A wardrobe quotation that looks complete on paper can still leave a project exposed. Two suppliers quoting the same wall of guest-room storage can differ on frame profile, glass type, hardware brand and the point at which measurements are taken — and those differences only surface after the deposit is paid. When your project includes aluminium frame glass wardrobes, the proposal review stage is where you control cost, schedule and the finished look. The checklist below follows the order in which a commercial buyer actually reads a quotation: scope first, then specification, then hardware, then the conditions around manufacture and handover.

Start with what the proposal is supposed to cover

Before comparing prices, confirm that every quotation answers the same scope question. In a hotel, serviced apartment or multi-unit residential development, built-in storage touches several trades: the wall finish, the skirting and cornice lines, ceiling height variation, sockets behind the carcass, and the door opening path in a narrow corridor. A proposal that prices only a wardrobe box and two doors is not comparable to one that includes scribing to out-of-plumb walls, a top panel to close the gap to a suspended ceiling, and protection during on-site installation.

Ask each supplier to state in writing what is included and what is excluded. The exclusions matter more than the inclusions, because they become variations later.

Read the specification line by line

Glass-front aluminium wardrobes are specified by four things: the frame, the glass, the carcass and the interior. A serious proposal names all four rather than describing them as "standard".

  • Frame. Aluminium profile wall thickness and finish (anodised, powder-coated or brushed), plus how the frame meets at the corner — mitred joint or inserted corner piece. Frame colour should be quoted against a named finish reference, not a photograph.
  • Glass. Clear, bronze, grey/smoked or frosted; thickness; and whether the rear face is safety-backed or laminated for use in guest rooms and circulation areas. Glass tone is one of the most common causes of a finished-room mismatch, so confirm the exact reference before production.
  • Carcass. Board type and thickness, edge treatment on all visible edges, and the finish on the interior face — not only the door you see in the rendering.
  • Interior. Shelf spans and whether shelves are reinforced over the span you need, hanging rail positions and heights, drawer count and runner type, plus optional lighting and mirror panels quoted as separate line items so they can be added or dropped without reopening the whole price.

The same approach applies across our glass-door wardrobe range: the bronze glass, clear glass and frosted glass aluminium frame options are each specified with their own glass reference and frame finish, so two rooms quoted side by side are compared like with like.

Check how the proposal handles made-to-measure work

Commercial units are rarely identical. Slab-to-slab heights vary, corridors change width at structural columns, and a mirrored recess on one floor is a plain wall on the next. A proposal for project storage should describe who takes the final dimensions, when they are taken, and what happens if the site differs from the drawing.

Practical test: ask the supplier which dimension governs — the architectural drawing or the site survey. If the answer is the drawing, budget for a site re-measure before units ship. If the answer is a site survey, confirm at what construction stage it happens and who signs it off.

Our Aluminum Frame Glass Wardrobes are made to measure, with material and finish options and a layout tailored to the project; dimensions and selected specifications are confirmed for each project before production. That confirmation step — which should appear in any quotation you review — is worth more than a marketing claim, because it defines the point of no return.

Do not let hardware stay generic

Glass doors are heavy. Sliding systems carry that weight on wheels and tracks through years of guest use, and hinged glass doors put every cycle through the hinge. Generic wording such as "premium hardware" tells you nothing. Ask for:

  • Hinge and runner make and model, with a load rating appropriate to the door size quoted.
  • Track type and how the lower track is cleaned in a dusty site condition.
  • Soft-close or damper details on sliding and hinged doors, quoted as an option so you can decide room by room.
  • Spare-parts availability: which components are stocked, and how replacements are shipped during the defects period.

If a supplier cannot name its hardware, assume the cheapest component that fits the drawing until proven otherwise.

Compare commercial terms as carefully as the product

Item to confirmWhy it changes the real cost
Packaging and container loading planGlass panels and pre-assembled carcasses pack differently. The loading plan drives breakage risk and how many units fit a container.
Freight mode and delivery pointSea, air and rail change both cost and the sequence of site delivery. Confirm whether delivery reaches the building or only the port.
Payment milestones tied to drawings approvalDeposits taken before drawings are signed leave you paying for a specification that was never approved.
Inspection point before shipmentA pre-shipment inspection with photographs of frame finish and glass tone is far cheaper than correcting it after installation.
Defects period and spare partsGlass, runners and hinges are service items. Written terms decide whether a fault becomes a warranty claim or a new purchase order.

Where one supplier handles design coordination, production, freight and installation support under turnkey project delivery, the handover boundaries between those stages should be written down. Otherwise "we deliver door to door" and "you install" can both be true at once.

Score the proposal, do not just read it

Buyers comparing three quotations often end up choosing the middle one simply because it is the only one that answered everything. A simple scoring sheet makes that visible before negotiation starts:

  • Scope and exclusions stated in writing — yes / no
  • Frame, glass, carcass and interior each named with a finish reference — yes / no
  • Site measurement stage defined and signed off — yes / no
  • Hardware make, model and load rating listed — yes / no
  • Drawings approval milestone before payment — yes / no
  • Pre-shipment inspection with photographs — yes / no
  • Delivery point and installation responsibility separated — yes / no
  • Warranty terms and spare-parts supply stated — yes / no

A proposal that scores well on these eight points can be compared honestly on price. One that does not should be re-quoted, not negotiated.

Send one brief, get comparable answers

The fastest way to make quotations comparable is to issue the same information to every supplier: room-by-room elevations, floor-to-ceiling heights at the installation point, the glass and frame finish you want referenced by name, the interior configuration per unit type, and the delivery point. Suppliers quote the brief they receive; an incomplete brief guarantees incomparable answers.

If you are sourcing built-in storage alongside other fit-out items, sending that same brief to a one-stop furniture and building materials supplier also shows you how wardrobe frames coordinate with the rest of the built-in storage, wall panelling, doors and lighting specified for the project — which is where finish matching usually fails when each item is bought separately.

Frequently asked questions

Which is easier to specify for a guest room, sliding or hinged glass doors?

Hinged doors need clear swing space in front of the opening, so they suit wider rooms. Sliding doors save that space but place more demand on the track and runner specification, and require access to the lower track for cleaning. Decide by room geometry first, then compare hardware on that basis.

Should glass tone be approved from a physical sample?

Yes. Bronze and smoked tints read differently against warm and cool lighting and against different wall finishes. A named reference plus a physical sample held against the actual room finish removes the most common cause of dispute at handover.

When should final dimensions be taken?

After the floor, wall and ceiling finishes that the unit meets are complete. Measuring to a structural drawing rather than the finished envelope is where gaps, binding doors and visible shadow lines come from.