A swim spa is easy to specify and hard to schedule. By the time the pool package reaches the site, the deck loadings, the power feed, the drainage line and the surrounding paving have usually been fixed by other trades — and none of them were drawn around the shell you are about to deliver. This article walks through how to place Outdoor Swim Spa WS-S06B inside a whole-project materials schedule, so that the spa is treated as a permanent element of the build rather than an afterthought purchase.

Why swim spas fall out of the materials schedule

On most villa and resort packages the swimming pool sits in its own line item, quoted separately from furniture, joinery, flooring and external finishes. That separation is convenient for procurement but dangerous for coordination. The spa shell carries water, needs a plant area, wants a hard level base, and its control system has to sit somewhere a resident or maintenance technician can reach. Every one of those requirements belongs to another trade.

SANTERSON works the other way round. As a furniture and building materials manufacturer supplying villas, hotels and offices, we schedule the spa alongside the poolside loungers, the pergola, the paving, the cabinetry and the lighting — one package, one set of drawings, one shipment plan. The Swimming Pools and Swim Spas range is then coordinated with the Outdoor Furniture collections that surround it, instead of arriving on a different month and a different vessel.

What WS-S06B brings to the schedule

WS-S06B is a configurable outdoor swim and hydrotherapy spa. The figures below are the catalog values for this model; confirm the exact configuration, included equipment and electrical requirements with us before you lock the specification into your bill of quantities.

ModelWS-S06B
Catalog dimensions5800 × 2200 × 1250 mm
Jet total48 pcs
Water pump / filter pump3 pcs / 1 pc
Control system1 set
LED lighting3 lights, plus 26 small LED lights
Total power (catalog)13.35 kW
Features shownWater jets, LED lighting, Ozone, Waterfall

Two of those lines change the construction programme more than anything else. A total power figure in the tens of kilowatts means the electrical contractor needs a dedicated feed and protection from the first fix, not a spur added at handover. And a waterfall feature means an overflow or splash line that the paving team has to detail correctly — including where the water lands and how it returns.

Catalog-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the option list you schedule must be the option list you confirm on the quotation.

Six lines to add to your materials schedule

1. The shell itself, with its footprint reserved early

Enter the spa as a named line item with the catalog dimensions and a note that the base, surround and access are dependent on it. A 5800 × 2200 mm shell sits badly against a paving module chosen without reference to it; set the paving grid around the spa outline, not the other way round.

2. Power, control and lighting circuits

Schedule the supply, isolation and control position as a builder's work item. The control system needs to be reachable for daily use and for servicing, which usually means relocating it away from the first position the paving layout suggests.

3. Filtration, ozone and any water treatment options

The filter pump and the ozone system need a ventilated, weather-protected plant area with room to remove a cartridge or service a pump without lifting the deck. If you schedule UV sterilisation or sand filtration as options, that plant area grows.

4. Drainage, overflow and the waterfall line

Backfill, fall to drain and the overflow arrangement should be drawn together with the pool contractor's notes. Waterfall models fail at the detail stage far more often than at the equipment stage.

5. Base, access steps and delivery route

A fully insulated spa with optional steps arrives as a heavy unit on a crane or a gantry. Confirm the delivery route, the lifting point and the finished level before the surrounding structure closes in around the site.

6. The poolside furniture that finishes the space

Loungers, daybeds, pergolas and outdoor dining sets should be scheduled with the same lead time as the spa. Poolside collections in aluminium frames with teak-look slat tops or rope weave are specified for exactly this setting — wet decks, strong sun and constant use. Order them as one package and they arrive on one container with one installation visit.

Where the spa sits in a turnkey programme

When the swim spa is part of a single supplier's scope, it moves through the same six stages as every other element of the project: consultation, design and planning, production, logistics, installation and after-sales. That matters on site because the coordination points are already built into the programme.

Design & planning

Spa footprint, plant area, power and drainage resolved on drawings with the interior and landscape schemes.

Production

Shell, jets, lighting and options built to the confirmed configuration; poolside furniture produced in parallel.

Logistics

Consolidated container loading with the rest of the package, paperwork prepared for import clearance.

Installation

Set, connect and commission against the same site programme, with snags listed once.

After-sales

One contact for warranty queries and spare parts across the poolside scope.

A practical checklist before you lock the specification

  • Configuration confirmed in writing — jets, lighting, ozone, waterfall, and any heat pump, insulation or steps added.
  • Electrical load agreed with the engineer against the catalog power figure, with supply and isolation on the drawing.
  • Plant area dimensioned for the filter pump and treatment options, with service access that does not require lifting the deck.
  • Overflow, splash line and drainage detailed with the paving module.
  • Delivery route, lifting method and finished floor levels confirmed before surrounding works close.
  • Poolside furniture, pergola and lighting scheduled to the same lead time and the same container.

Talk to us about your pool package

Send us the drawings and we will return a coordinated schedule for the spa, its options and the poolside furniture around it — as one line of the whole-project materials list rather than a separate purchase. Through our Turnkey Interior Project Solutions we handle design coordination, production, freight and site follow-up for villa and hospitality projects, with door-to-door delivery arranged by the same team that built the schedule.