-room schedule.
- Which prototype or first-article unit gets approved before the balance is released?
- How are units labelled, packed and sequenced so the right cabinet reaches the right floor or villa?
Minimum order quantities are flexible on custom work, but they need to be agreed at quotation stage. Tell us the total unit count across the project as early as possible.
6. How does it reach site, and who fits it?
Tall cabinets are awkward freight: heavy, tall and easy to damage in transit. We handle freight forwarding by sea, air and rail with customs paperwork, packaging and container loading planning, and door-to-door delivery, so the units arrive where your team is working.
- What are the delivery terms and delivery address for this phase — central warehouse or individual sites?
- Are the units flat-packed or assembled, and can each piece pass through the site doors and lifts it will travel through?
- Who installs: our on-site installation support, or your own joiners working from our drawings?
- What spare parts and replacement supply do you need on hand for future room refreshes?
Import terms, duties and delivery scope are agreed case by case for each destination, so treat these as items to confirm in your quotation rather than assumptions.
7. What has to be confirmed before production starts?
This is the question that saves the most money. Production on made-to-measure joinery begins after detail confirmation, so every unresolved item must close first:
- Final dimensions and door orientation, signed against the latest architectural drawing.
- Selected panel, colour or veneer reference, edge band and hardware.
- Internal layout with shelf heights and any hanging rail positions marked.
- Wall conditions, services and fixing method at each location.
The shortlist to send us
A complete enquiry for linen cabinets arrives with the room and wall conditions, a dimensioned layout, the storage inventory, the finish reference, the unit count across the project, and the delivery location. With those six items we can return a quotation, detailed shop drawings and a production plan in one pass instead of three rounds of questions.
SANTERSON manufactures furniture and building materials under one roof, so the tall cabinets, vanities, wall panelling and other joinery in the same project are specified and produced to the same finish schedule. Send us your drawings and room schedule, and we will come back with a configuration that fits the space you actually have.