A wardrobe quote that looks complete at first glance can still leave the price open to change. With frosted glass and aluminium frame wardrobes, most of those changes come from details buyers rarely see spelled out: what size was priced, which glass and which frame finish, how the doors are specified, and what is included before the units reach site. Here is a practical checklist for reading that quote properly before you sign it.

1. Confirm the Quote Is Priced on Your Actual Openings

Frosted glass aluminium frame wardrobes are made to measure, so the first question is not price but dimension. A quote built from a standard module and a quote built from your finished room dimensions will never match, and the gap only appears once the units arrive on site.

Before accepting any figure, check that the quote lists:

  • Width, height and depth for every unit, stated as finished overall size rather than a nominal module width;
  • The floor and ceiling finish level the heights assume - screed, tiles or plasterboard thickness changes the final drop;
  • Whether scribes, filler panels, cornices and any top closure to the ceiling are priced in or treated as extras;
  • How awkward corners, sloping ceilings, beams, radiators and skirting returns are handled.

Ask for a dimensioned elevation drawing for each wall. If the supplier cannot produce one, treat the number as an estimate rather than a firm price. On our residential wardrobe work, layout, finish and dimensions are specified per project, and dimensions and selected specifications are confirmed for each project before production starts.

2. Read the Glass Specification Precisely

"Frosted glass" covers several different products at quite different prices. The line item on your quote should say what the glass actually is, because that drives cost, safety behaviour and how the interior reads once the doors are closed.

Frosted / satin surfaceLacquered or film-backed frosted panels sit fully opaque and hide the interior completely. Back-painted or film-faced options are usually the more economical route; a genuinely acid-etched or sandblasted surface costs more and behaves differently around fingerprints and cleaning.
Safety make-upCheck whether the price is for tempered glass, laminated glass or tempered-and-laminated. Tempering alone does not hold the pane together if it breaks, which matters on tall doors and in family bathrooms and bedrooms.
ThicknessThe stated thickness must match what the frame profile and hinges are rated for. A thicker pane may also change door weight and therefore the hinge and runner specification.
Edge and cut-outsPolished edges, cut-outs for handles or integrated pull channels, and any printed or decorative pattern should appear as line items. "As per sample" is not a specification you can claim against later.
Transparency expectationIf you want contents hidden but light still passing through, say so in writing. Frosted levels vary between suppliers, and a sample board settles the argument faster than a photograph.

Where the same design is being run across several rooms, confirm that every pane in the batch comes from one production run. Frosted and back-painted glass can show visible tone differences between separate batches.

3. Pin Down the Frame, Not Just the Colour Name

Aluminium frame cost is set by profile section, wall thickness and surface treatment - not by the colour swatch name in the catalogue. Two quotes can both read "black" and differ materially.

  • ✓ Profile type and sightline: slim square, rounded, or a wider shadow-gap frame; this changes both price and appearance.
  • ✓ Surface treatment: powder coating, anodising or wood-effect transfer. Ask which process is quoted, since durability and feel differ.
  • ✓ Frame colour reference: quote a RAL number, anodised code or a physical sample number rather than a trade name.
  • ✓ Corner construction and joint finish on visible elevations.
  • ✓ Whether the frame is structural (the door carries itself) or a decorative trim over a panel door - these are different products at different prices.

The same detail matters when the frames continue elsewhere in the build. A clear glass aluminium frame wardrobe and a frosted one share the frame spec but not the glass line, so if you are mixing transparent and opaque doors across a run, make sure both lines quote the identical profile and finish. Our wider frosted glass aluminium frame wardrobe range is offered with material and finish options specified to suit each space, so the finish you approve on the sample should be the finish written into the order.

4. Check What the Doors Are Actually Made Of

On a mixed design - glass fronts here, solid fronts there - the door make-up is where quotes quietly diverge. Ask for each door type to be listed separately.

  • Glass doors: pane thickness, safety make-up, frame section, and whether handles are integrated or surface-mounted.
  • Solid panel doors: substrate, surface (lacquer, veneer, melamine, acrylic) and edge treatment on both faces.
  • Sliding systems: track type, wheel set rating, floor guide, and the maximum door size and weight the quoted hardware carries.
  • Hinged systems: hinge brand and load class, soft-close option, and the number of hinges priced per door height.

