A wardrobes submittal is the document package a buyer, designer or contractor reviews before approving production. For Ribbed Glass Wardrobes, the submittal carries extra weight: ribbed (fluted) glass changes how light passes through the door, and made-to-measure cabinetry leaves no room for guesswork on site. A complete package lets everyone sign off on the same drawing, the same finish and the same opening before a single panel is cut.
Below is what we ask our project clients to check in every wardrobe submittal we prepare, and what you should expect to see returned when you request one from a supplier.
1. Dimensioned drawings, not a sales sketch
The core of the submittal is a set of dimensioned elevations for each wardrobe run. These should show overall width, height and depth; the vertical division of doors; drawer and shelf positions; and hanging-rail heights. Because our glass-door wardrobes are made to measure, the drawings must also record floor-to-ceiling variation and any obstruction the site team has to work around: skirting, cornices, air-conditioning lines, light switches, door swings and uneven walls.
Check that the dimensions on the drawing match the survey you supplied, not the nominal size from a catalogue. Where a run is interrupted by a corner or a niche, ask for a separate detail of that junction rather than accepting a single stretched elevation.
2. Glass specification and how it behaves in the room
Ribbed glass is specified for the way its vertical ridges diffuse light and soften what sits behind the door, which is why it works well in bedrooms, dressing rooms and compact suites where a fully clear door would make the storage read as clutter. The submittal should state the glass type selected for the project, the direction of the ribbing on each elevation, and how the glazing is set into the door. It should also record which other finishes from the same collection were considered — Frosted Glass Wardrobes and Clear Glass Wardrobes are the two most common alternatives on the same door construction — so the comparison is documented rather than argued later.
Ask for a physical sample of the glass against a sample of the carcass finish. Ribbing reads differently under warm bedroom lighting than under cool corridor lighting, and a photograph will not settle that question.
3. Carcass, door construction and finish schedule
The finish schedule should name the board material, the surface finish, the edge treatment and the hardware for every visible line — doors, drawer fronts, interior boxes, shelves and any open display niches. For a glass door, record the frame material and colour as well as the infill, because the frame is what defines the shadow line against the wall.
Interior layout belongs in this section too. If the project needs deep hanging for long garments, pull-out trays, or a dressing-room configuration, the submittal should show it as an interior elevation with dimensions, so the buyer can confirm storage capacity before approval rather than after installation.
4. Manufacturing and tolerances
A useful submittal states how the unit will be built and delivered: panel thickness, assembly method, whether the wardrobe arrives as assembled boxes or flat packs, and the tolerance band the manufacturer is working to on site dimensions. For made-to-measure work this is where a supplier confirms which measurements are fixed by the site condition and which can still be adjusted at installation — a point that regularly saves time when floors are not level.
5. Installation sequence and site prerequisites
Glass-front wardrobes need a prepared opening. The submittal should list what the site must complete before the wardrobes go in: leveling, wall finishes, flooring, electrical points for any interior lighting, and clear access for delivery. It should also show the installation sequence — carcass first, then glass doors hung and adjusted — and identify who is responsible for each step.
6. Packaging, shipping and handling
For cross-border projects, the package should describe how glazed doors are protected and packed, how the consignment is consolidated with other joinery, and what the receiving team should inspect on arrival. Glazed components are the items most likely to show transit damage, so a clear inspection note in the submittal prevents disputes at the dock.
7. Approval sheet and revision record
Close the submittal with a signature block: who prepared it, who reviewed it on the project side, the date, and a revision number tied to the drawing set. Every change after approval — a moved drawer bank, a different glass, an added door — should appear as a new revision, not as a verbal instruction to the factory.
What we return with a wardrobe submittal
SANTERSON manufactures built-in furniture including the glass-door wardrobe range as made-to-measure work, so our submittals are prepared from your survey and layout rather than from a standard size. We supply dimensioned elevations, finish and hardware schedules, interior layout drawings, packing information and door-to-door delivery documentation, with installation support at handover. Where a project needs a different storage configuration in the same glass — for example a Custom Minimalist Bedroom Wardrobe beside a ribbed-glass run — we draw both on one sheet so the finishes are confirmed together.
Send us your drawings, room photographs and target finish, and we will return a submittal package for review before production starts. Final dimensions, glass type and selected specifications are confirmed project by project.