A drawer-heavy wardrobe is one of the easiest fit-outs to get wrong and one of the hardest to correct after panels are cut. Shelves can be moved, rails can be swapped, but a bank of drawers set into a carcass has to sit level, clear the door swing and take the weight it was designed for. That is why our workshop asks for more than a room width before quoting Drawer Focused Modular Wardrobes. This guide sets out the measurements and project inputs we need from architects, builders and procurement teams so a made-to-measure drawer layout comes back right the first time.
Why drawers change the information you need to supply
Modular wardrobes are built from repeating carcass modules, and the built-in furniture range is specified per project for size, finish and internal layout. Within that system, drawers introduce fixed constraints that hanging and shelving do not:
- Each drawer needs a clear front approach. A drawer pulled out cannot pass through a door that opens into it, so the door type and hinge side decide where a bank can sit.
- Drawer heights are set by what is stored inside them — folded clothing, bedding, accessories or documents — not by an arbitrary grid.
- A tall stack of loaded drawers transfers real weight to the base and to the wall behind. Floor level and wall construction matter.
- Once a carcass is drilled and edged on the production line, moving a drawer bank means rebuilding the module.
The point of supplying complete information at enquiry stage is simple: it lets us resolve those constraints on paper instead of on site.
The measurements that actually matter
Take dimensions at several points, not one. Older villas and renovated apartments rarely have square corners or flat floors, and a single reading hides the problem.
| Measurement | How to record it | Why we need it |
|---|---|---|
| Width of the wall run | Floor to ceiling height at left, centre and right; width at high, mid and low level | Shows out-of-plumb walls and floor falls, which decide scribing and plinth detailing |
| Depth available | Deepest point to the finished floor line, plus any skirting, architrave or radiator that projects | Sets carcass depth and whether drawers can run full extension |
| Obstructions | Position of switches, sockets, downlights, air grilles, pipework and beams, measured from a fixed corner | Cut-outs and service access must be planned into the module, not trimmed on site |
| Door and window openings | Reveal sizes, opening direction, handle projection | Determines whether sliding, hinged or open fronts are workable along the run |
| Ceiling condition | Whether a cornice, bulkhead or recessed track runs across the wall | Affects top finishing and whether the unit can reach the ceiling line |
| Floor finish build-up | What floor covering is still to be laid, and its thickness | The base must be set to the finished floor level, not the bare slab |
Where drawings exist, send them. A scaled plan with room names is more useful to us than a list of numbers typed into an email, because it shows how the wardrobe relates to circulation space and to neighbouring joinery.
Project inputs beyond the tape measure
For a drawer-focused layout, the following decisions shape the quotation as much as the dimensions do. Supply them with your enquiry and we can return a drawing rather than a series of questions.
- What goes into the drawers. Folded garments, linens, shoes, toiletries or office supplies each call for different drawer heights and, in some cases, dividers or soft-close runners.
- The split between hanging, shelving and drawers. If you already know how much long-hanging you need, say so; otherwise we can propose a ratio. Where the balance is uncertain, Combination Modular Wardrobes is often the more forgiving starting point.
- Door style and opening clearance. Sliding fronts save floor space but limit how much of the run is open at once; hinged doors need an arc in front of them; open fronts remove the question entirely, as in Open Modular Wardrobes.
- Room type and use intensity. A principal bedroom, a guest room, a staff changing area and a hotel suite are loaded differently, and drawer count should follow that usage.
- Finish direction. Send the joinery schedule, paint or laminate reference, flooring tone and hardware preference. Veneer, lacquer, acrylic, melamine and glass fronts all sit in the same wardrobe categories on our site but behave differently under hand and light.
- Quantities and phasing. One unit for a villa and forty units across an apartment block are quoted and packed differently. Tell us the number of rooms and whether delivery is staged.
How to measure accurately without a site visit
Most projects are specified remotely, so a few habits save weeks:
- Photograph the wall run straight on, from both ends and from the centre, with a tape visible against the wall.
- Mark your measurement points with tape on the floor or wall so the photographs and the numbers refer to the same places.
- Note the direction of any floor fall — which end sits lower — rather than only the difference.
- Record skirting height and thickness; a unit that butts against an old skirting board needs a cut-out detail agreed in advance.
- If the floor covering has not yet been laid, confirm the intended build-up thickness and who is responsible for laying it.
From measurement to manufacturing
Our interior design services cover space planning, furniture layouts and 3D renderings, so a drawer arrangement can be reviewed visually before anything is cut. The cooperation steps we work to are straightforward: brief and proposal, then quotation and detail confirmation, then production, shipment and follow-up. Panel sizes, internal layout and finishes are confirmed with you in drawings before the order enters production.
Because SANTERSON supplies furniture and building materials for the same project, wardrobe joinery can be coordinated with matching built-in kitchen cabinets, wall panelling, doors and flooring from one production programme. For enquiries where sizes, materials or branding need to change, our custom and OEM service covers bespoke design, prototyping and finish selection.
Freight, installation guidance and after-sales support are arranged through the same project channel — see logistics and door-to-door delivery and installation and after-sales support.
Send us your drawings
If you have plans, elevations or a joinery schedule for the bedrooms in your project, send them to us with the room list and target programme. We will come back with layout options and an itemised quotation for the wardrobe modules, including drawer banks sized to the way the rooms will actually be used. Contact SANTERSON by phone or WhatsApp on +86-13928214007 (attention PHILLIP), or email santerson@qq.com.