Hardware is the usual source of a variation order. A quote that says "hinges and runners included" without naming grade or load rating has not actually committed to anything. For walk-in layouts in particular, get each configuration priced separately - an open glass walk-in wardrobe and a closed hinged run are different assemblies with different hardware loads.

5. Verify the Interior Layout Before It Is Fixed

The carcass is visible; the interior is what you live with. A quote that prices "interior as drawing" without a drawing gives you nothing to check.

  • Shelf, hanging rail and drawer positions in elevation, with heights matched to who will use the space.
  • Panels used for the interior - melamine, lacquered board or matching the exterior finish all price differently.
  • Drawer count and type: box side height, soft close, and whether organisers are included or optional.
  • Integrated lighting: fitting type, driver location, switching or sensor, and where the cable is routed.
  • Anything load-bearing that needs reinforcement - a TV, a mirror, a heavy rail run.

If you are also specifying cabinetry in the same package, keep the finish language consistent across both quotes. A frosted glass aluminium frame cabinet in the kitchen and matching frosted doors in the bedrooms should be quoted with the same profile, glass make-up and finish reference, or you will get two visually different products from one supplier.

6. Test the Supplier's Custom Capability, Not Just Their Price

Made-to-measure work only pays off if the supplier can actually execute to your drawing. Ask what sits behind the quotation: whether they offer custom furniture design and prototyping, 3D modelling before production, bespoke finishes and textures, and OEM manufacturing where you are buying under your own brand for a development. Flexible minimum order quantities matter on multi-unit residential work, where one room's layout may need repeating twelve times but not more.

Useful questions to put in writing:

  • Who produces the production drawings - you or them - and who signs off on them?
  • Is a sample door, corner section or finish board available before the batch is released?
  • What tolerance do they work to on finished size, and how are out-of-square walls absorbed on site?
  • Which materials and finishes are outside their standard range, and what does that cost?

7. Read the Commercial Terms as Carefully as the Spec

The specification and the terms have to agree with each other. Cross-check these points on every quote you receive:

Scope boundaryDesign, production, packing, freight, customs clearance, delivery to door or to kerb, installation, and after-sales support - mark which of these each quote covers. Door-to-door logistics with customs paperwork handled is not the same as a port delivery.
Pricing basisCurrency, Incoterms, validity period, and what triggers a re-quote (dimension change, finish change, quantity change).
Payment stagesDeposit, milestone before production, balance before shipment. Tie the second payment to your written approval of shop drawings.
PackagingGlazed units need crated, edge-protected packing for freight. Ask how glass is separated, blocked and marked against the drawing numbers.
Damage and sparesHow breakages in transit are documented, and how quickly a replacement pane or door can be remade - this is the single biggest schedule risk on glazed joinery.
Warranty wordingWhat is covered (glass, coating, hardware, structure) and for how long, and what voids it.

8. The Pre-Order Sign-Off List

Before you return the signed order, confirm that all of these are in the file:

  • ✓ Dimensioned elevations for every unit, matching your finished floor and ceiling levels.
  • ✓ Glass specified by make-up, thickness, frost level, edge treatment and safety type - with an approved sample reference.
  • ✓ Frame profile, section and surface treatment named by code, not just colour name.
  • ✓ Hardware named by grade and load rating, matched to door size and weight.
  • ✓ Interior layout drawing approved, including lighting and its switching.
  • ✓ Scope boundary written out: design, production, packing, freight, clearance, delivery, installation, after-sales.
  • ✓ Payment stages linked to drawing approval and shipment.
  • ✓ Breakage, remake and spares procedure agreed in writing.
A simple rule: if a line in the quote cannot be pointed at on a drawing or matched to a physical sample, it is not yet specified. Get it specified before you sign, because every unspecified item becomes a variation order later - and variation orders on made-to-measure joinery arrive with both a price and a delay attached.
SANTERSON supplies made-to-measure built-in furniture, including frosted glass aluminium frame wardrobes, alongside cabinetry, lighting and interior fixtures for residential and project work. Send us your room dimensions, elevations and the finish you want to match, and we will quote the specification rather than a generic module - layout, materials and finishes confirmed with you before production begins. Contact our team to start a quotation.