An integrated media storage wall looks simple on a drawing: a panel-clad elevation, a recess for the screen, some closed cabinets below. On site it is one of the most coordination-heavy items in a villa or apartment fit-out, because the joinery has to work around a screen, cable runs, ventilation and often an existing structural wall. Most disputes on these packages do not come from the layout. They come from finish details that were never written down before production.
Our Santerson Integrated Media Storage is part of the Integrated Storage Walls collection, and finish, layout and dimensions are specified per project rather than chosen from a fixed size range. That flexibility is the point of the product, and it is also why the confirmation list below matters. Here is what we ask buyers and specifiers to settle before we start manufacturing.
Start with the screen, not the cabinet
The recess for the display sets the geometry of everything around it. Before we draw anything, we need the exact model or at least the mounting envelope you intend to use: screen size, depth behind the bracket, and how the bracket itself fixes to the wall. A large panel on a fixed arm and the same panel on a full-motion arm produce very different pocket depths.
Two details cause the most rework:
- Flush or proud. Decide whether the screen sits level with the surrounding panel face or projects from it. A flush install needs a framed rebate, clear access behind the panel and an agreed service gap all round; a proud install is simpler but changes how the shelving beside it reads.
- Cable route. Specify where power, HDMI and any speaker cable enter the wall, and how far they must travel. If the route passes through our carcass rather than the substrate, we pre-cut and finish those openings in the factory instead of on site.
Match the veneer direction across the whole elevation
Finish approval on a media wall is never one sample in hand — it is several surfaces read together. Veneer-wrapped carcass, veneer doors and a veneer feature panel can each look correct alone and clash once they are side by side, because the grain run, the cut and the book-match were decided separately.
What we confirm with you:
- The substrate and finish for every visible component, listed separately rather than as one blanket specification. Our matte wood veneer cabinets show the kind of grain-led finish clients pair with a media wall, and the same finish logic carries across our built-in ranges.
- Grain direction on each panel — vertical or horizontal — and whether panels are book-matched or sequence-matched. We mark this on the elevation drawing.
- Edge treatment: solid timber edge, wrapped edge or a shadow gap between panels. Wrapped edges read cleaner on dark finishes; solid edges take impact better in high-traffic rooms.
- Where the finish stops. If the media wall meets plaster, stone or a floor finish, we need to know which material takes the transition and what joint is expected.
We send physical samples for the exact combination you have chosen, not a generic catalogue card, and ask for sign-off on the sample against the drawing. That single step prevents most colour and grain arguments at handover.
Decide how open the wall should be
Media walls fail in two opposite ways: too much display, so everyday clutter is permanently on show, or too much closure, so remote controls, consoles and documents end up on the coffee table anyway. The split between open and closed is a finish decision as much as a storage one, because it changes how many edges, reveals and internal faces are visible.
If you want both, our Santerson Mixed Open & Closed Storage configuration is the usual starting point. For display pieces and objects, open display niches let you frame items inside the panel line. And if you would rather the screen disappear entirely when it is off, sliding storage panels in the same collection carry the same finish across the front of the wall.
For each open bay, confirm the internal face material and the shelf depth. A niche finished only on three visible sides is cheaper, but it looks wrong the moment a book is placed against the unfinished back. We would rather price the full lining up front than explain it later.
Ventilation and access behind the panel
Equipment generates heat, and enclosed cabinets trap it. Where components sit inside the carcass, we agree a ventilation strategy with you — vented base or top rails, cut-outs in the back panel, or a fully open-backed bay — and confirm which of those your equipment supplier is willing to stand behind. Clearances are not something we leave open.
Also settle how the wall is accessed for servicing: removable panels, hinged doors, or lift-up fronts with specified hardware. A wall that looks perfect but cannot be opened without a specialist is a maintenance problem for whoever owns the building after handover.
Lighting inside the joinery
Integrated lighting changes what a media wall costs and how it is built, so it belongs in the finish confirmation rather than being added at the end. Confirm which niches and shelves are lit, whether drivers must sit behind an accessible hatch, and where the switch or control sits once the room furniture arrives. Our integrated cabinet lighting can be specified together with the joinery, so the profiles, channels and wiring are cut during production.
The practical details that decide whether it fits
- Room dimensions taken from the finished floor and finished wall, not the structural shell — including skirting, architraves and any floor build-up still to come.
- Wall construction and load path: what the screen bracket and heavy upper units actually fix into, confirmed with your site team.
- Split and module widths checked against door openings, lifts and stairwells at both ends of the shipment. Module sizes are set so the pieces can be carried in and assembled on site.
- Hardware specified by brand and model in the order — hinges, slides and any sliding-panel track — with the fitting responsibility agreed for each item.
- Protection and packing spec for transit, since a veneer panel that arrives chipped cannot be touched up convincingly on site.
- Delivery sequence against wet trades, so the joinery goes in after plastering and painting are complete.
What happens after you send the drawings
As a China-based furniture and building materials manufacturer, we build these walls to your dimensions and finishes rather than to a fixed catalogue size, and coordinate them in one package with the rest of the built-in joinery — wardrobes, kitchen cabinetry and panelling — so veneer, hardware and edge detailing stay consistent across the project. Our custom and OEM service covers bespoke material, finish and texture choices, and logistics and door-to-door delivery handles the freight side.
Our cooperation follows three steps: project brief and design proposal, then quotation and detail confirmation, then production and shipment with follow-up. The detail stage is where everything above gets recorded — dimensioned elevations, a component-by-component finish schedule, sample sign-off, and the hardware list. Nothing goes into production on an assumption.
If you have drawings for a media wall — even a sketch with one room dimension on it — send them to us with the screen you are considering. We will come back with a proposed layout, a finish schedule listing what still needs your approval, and a quotation built on that schedule rather than on a placeholder specification.