A decorative metal screen rarely fails at the drawing stage. It fails at the handover between designer and fabricator, when "gold mirror with floral accents" means three different things to three different people. Below is the specification structure we work from on a custom gold mirror stainless steel screen with rose gold decorative accents, and the same fields apply whether you are buying one partition for a villa lobby or a run of screens across a hotel reception floor.
1. Location, opening and the job the screen has to do
Start with where the panel lands and what it must achieve, because every later decision follows from it. Give the fabricator:
- The room and elevation — hotel reception, banquet entrance, lift lobby, villa living area, clubhouse corridor.
- Whether the screen is a full-height fixed partition, a wall-mounted feature panel, or an embedded element in a joinery run.
- Clear opening dimensions at three points (top, middle, bottom), plus floor finish levels and any skirting, coving or reveal that the frame must clear.
- Sight lines: what the screen hides, and what it should frame when seen from the main approach.
- Whether light is intended to pass through it. A mirror-finish screen used as a backlit feature behaves very differently from one lit from the front.
Fixed interior partitions in hospitality and commercial fit-out are usually specified as space divider plus decoration in one element. Our laser-cut work for reception areas is built on that principle — solid structure, corrosion resistance and a surface that housekeeping can wipe down without special treatment. If your screen sits in a high-traffic public area, say so at this stage; it changes the mounting detail and the edge protection, not just the look.
2. Substrate, thickness and panel construction
Stainless steel is the base material for this product family, but a specification that stops at "stainless steel" is not enough to price or produce the job. Record:
| Field | What to state in your RFQ |
|---|---|
| Panel type | Solid sheet with laser-cut pattern, or open frame infilled with separate decorative elements. |
| Sheet thickness | State the thickness you need for the panel size and span. Thickness affects how fine a cut detail can be held, so fix it together with the pattern, not after it. |
| Panel count and joints | Total width divided into panels: number of panels, width of each, and whether joints are butt, revealed or covered by a mullion. Multi-panel configuration matters most on wide feature walls. |
| Framing and edge detail | Bare cut edge, folded edge, or perimeter frame. This is the detail most often left out of a drawing. |
| Fixing method | Floor-to-ceiling bracket, wall angle, embedded fixing in joinery, or freestanding with stabilisers. Note the substrate you are fixing into — concrete, steel frame, plasterboard or timber stud. |
Send actual dimensions rather than a scaled drawing alone. We fabricate to exact dimensions from your drawing, photo or reference, but a scaled PDF and a set of site-measured numbers occasionally disagree, and the site numbers win.
3. Finish: mirror gold ground and rose gold accents
Finish is where written specifications go wrong most often, because "gold" covers a wide range of tone and reflectivity. Specify it in three parts:
- Ground finish. The main field of the panel — for this product, a gold mirror finish. State whether you want a true reflective mirror surface or a softer brushed gold, since a mirror ground reflects the room and any object in front of it.
- Accent finish. The decorative elements sit in a second finish, here rose gold. State which parts carry the accent: the floral motifs only, or also the frame, mullions and border trim.
- Surface protection. Fingerprints and cleaning frequency are practical concerns on a mirror surface at reception height. Ask what protective coating is applied and what cleaning agent the finish should be maintained with.
Other finishes in the same product family are worth putting in the comparison column of your evaluation. A custom gold stainless steel laser cut decorative screen partition uses a gold mirror ground with a fully cut pattern and no second-colour accent, which reads as a cleaner, more uniform surface. A custom bronze stainless steel laser cut decorative screen partition takes the opposite direction — an antique bronze ground with reduced reflectivity, usually specified in a multi-panel configuration across a wide wall. Requesting one sample panel per finish you are considering is the fastest way to settle tone under your own lighting.
4. Pattern and decorative elements
For a screen with applied decoration, the pattern note needs more than an image. Provide:
- A reference drawing or photograph of the motif, with the scale it should be reproduced at — floral detail size relative to panel height, not just a picture.
- Whether the motif is cut from the same sheet, applied as a separate layer over the panel, or embedded into a recessed feature wall build-up. Each gives a different shadow and a different cleaning profile.
- Repetition rule: single feature composition, symmetrical pair, or repeating module across the panel run.
- Cut quality expectations for interior corners of the pattern, since laser cutting has practical limits on how tight an internal radius can be.
If you do not have artwork yet, send the reference image and let the workshop return a production drawing for your sign-off before cutting. A custom laser cut metal screen for hotel reception is usually developed this way: hollow pattern first confirmed on paper, then light-and-shadow behaviour checked against the intended lighting scheme.
5. Documentation to attach to the enquiry
A complete enquiry lets the fabricator return a real quotation instead of a range. Attach:
- Marked-up elevation with site-measured dimensions and floor finish levels.
- Finish schedule naming ground finish, accent finish and the parts each applies to.
- Pattern reference with scale and repetition rule.
- Fixing detail and the substrate it fixes into.
- Quantity, panel breakdown, delivery address and installation responsibility.
Where this fits in a wider fit-out package
Screens are rarely ordered alone. In villa and hospitality projects they usually sit alongside joinery, wall panelling, lighting and flooring, and the same finish has to read consistently across all of them. Ordering through a one-stop furniture and building materials supplier means the screen, the paneling it is embedded in and the surrounding cabinetry come from one production schedule with one set of finish references — which removes most of the coordination arguments on site. Our custom and OEM service covers bespoke finishes, prototyping and flexible order quantities, so a screen can be developed to your drawing rather than fitted to a standard catalogue size.
Checklist before you release the order
- Dimensions taken on site, not from a design-stage plan.
- Panel count and joint positions agreed with the surrounding finishes.
- Ground and accent finishes confirmed against physical samples.
- Production drawing signed off before laser cutting starts.
- Fixing method and substrate confirmed by the site team.
- Delivery route, packaging and installation responsibility written into the order.