A toilet specification that reaches the factory as a single sentence usually comes back as a sample nobody can approve. The model is right, the shape is close, and then the rough-in does not match the soil pipe on site. Our 1003A washdown one piece toilet is a modern vitreous ceramic WC used in villa, hotel and apartment bathrooms, and it is a good example of a product where the drawing notes matter more than the photograph. This guide sets out what to send us so the quotation, tooling and shipment all line up the first time.
Start with the drainage layout, not the style
Drain type decides whether a toilet can be installed at all, so put it in writing before anything else. The 1003A is offered with two configurations: a P-trap wall drain with a 180 mm rough-in, and an S-trap floor drain with a 250 mm rough-in. Both appear on the product page, but they are not interchangeable on site, and the difference only becomes expensive once pallets have been booked.
A brief that simply says "floor outlet" is not enough for a project order. Send the measurement from the finished wall face to the centre of the waste, say whether the wall finish is already set or still to be tiled, and confirm the floor build-up if the screed depth has changed since the drawing was issued. If a bathroom has both layouts across floors, list them by room type so we can split the quantities instead of shipping one trap type for the whole building.
What to state about the bowl and flushing
The 1003A uses washdown flushing with a one-piece body, so there is no gap between cistern and pan for dirt and bacteria to collect. That single construction choice drives several cleaning habits in a hotel or a rental villa, and it is worth naming explicitly in your enquiry if housekeeping standards are part of the decision.
Tell us what the specification document says about the following, even where the answer is "as per product page":
- Flush mechanism type and whether a seat is included in your bill of quantities or ordered separately.
- Ceramic finish — the 1003A has a dense glossy glaze intended to resist staining and limescale, which is what most project buyers keep; if you want a different surface treatment, ask before tooling rather than after.
- Whether the pan shape must match an existing suite already installed in other rooms.
- Certification wording your client or consultant requires on the paperwork. The 1003A is listed as CE certified; if your market needs additional documentation, request it with the quotation so we can check current test reports before production.
Specify the whole room, not one fixture
Bathrooms read better and buy cheaper when ceramics are grouped by series. The 1003 sits alongside other pieces in our catalogue: a freestanding pedestal basin with a tapered round silhouette, and a compact wall hung ceramic basin for smaller guest WC layouts where a cabinet is not needed. Where the design calls for wall-hung WCs instead of floor-standing units, we also produce rimless wall mounted pans such as the wall hung toilet 1051W, which leaves the floor clear for mopping.
Send a fixture schedule by room type. A two-line entry per bathroom — WC type, basin type, trap type, quantity — lets us check consistency across the building and warn you when one floor mixes series that will not match visually once installed.
Send quantities and phasing early
Ceramics are heavy, breakable and slow to replace mid-project, so order structure matters as much as the product itself. Tell us:
| Item in the brief | Why we need it |
|---|---|
| Total quantity per fixture type | Sets mould planning and production slot. |
| Delivery split by phase or building | Avoids storing months of stock at your site. |
| Packaging preference | Affects container loading and breakage risk on the last leg. |
| Incoterms and destination port | Determines what our logistics team arranges and what your agent handles. |
| Spare allowance | Site damage happens; most project buyers order a small extra quantity up front rather than chasing a top-up later. |
If you are working with an interior fit-out programme that also covers joinery, lighting and flooring, our turnkey project solutions cover coordination across those trades from one production plan, which removes the usual argument about whose delivery slipped.
How we handle custom and OEM requests
Where a project needs something beyond catalogue standard — a different surface treatment, a branded seat, private labelling, or quantities below the usual production run — send that request with the first enquiry rather than as an amendment. Our custom and OEM service covers prototyping, material and finish selection, and brand marking such as engraving or logos on packaging. Flexible order quantities are part of that service, but the practical limit depends on what is already scheduled in the factory, so we answer it with a real date rather than a promise.
For OEM work, include artwork files, the position where a mark should sit, and whether the marking must survive the glazing process. Those three details decide whether a change is a tooling adjustment or a new production route.
A short checklist before you send the enquiry
- Trap type and rough-in measurement for every bathroom group.
- Model reference, or a photograph plus dimensions if you are matching an existing installation.
- Quantity per model, split by delivery phase.
- Certification and documentation your consultant must approve.
- Packaging, Incoterms and destination.
- Any custom finish, branding or labelling requirement.
Send those six items and we can return a costed specification with the production and delivery plan attached, instead of another round of questions about your drainage. If you are specifying bathroom sanitary fixtures for a villa or hospitality project, share the fixture schedule and we will check it against what we can actually manufacture before anything is committed.