A double basin countertop is one of those bathroom items that looks simple on a schedule and turns complicated the moment somebody asks for a price. Two basins, one slab, one vanity carcass underneath — and three separate trades waiting on the dimensions. If your enquiry comes through with only a room photo and the words "double vanity, roughly 1500 mm", the quotation you get back will be a guess, and guesses are what cause variation orders later.
Our Santerson Double Basin Countertop is made to measure for each project, which means the specification you send genuinely changes what we build and what it costs. