A long outdoor swim spa that pairs a swimming channel with a separate hydrotherapy relaxation pool looks simple on a rendering: two zones, one shell, a deck around it. In production it is a different object. Shell thickness, framing, pump positions, the split between exercise water and massage water, and how the whole unit travels to site all have to be settled before the first sheet of acrylic is formed. If you are specifying one for a villa terrace, a resort garden or an estate project, this is the list we ask buyers to work through with us before manufacturing starts.

1. The two zones: what the swim channel and the relaxation pool must each do

Our Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool is built around exactly this split — a long swimming channel at one end and a dedicated hydrotherapy relaxation area at the other, set on a terrace or timber deck. Before production, we need to know how each zone will actually be used, because usage drives engineering:

  • Swim channel: lap swimming against a current, aqua-fit sessions, or children playing? A training current needs the swim unit and a longer, straighter channel; casual play allows a shorter one.
  • Relaxation pool: seated hydrotherapy jets, a low-noise soaking area, or a family splash zone? Jet count and seat layout change the internal cavity.
  • Shared or separate water treatment: whether the two zones share one filtration circuit or run separately affects pump rooms and access hatches.

Write both usages down in one sentence each. That sentence is what we quote against, and it prevents a spa that swims well but never gets used for massage, or the reverse.

2. Shell, structure and exterior finish

The catalogue records an acrylic shell with balanced structural reinforcement on our Customizable Shape Outdoor Spa – Personalized Hydrotherapy Pool, and a robust acrylic interior with a reinforced cabinet on the Luxury Outdoor Swim Spa with Massage Jets, LED & Water Features. Confirm before production:

  • Shell material and gauge — acrylic is the standard we work to for these units; ask which reinforcement is specified for your length, since a long span behaves differently from a short one.
  • Cabinet and cladding — the extended model shows a sleek grey exterior; other configurations use wood-look cabinetry. Decide the finish now, not after the cabinet is framed.
  • Shape — square, round, oval and curved layouts are supported on the customisable range. A long run with a curved relaxation end is possible but changes framing and transport planning.
  • Insulation — listed as an option in the catalogue; it matters for running cost wherever nights are cool.

3. Dimensions, siting and the load path

The catalogue range runs from compact units to genuinely long ones, which is why dimensions belong in the pre-production conversation rather than at installation. For scale, the listed catalogue figures for three models in the configurable range are:

ModelCatalogue dimensions (L × W × H, mm)Features shown on site
WS-S383760 × 2080 × 1110Water jets, LED lighting, Ozone, Waterfall
WS-SP5005000 × 2500 × 1600Water jets, LED lighting, Ozone, Swim training system
WS-S1211740 × 2200 × 1470Water jets, LED lighting, Ozone

These are the figures transcribed from the product pages for those models. Treat them as reference points for space planning and confirm the dimensions of the configuration you actually order.

Then settle the site side with your engineer or builder:

  • Support — a full spa is a water load measured in tonnes. A terrace, podium slab or timber deck needs an approved load path and a fully bearing base, not point supports.
  • Access and crane route — a unit over ten metres long cannot be manoeuvred through a typical gate. Confirm the delivery route, lifting points and whether the site allows a single-piece install.
  • Drainage, overflow and plant access — service hatches need to stay reachable after the deck is laid.

4. Water systems, jets, lighting and power

Equipment lists vary by model and configuration, so the specification sheet must be read line by line before production rather than assumed from a photograph. On the captured pages for these models, jet counts range widely — six jets on the WS-SP500 and WS-SP600 configurations against several dozen on the larger S-series units — and total power figures listed on site run from around 7.65 kW to about 14 kW depending on model and equipment mix.

Confirm in writing, per configuration:

  • Pumps — number of water pumps, filter pump, and whether a swim training unit is included. Some captured models list the swim system; others do not.
  • Jets and water features — jet count, water columns, waterfall or spillover feature between the two zones.
  • Sanitation — ozone is shown on these models; UV sterilisation is a catalogue option. State which one you want.
  • Heating — heat pumps and insulation are optional accessories; heating load depends on your climate and target water temperature.
  • Lighting — LED counts differ by model, including small accent LEDs. Colour and placement should be fixed on the drawing.
  • Electrical supply — total power for the chosen configuration must be matched to the local supply, protection and earthing arranged by your electrician to the rules that apply at site. We confirm the equipment load; you confirm the supply.

5. Controls, tolerance and the approval drawing

A control system is listed on these models, but who operates what — spa side, automation integration, app control — should be stated in the order. Before we schedule production, we ask for sign-off on an approval drawing covering overall dimensions, seat and jet positions, equipment compartment layout, access hatches, finish samples and the electrical schedule. Anything not on that drawing is a variation later.

6. Manufacturing route: custom build or OEM

Long swim spas are rarely a catalogue click. Our Custom Furniture Manufacturer service covers bespoke design and prototyping, material and finish selection, and OEM manufacturing with flexible minimum order quantities — the same route we use for cabinetry, outdoor furniture and interior fixtures on villa and hospitality projects. For a swim spa this means the length, zone split, cabinet finish and equipment package are all confirmed against your drawing before tooling or forming begins.

7. Packaging, freight and handover

An oversized spa is a logistics problem as much as a product one. Our Furniture Logistics and Door-to-door Delivery service handles freight forwarding by sea, air and rail, packaging and container loading planning, customs paperwork and shipment tracking. For a long unit, ask us specifically about the container type, whether the spa ships whole or in sections, lifting requirements at both ends, and cargo insurance for the leg you are responsible for.

On arrival, Furniture Installation and After-sales Support covers on-site installation support, inspection and snags, spare parts and ongoing maintenance. For a spa, agree the commissioning sequence in advance: base acceptance, set and level, electrical connection by your licensed electrician, first fill, system test, handover record.

A pre-production checklist

  • Usage of swim channel and relaxation pool written down in one sentence each
  • Model or custom shape selected; catalogue dimensions checked against site plan
  • Structural sign-off for the water load, plus delivery and crane route confirmed
  • Equipment schedule fixed: pumps, jets, ozone/UV, heating, insulation, LED, control system
  • Electrical supply matched to the total power of the selected configuration
  • Approval drawing signed: dimensions, jet and seat positions, hatches, finish samples
  • Freight plan agreed: container type, whole or sectional shipment, lifting at both ends
  • Commissioning and handover sequence agreed before production is scheduled

SANTERSON has manufactured furniture and building materials for villa, hospitality and office projects since 2008, with a configurable range in the Swimming Pools and Swim Spas category. Send us your site photos, target length and how you intend to use each zone, and we will come back with a specification sheet and an approval drawing before anything goes into production.