A curio cabinet is one of the few built-in pieces in a home that gets judged twice: once for how it stores, and again for how the collection inside reads under light. Because Santerson Curio Cabinets are made to measure — with the finish, layout and dimensions specified per project — almost every decision that affects the finished look has to be settled on paper before a single panel is cut. The installation plan is where those decisions get recorded.

Below is the checklist we work through with architects, builders and private clients on villa and residential projects, from the first site survey to handover.

Start With the Room, Not the Cabinet

Curio cabinets usually sit in a hallway, living room or study wall that was already designed for something else. Before sizing anything, confirm three site conditions:

  • Exact opening dimensions — height, width and depth at several points, not one. Older and renovated villas rarely have square, plumb walls, and a made-to-measure unit will inherit every deviation.
  • Wall construction and load path — timber framing, steel stud or masonry changes the fixing detail. Wall-hung units need to know where the structural members are; if the wall cannot carry the cabinet, the plan should say whether a concealed batten frame or a floor-standing base solves it.
  • Clearance and traffic line — door swings, radiator positions and walkway widths. A glass-fronted cabinet in a narrow corridor needs enough clearance for the doors to open without hitting someone passing by.

Record these as a marked-up drawing rather than a list of numbers in an email. Everyone downstream — the site builder, the electrician, our production team — works from the same sheet.

Decide What Is Going Inside Before Choosing the Layout

Shelf depth and spacing follow from the objects, not from a standard module. Porcelain, books, framed art, sculpture and glassware all need different treatments:

  • Tall pieces want a full-height bay with no mid-span shelf, so the eye can travel up the object.
  • Small collectibles read better on closely spaced shelves with a shallow depth, so nothing gets lost behind another piece.
  • Heavier items belong at lower levels, where the load goes straight into the carcass and the base.
  • Dust-sensitive pieces argue for glass; open shelving suits objects you intend to handle. Where both are wanted in one wall, pair the cabinet with Santerson Open Display Units so the closed and open bays share one module grid and one finish.

Fixing the contents early also settles whether adjustable shelving or fixed shelves are specified. Adjustable shelf pins give flexibility later; fully fixed shelving looks cleaner and holds its alignment better over years of use.

Specify the Glazing and Doors Properly

Glazing is where a display cabinet either disappears or dominates the room. In the plan, state:

  • Glass type and thickness, and whether the front is hinged or sliding — each needs different clearance in front of and beside the unit.
  • Reflection control: low-iron glass reduces the green cast that ordinary float glass puts over pale ceramics and textiles.
  • Handle detail. A recessed pull or push-open front keeps a slim sightline, but confirm the door weight and the hinge specification can carry it at the chosen width.
  • Security and child safety where the cabinet faces a stairwell or a household with young children — glass position, edge polish and fixing method all matter here.

For a run that mixes glazed and solid fronts, Glass Front Display Cabinets in the same carcass construction keeps the frame profiles, reveals and hardware identical across the elevation.

Treat Lighting as Part of the Cabinet, Not an Afterthought

A display cabinet without considered lighting is a dark box with shelves in it. The installation plan should carry a dedicated lighting layer, coordinated with the electrician:

  • Light source position — top shelf, vertical channel or shelf-edge fitting. Shelf-edge lighting shows depth and texture; top-down light pools on the upper bays and leaves the lower shelves dim.
  • Colour temperature and colour rendering, chosen against the room's existing scheme so the cabinet does not read as a different colour family at night.
  • Driver and transformer location, with an access point that is reachable after installation. A driver buried behind a fixed panel is a service call waiting to happen.
  • Switching and dimming — whether the cabinet runs on the room circuit, a separate switched leg or a sensor that activates when someone approaches.

Where lighting is integrated into joinery elsewhere in the same project, Santerson Integrated Cabinet Lighting lets the cabinet and adjacent built-ins share one wiring and control approach. Electrical specification, ratings and compatibility should be confirmed against each cabinet design before production.

Agree Finishes Against a Physical Sample

Curio cabinets almost never stand alone; they sit beside wardrobes, media walls or kitchen joinery by another trade. The plan should name the exact finish reference and record that a physical sample was approved on site, under both daylight and artificial light. Screen colour is not a substitute. Note the direction of any grain or veneer, the edge treatment on visible returns, and whether interior shelf surfaces match the exterior or take a contrasting tone.

Sequence the Site Works

The most expensive mistakes on built-in projects come from trades working in the wrong order. A workable sequence looks like this:

  • Site survey and dimensional sign-off, with any packing-out or lining of out-of-plumb walls done by the builder before final measurements are taken.
  • First-fix electrical: cable runs, driver position and switch positions set before the wall is closed.
  • Wall finishes complete — paint, plaster or stone cladding — to a defined floor-to-ceiling datum.
  • Cabinet delivery and installation, with floor protection laid and a clear route from the lift or entrance to the room.
  • Lighting commissioning, glazing clean, then snag inspection against the approved drawing.

Where the cabinet is one item in a wider built-in package — built-in furniture for several rooms, or joinery coordinated with Custom Built-in Kitchen Cabinets — install the largest and heaviest units first. It is far easier to scribe a small cabinet to a finished larger one than the other way round.

Put Site Access and Packaging in Writing

Made-to-measure cabinets are long, heavy and unforgiving of tight turns. Confirm before dispatch that the route to the room works: lift dimensions, stair landings, corridor widths, door leaves that can be removed, and whether a crane or hoist is needed for an upper floor. For international projects this also covers container loading, packaging specification and delivery dates that line up with the site programme rather than arriving months early into storage.

Close Out With a Snag List and Handover Pack

Handover should leave the client with something usable, not just clean glass. The pack we recommend includes the approved shop drawing with the as-built dimensions, the finish and material references used, the lighting specification with driver model numbers, spare shelf pins or hardware, and care instructions for the glazing and surfaces. Snags — a door out of alignment, a shelf that binds, an uneven reveal against a skirting — get listed with an owner and a date, then signed off.

Before you send the plan to production: every dimension on the drawing should be traceable to a site survey taken after wall linings are up; the lighting layer should be signed by the electrician as well as the designer; and the finish should be backed by an approved physical sample. Three confirmations, and most of the common rework disappears.

Can a curio cabinet be added to a room that is already decorated?

Yes, provided the wall can be surveyed accurately and any packing-out is done before final sizing. Expect a site visit for measurement and another for installation, and allow for making good around the reveals.

Should the cabinet be built on site or manufactured?

Factory-manufactured cabinets give consistent panel edges, controlled finish application and hardware set to specification — which matters most on glazed fronts, where small deviations show up as uneven reflections.

How far ahead of site completion should the cabinet be ordered?

Order against surveyed dimensions, not design-stage dimensions. The lead time matters less than measuring at the right moment: after wall finishes and floor levels are final, before fixed furnishings arrive.

If your project needs a display cabinet drawn to the space rather than fitted to a catalogue size, send us the drawings and the objects you intend to display. As a Custom Furniture Manufacturer, we specify carcass, glazing and lighting as one package, manufacture to the approved dimensions and coordinate delivery through to installation.