Integrated door and paneling looks simple on a rendering: one continuous wall surface, a door that disappears into it, no visible frame, no handle breaking the plane. In production it is one of the least forgiving items in a joinery package, because the door and the wall finish are made by different trades on different schedules and have to meet within a few millimetres. Before a custom Integrated Door & Paneling order goes into manufacturing, the following decisions should be closed out in writing.

1. The opening: sizes, not just a door width

A standard door is bought to a nominal size and the wall is built around it. Integrated paneling works the other way round — the panel layout drives the opening. Confirm the finished floor level first, because an integrated leaf normally runs down to it, and any later change in screed or tile build-up throws the whole elevation off. Then confirm the clear opening width and height at the finished surface, the wall build-up and its total thickness, and where the leaf will swing or slide when open.

Also fix the reveal strategy early: whether the leaf sits proud, recessed or flush with the panel face, and how the shadow gap between door and panel is expressed. A 3 mm versus 6 mm gap changes the frame detail, the hardware choice and how the joint reads in raking daylight.

2. Swing, sliding or concealed: hardware decided before the panel is cut

Hardware cannot be treated as a later accessory purchase. A handleless concealed door needs an opening mechanism, a specific hinge type and a load rating matched to the finished leaf weight, including the panel cladding on top of it. A pocket or sliding version needs the wall cavity deep enough for the leaf plus the track, which must be decided while the partition is still being framed.

For each opening, confirm: the hinge load rating against the finished leaf weight; whether an invisible pivot or concealed hinge is required; the latch and edge-pull detail; the maximum leaf size the chosen hardware supports; and whether the ironmongery comes from your project schedule or is supplied with the door set. Where the design intent is a decorative surface rather than a plain flush face, a decorative concealed door variant should be specified at this stage, because the leaf core and edge detail change with the finish.

3. Finish continuity: the point that decides whether the wall reads as one surface

The whole value of integrated door and paneling is that the leaf carries the same face as the surrounding wall panels. Confirm the exact finish specification for both: species and cut for a veneer, board number and sheen level for a lacquer, and the grain direction and matching rule across the leaf and adjacent panels. For wood veneer panels, ask which logs or batches are being used, whether the leaf and the wall panels are laid up from the same batch, and how many leaves share that batch.

Also confirm the substrate behind the finish, since a bathroom or wet area needs a moisture-resistant core and an edge treatment suited to it, while a bedroom wall does not. Where the paneling runs through a bathroom zone, say so explicitly in the order rather than assuming the factory will infer it.

4. Interface details that are usually left out of the drawing

Ask for the setting-out drawing to show these items before sign-off:

  • Where each panel joint falls relative to the door edge, and whether joints are allowed to land mid-leaf.
  • Cornice, skirting and architrave treatment — integrated systems usually delete architraves, so the top and bottom conditions need their own detail.
  • Acoustic expectation. If a speech-level separation is required, say so when specifying; it affects the leaf build, seals and threshold. Where room division rather than a single opening is the requirement, acoustic panels are a different product family and should be raised before the layout is fixed.
  • Services behind the wall: switches, trunking, access panels and any concealed storage hardware that will be cut into the panel face.
  • Circulation clearance for the open leaf, especially in corridors and bathroom entries.

5. Measurement, packaging and sequence on site

Made-to-measure work should be measured from the completed substrate, not from construction drawings, and each opening should be re-checked against the shop drawing before production starts. Confirm who takes the measurements and at which site stage.

Then confirm delivery sequence. Panels installed before the door sets arrive usually have to be cut back or protected for weeks; door sets delivered without a dry, secure store on site are a common source of damage claims. Agree packing specification, container or crate arrangement, labelling by room and elevation, and which package arrives first.

6. What should appear on the approval drawing

Before releasing production, one drawing per wall should carry: elevation with every panel joint dimensioned; door leaf size, swing direction and open position; hardware schedule with load ratings; finish code, board or batch reference and grain direction; reveal and shadow-gap dimensions; top and bottom conditions; and the access and services cut-outs. Anything not on that drawing will be decided by whoever is standing at the bench.

Working from design intent to a fixed order

SANTERSON produces integrated door and paneling as made-to-measure work, with material, finish and layout specified per project rather than chosen from a fixed catalogue. The same team also supplies the surrounding fit-out — wall systems, storage walls, wardrobes, vanities and cabinetry — so a single production package can carry the whole elevation instead of splitting it between suppliers whose tolerances never meet.

Our project workflow runs from site measurement and 3D rendering through manufacturing, door-to-door delivery and on-site installation. Send us the room elevations, the wet and dry zones, your ironmongery schedule and the finish reference, and we will return a shop drawing that lists every item above for sign-off before production begins.