A media wall looks finished on the day it is installed, and starts to look unfinished once the rest of the room arrives — a sideboard from a different joinery package with a different veneer, a different edge detail, a door that closes slightly differently. Santerson Integrated Media Storage is part of the Integrated Storage Walls collection, which means it was never designed to be bought on its own. This guide walks through how we coordinate it with the other products in a fit-out — flooring, wall panelling, doors, lighting and loose furniture — so that one wall does not end up as three different details.
Start from the whole wall, not the TV position
The most common coordination failure is treating the media unit as a piece of furniture to be scheduled late. In practice it is a wall build-up: it has a substrate, a recess for the screen, cable routes, ventilation for equipment, and then a finish that has to match everything else on that plane. Before any dimension is fixed, we settle three things with the designer or builder — which wall the system sits on, how tall the built-in runs, and how far the finished floor level will rise once the engineered wood flooring and any screed are down. A made-to-measure unit specified against a structural slab instead of a finished floor level becomes an expensive problem on site.
Because the collection is configurable rather than standard-sized, the drawing set we work to is an elevation of the whole wall, with the media zone, the closed storage and the display areas drawn together. That single drawing is what lets flooring, panelling and lighting be quoted against the same lines.
Match the finish across product families
Integrated Media Storage can be specified with project-specific dimensions, materials and finishes, so the practical question is: match it to what? Our usual order of reference is:
- Flooring first. The floor sets the warmth and tone of the room. An oak or herringbone engineered flooring usually pulls a media wall towards a matte, natural-wood veneer; a darker charcoal floor works better with a lacquered or textured panel in a lighter tone.
- Panelling second. Where the media wall continues into a decorated surface, we coordinate the carcass doors with Santerson Textured Panels or Stone & Marble Panels, so the reveal between unit and wall is a shadow gap rather than a colour break.
- Doors third. A living-room wall with an opening in it should read as one surface. Santerson Decorative Concealed Doors let a passage through the wall disappear into the same panelling as the storage doors.
- Loose furniture last. Sofas, sideboards and rugs follow the fixed elements, never the other way round.
We keep one finish schedule for the whole apartment or villa rather than one per room. That is what makes a media wall in the living room and a wardrobe run down the corridor look like they came from the same factory — because they do.
Mix open and closed before you decide on size
A media wall that is entirely closed reads as a cupboard; one that is entirely open collects dust and shows every cable. The collection covers both ends, so the mix can be set per project:
- Santerson Mixed Open & Closed Storage for the everyday balance — shelving for books and objects, doors for the hardware, games and clutter.
- Santerson Open Display Niches where a lit recess is wanted, with the niche depth set to the objects actually being displayed rather than a default shelf depth.
- Santerson Full Height Storage Walls when the wall is doing real storage work in a hall, study or bedroom.
- Santerson Sliding Storage Panels where a screen needs to be concealed when the room is being used for something else.
Related systems from the Media & TV Walls collection sit in the same conversation. Santerson Integrated TV Panels handles the screen surface itself, and Santerson Full Height Media Walls covers a floor-to-ceiling composition. Where a client is deciding between an integrated wall and a piece of loose furniture, Floating TV Units give the lighter look without a full wall build-up.
Fix the services before the doors are made
The part of this that cannot be corrected later is behind the panel. Before production we confirm with the site team:
- the exact screen model, its mounting pattern and its depth, so the recess and any support batten are drawn to suit;
- where power, data and aerial points land, and whether they sit inside the media zone or behind a service void;
- how equipment is ventilated — closed cabinets trap heat, so equipment compartments need a route for air that does not spoil the front face;
- cable routes to any Santerson Integrated Cabinet Lighting or display niche lighting, including where the driver sits and how it stays reachable after installation;
- which shelves are adjustable and which are fixed, because a fixed shelf in front of a connector is a problem nobody notices until handover.
These details come back on the drawing for sign-off. It is not unusual for this to take two rounds; it takes far less time than a site modification.
Lighting is part of the wall, not an add-on
Integrated walls are usually lit in three layers: ambient light from the room, accent light inside niches and shelving, and a small amount of task light where the wall is also used as a desk or bar. Niche lighting has to be specified with the joinery because the rebate for the profile and the position of the diffuser are cut at production. For feature walls, Santerson Backlit Feature Walls follow the same principle — the light source is decided at panel design stage.
Where wall lighting is separate from the joinery, Santerson Wall Sconces and pendants should be set out against the finished elevation, not a bare wall, so a sconce does not end up centred on a panel joint.
One supplier across the fit-out makes the sequencing simpler
Coordination is easier when the same team produces more than one element of the wall. As a one-stop furniture and building materials supplier, SANTERSON manufactures built-in joinery alongside interior fixtures and building and construction materials — cabinetry, wardrobes, doors, wall panels, ceilings, flooring, ceramics, lighting, carpets and outdoor furniture. For a villa or apartment fit-out that means the media wall, the custom bedroom wardrobe, the kitchen cabinetry and the wall panelling are cut from the same batch of material and the same finish library, which is the only reliable way to get a colour match between rooms.
For projects that need something specific, our Custom & OEM Service covers bespoke sizes, materials and finishes, including veneers, laminates, metals and engineered stone. Where a designer has already specified another manufacturer's product, we work to that drawing rather than substituting.
How the fit-out actually proceeds on site
Our project workflow runs through six stages: consultation, design and planning, production, logistics, installation and after-sales. For a media wall inside a larger fit-out that plays out like this:
- Brief and survey. Drawings, photographs and finished floor levels; the screen and equipment list if known.
- Elevation and finish schedule. Layout, open-to-closed ratio, materials, hardware and lighting set-out, issued for sign-off.
- Production. Made to the signed drawing, with finishes sampled where a colour match across products matters.
- Logistics. Freight by sea, air or rail with the packaging and documentation handled centrally, so joinery, flooring and lighting arrive on a schedule that works for the site programme.
- Installation and snagging. Fitting to the prepared wall, then inspection with the site team before handover.
- After-sales. Spare parts, replacement components and maintenance support for doors, hinges and profiles.
The practical advantage of this sequence is that the media wall arrives when the wall behind it is ready, rather than sitting in a corridor while the floor is still being laid.
A short checklist before you order
- Finished floor level confirmed, not structural slab.
- Screen model and mounting depth confirmed.
- Power, data and aerial positions marked on the signed elevation.
- Ventilation route for equipment compartments agreed.
- Finish matched against flooring, panelling and doors from one schedule.
- Lighting profiles, drivers and access points shown on the drawing.
- Adjacent products — wardrobes, sideboards, concealed doors — ordered against the same elevation.
If you are coordinating a media wall alongside other elements of a villa, apartment or hospitality fit-out, send us the drawings and the finish direction and we will price the whole wall as one package. Talk to our project team about your layout.