A mirrored hinged wardrobe looks simple on a drawing: two doors, a mirror each, hinges top and bottom. In production it is one of the more detail-sensitive items in a bedroom fit-out, because glass, hinge hardware, carcass depth and door alignment all have to agree before the panels are cut. That is why an enquiry that arrives with a vague note - "3m wardrobe with mirrors" - usually comes back with questions, while a properly briefed enquiry moves straight into quotation and sampling.

The list below is what we need from architects, builders, interior designers and project buyers so a mirrored hinged wardrobe can be engineered, priced and shipped without rework.

1. The opening dimensions, not just the width

Send the wall-to-wall width, but also the depth and the height at several points along the run. Existing rooms are rarely square, and a hinged wardrobe specified to a nominal floor-to-ceiling height will fight with a ceiling that dips by a few centimetres across the room.

  • Finished width, height and depth at the point of installation, measured after flooring, plasterboard, skirting and cornices are in place.
  • Where the floor finish sits relative to the subfloor, so we know whether a plinth or a scribed base is needed.
  • Obstructions: downlights and bulkheads above, door openings, skirting depth, switches, air grilles and any pillar in the run.
  • Whether the unit butts into another built-in, such as bedroom cabinetry or kitchen joinery, and which side carries the finished return.

Our hinged-door wardrobe carcasses are made to measure, so an out-of-square opening is not a problem as long as we know about it before fabrication. What we cannot do is guess it afterwards.

2. Door layout and the swing arc

Hinged doors need clear air to open. Tell us how many doors you want across the width, which door is hinged on which side, and what sits in front of the wardrobe - a bed, an island, a custom minimalist bedroom wardrobe opposite, or a doorway. A 500 mm door needs its full projection plus clearance for anyone standing in front of it.

  • Number of doors and preferred hinge side for each.
  • Clearance available in front of the run, in millimetres, at the closest obstruction.
  • Whether full-height doors, or an upper section with separate cupboard doors, suits the ceiling condition.
  • If the swing cannot be cleared, we will say so and propose sliding or mirror sliding door wardrobes instead. Better to settle that on paper than on site.

3. The mirror: where it sits and how it is finished

This is the part most briefs leave blank, and it drives cost and handling more than anything else in the item. Mirror also adds weight per door, and that weight drives hinge selection.

DecisionWhat to specify
PositionMirror on the door face, mirror inset within a framed panel, or a full-height mirror panel. A mirror applied to a flat panel hinged wardrobe door behaves differently from a mirror set into a framed or paneled door.
Edge treatmentPolished, bevelled or framed edge; whether an anti-tarnish backing and a safety backing film are required.
Mirror typeClear, bronze, grey or tinted. Tint changes how the room reads and should be confirmed against a sample, not a screen.
IntegrationWhether lighting is wired near the mirror face, and if so where the driver and switch are allowed to sit.

Glazing also changes how the unit travels. A door packed with the mirror loose in a flat pack is a different crate from a door with the mirror pre-applied. We will tell you which option we recommend for your freight method, but only if the brief states whether on-site glazing is acceptable or factory-applied glass is required.

4. Hinges, handles and the load they carry

  • Hinge type and brand if your project has an approved schedule: concealed, cup or surface-mounted, with soft close or without.
  • Handle strategy: profile pull, integrated recess, knob, or a handleless push-open front. Handleless fronts need a specified door gap and clearance for the mechanism.
  • Door height and mirror area per door, so hinge count and load rating are calculated rather than copied from a standard wardrobe.
  • Cycle expectations. A private villa bedroom and a serviced-apartment wardrobe are specified differently, and hardware grade should follow that use; the same applies to hospitality project bedrooms.

If you have an existing hardware schedule, send it. We match to it where we can and flag the items we cannot, before production starts rather than after.

5. Internal layout by habit, not by default

Send a room-by-room layout instead of accepting one standard interior for the whole order. Hanging zones for long garments, double hanging for short garments, drawer banks, shelf runs, shoe storage, interior cavity lighting and space for a safe or a laundry basket are all decided at the drawing stage.

  • Mark heights for each hanging rail and shelf on the elevation.
  • State which carcass material and interior finish are required, especially where interiors are exposed when the doors stand open in a hotel or walk-in setting.
  • Confirm load-bearing shelf spans, so shelf thickness and support method are engineered for what will sit on them.

6. Finish, sample and sign-off route

Mirror is easy to specify in words and hard to agree in person, so put the sample stage in the programme.

Tell us the carcass board, the door substrate and the finish family you want - lacquer, veneer, laminate or a matte matte acrylic wardrobe front - and where the piece will be used. For a two-tone elevation, say which element carries which finish; our two tone hinged wardrobes are built to the split you specify rather than to a fixed combination.

  • Send the drawing package: elevations, plan, sections and the joinery schedule.
  • Name the reference samples you want posted, including a mirror sample in the chosen tint at real size.
  • State who signs off - architect, builder or client - and how long sign-off usually takes on your project.

Our custom furniture design and prototyping service covers bespoke dimensions, material and finish selection and prototype review before the production run is released.

7. Delivery, packing and who installs

  • Ship-to address, access conditions and whether glazed elements can travel pre-fitted.
  • Preferred mode - sea, air or rail - and the Incoterms you intend to trade on. We arrange furniture logistics and door-to-door delivery, including freight forwarding, customs paperwork and container loading.
  • Who installs: our team under installation and after-sales support, or your own joiner. If it is your joiner, we send setting-out drawings, fixing details and a parts schedule sized for spares.
  • Phasing across units, so wardrobes arrive in the sequence the rooms are ready rather than all at once into storage.

A short brief template that works

ItemYour answer
Opening size and out-of-square toleranceW x H x D measured on site, after finishes
Doors: count, hinge side, swing clearanceNumber per unit, mm of clear space in front
Mirror position, tint, edge, backingFace-applied or inset; clear/bronze/grey
Hinges and handlesApproved schedule or preferred grade
Interior layoutRails, shelves, drawers with heights marked
Finish and samples requiredBoard, door substrate, finish family
Quantity, unit mix, phasingUnits per type, delivery sequence
Destination, mode, Incoterms, installerAddress and responsibility split

Two things we ask you not to leave to us: the exact mirror specification and the finished floor levels. Both are cheap to settle on paper and expensive to change after panels are cut.

Send your drawings, quantities and site dimensions to SANTERSON, a China-based furniture and building materials manufacturer working on villa, hotel and office projects, and we will return a buildable specification with the options that need your decision before production.