A black frame wardrobe with glass panels looks simple on a drawing. That is exactly the problem. When a detail is reduced to two lines and one dark profile, almost nothing hides the mistakes: uneven wall flatness, a door that fouls the skirting, a handle that should not be there, a glass tone that reads green instead of grey. Before your order goes into production, the following decisions need to be closed on paper, not in conversation.

1. The opening: dimensions taken from finished surfaces

Send a drawing that states width and height at three points across the opening — left, centre and right — plus floor-to-ceiling height at both ends. Plasterboard and screed rarely hold a constant dimension over two metres, and a made-to-measure unit follows whichever number you confirm. State whether the stated size is the clear opening or the finished outer face of the carcass, and say what happens to the gap: scribe filler, concealed reveal, or a shadow gap filled on site.

Also confirm ceiling details early. A cornice, a recessed curtain track, a sprinkler head or a light fitting that lands where a door leaf travels will change the layout after the panels are cut.

2. Door type and clearance, not just appearance

Black framed glass doors are usually specified as hinged or sliding, and each has a physical cost you should budget for before approving a layout. Hinged leaves need a clear swing arc in front of the wardrobe, which is the first thing lost in a narrow bedroom or an en-suite passage. Sliding leaves need a wall or return panel long enough to receive the leaf when open, plus headroom for the track. If your plan shows a bed or a doorway close to the run, ask for the swing and travel diagram before production.

Where the bedroom is tight, our glass sliding door wardrobes are specified with the track and stop positions drawn to the same sheet as the elevation, so the buyer sees the overlap before the panels are cut.

3. Frame profile, colour reference and finish

"Black" is not a specification. Confirm the coating system, the sheen level and an actual physical sample under the site's own lighting — matt black against a warm 2700K bedroom lamp behaves very differently from the same profile under a cool corridor fitting. Then confirm the profile itself: sightline width, whether the mullions are slim or structural, and how the corners are joined. In our minimalist black frame wardrobes, the aluminium frame and glass panel are one assembly, so the profile width you approve is what appears on every elevation — there is no site-made trim to correct it afterwards.

4. Glass: type, tone and transparency

Decide first whether the contents should be visible. Clear glass shows the interior layout, which suits a styled walk-in but exposes a cluttered shelf in a guest room. Frosted, ribbed and smoked options reduce visibility to different degrees, and each shifts the colour of the light entering the room. Confirm the glass thickness, whether it is tempered for the panel size you have, and which face carries the coating if you choose a tinted or reflective option.

Ask for one full-size sample of the glazed door leaf, not a swatch card. A small tile cannot show banding, reflections or how much of the interior you actually see from bed height.

5. Interior layout built around what you store

Draw the interior before the exterior. Confirm hanging zones by garment length — short hang for shirts and folded stock, long hang for coats and dresses — plus drawer banks, shelf depths, a shoe plinth, lighting inside the carcass and provisions for a safe or an ironing unit. For projects where storage capacity drives the design rather than the elevation, our custom minimalist bedroom wardrobe is built to the same brief: sizes, internal layout, door style and surface finish are fixed together before any panel is cut.

Where a run combines wardrobes with vanity units or tall storage, ask for the whole wall on one sheet. Splitting it across suppliers is where reveals, skirting breaks and mismatched finishes appear.

6. Substrate, fixings and site conditions

Confirm what the wardrobe is fixed to. Plasterboard partitions need noggins or a steel backing at the fixing lines; masonry needs the correct anchor type; a floating floor must not be trapped by the carcass. Confirm floor finish levels too — if the screed or tile has not been laid, the height you approve now will not be the height on site later.

Confirm humidity and heat sources near the unit: an en-suite without extraction, a wall-mounted heater, or an unheated coastal property all affect board choice and edge treatment. Ask which board and which edge banding or lacquer system you are getting for that environment.

7. Documentation to sign before production starts

  • Signed elevations with every dimension, plus the plan showing door swing or travel.
  • A finish schedule naming frame coating, glass type and colour reference for each opening.
  • Interior layout drawings with hanging heights, drawer counts and shelf depths.
  • Hardware specification: hinges, runners, handles or handleless mechanism, soft-close provisions.
  • A packing and marking list keyed to room numbers, so a multi-unit delivery can be sorted on site.

For projects that need this package prepared rather than supplied, our interior design services cover space planning, elevations and 3D renderings before production is scheduled.

8. Delivery, sequencing and after the wardrobes arrive

Confirm the delivery address, the receiving hours, whether the site has lift access for long panels, and who signs for each crate. Tall glazed leaves need a route that is clear on the day they land. Then confirm where the wardrobes sit in the programme: they usually install after painting and flooring are complete, but before final joinery touch-in, and any adjustment visit costs less before other trades demobilise.

As a one-stop furniture and building materials supplier, we produce wardrobes alongside the flooring, wall finishes, doors and lighting they sit next to, which keeps one party accountable for the whole wall rather than a single element of it.

Checklist before you release the order

  • Opening measured at multiple points, with finished surface levels stated.
  • Door type agreed against clear floor space and travel room.
  • Frame colour and sheen approved from a physical sample on site lighting.
  • Glass type, tint and transparency approved from a full-size leaf.
  • Interior zoning drawn to your actual storage list.
  • Fixing substrate and backing confirmed with the site team.
  • Elevations, finish schedule and hardware list signed off.
  • Delivery route, marking and installation window agreed.

Send us your elevations, a photograph of the opening and the room's lighting plan, and we will return a wardrobe specification with frame profile, glass option and internal zoning priced as one assembly — including production, packing marked to room number, and delivery coordination for the rest of the fit-out.