A flush wall aligned door is one of the hardest items to get right on a residential or hospitality fit-out, because the finished result depends on details that are fixed long before the door leaf arrives on site: opening dimensions, frame build, swing direction, finish and how the surrounding wall is closed back to the lining. OEM sourcing puts all of those decisions with the manufacturer that builds the door, so the joinery, the finish and the wall line are treated as one package rather than three separate purchases. Here is how that process runs, stage by stage.

What “OEM” means for this product

In original equipment manufacturing you supply your drawing, sample or specification, and the factory produces to it under your brand or your project reference. For doors that sit flush with the wall surface, this matters more than for a standard off-the-shelf leaf. Our handleless concealed doors and decorative concealed doors are built to the same principle: made-to-measure sizing, a material and finish selection per project, and a layout tailored to the space. Nothing is cut to a stock module and hoped to fit.

SANTERSON has been manufacturing furniture and building materials in China since 2008, and our Custom & OEM Service covers bespoke design and prototyping, custom material finishes and textures, OEM production, flexible minimum order quantities and brand customisation. That is the same capability behind our wider door range, including flush interior doors, flush hinged doors and flush sliding doors.

Stage 1: brief, opening schedule and reference detail

The starting point is not a product enquiry, it is an opening schedule. For each door position we need the finished opening size, the wall build-up and lining depth, the intended swing or slide direction, and whether the leaf should read as a plain flush panel, a handleless reveal or a decorative matched surface. Interior drawings, elevations and a mood or finish board are enough for us to start; our design team works in space planning, concept development and 3D visual renderings, so we can show you how the door line sits against the panelled wall it will disappear into.

This is also where we flag coordination issues that are expensive to fix later. A flush aligned leaf only works if the architrave-free junction, the skirting break and any adjacent integrated door and paneling work share one set of levels. When the doors and the wall panelling come from one manufacturer, that junction is resolved in the factory drawings instead of on site with a tradesman guessing.

Stage 2: engineering drawings and sign-off

We return shop drawings showing leaf size, frame section, hinge position and pocket or reveal detail, together with the finish build-up. Every dimension on those drawings is confirmed by you before cutting starts. This confirmation step is not a formality: our product pages state made-to-measure sizing and material and finish options as configurable items, and they ask that dimensions and selected specifications be confirmed for each project. Once the drawing is signed, the door is built to it.

Stage 3: materials, finishes and prototyping

Material selection is where OEM sourcing pays for itself. We work with wood, metals, engineered stone and laminates, and we can match a door face to the veneer, lacquer or laminate used on the cabinetry and panelling in the same room — useful when the goal is a wall that reads as one continuous surface. Finishes can be engraved, embossed or branded where your project requires it. For a batch of villas or hotel rooms, we produce a first article for approval so colour, grain direction and reveal depth are agreed before the run is repeated.

Stage 4: production and quality control

Production runs in our own facilities with project-level quality checks on size, squareness, finish and hardware prep. Because we also supply the surrounding finishes — wall panelling, built-in joinery, flooring and lighting from the same catalogue — one project manager tracks the door schedule against the rest of the fit-out, which keeps the trades on site from waiting on mismatched components.

Stage 5: packing, freight and delivery to site

Doors are packed for long-haul handling, with frames, leaves and ironmongery grouped by opening so the installer works through the schedule in order. Our Logistics & Door-to-Door Delivery service covers sea, air and rail freight forwarding, commercial invoices, packing lists, certificates of origin and other customs paperwork, container loading plans and shipment tracking through to the site address. Freight terms, duties and transit times are confirmed per project rather than quoted as a blanket promise.

Stage 6: installation support and after-sales

A flush aligned door is judged on the joint, so we stay involved through fitting. Our Installation & After-sales Support covers on-site installation guidance, inspection and snag lists, warranty coverage, spare parts and ongoing maintenance. Site guidance can be arranged during the fitting window so hinges, alignment and the wall closure are checked against the approved drawings.

What to send us to get a quotation

  • Opening schedule: one line per door, with finished opening width, height and lining depth.
  • Elevations or interior drawings showing the wall the door must disappear into.
  • Door type: hinged, sliding, handleless concealed or decorative concealed.
  • Finish reference — sample number, laminate or veneer name, or a physical sample sent to our Foshan office.
  • Quantities per unit type and the project delivery location.

Send those five items and we can price the doors properly, with the drawing set that follows. If your project also needs joinery, wall panelling or other finishes from one supplier, tell us at the same time so the schedules are coordinated from the first drawing rather than reconciled on site.

Talk to our project team about OEM production for flush wall aligned doors — email santerson@qq.com or contact us through our contact page.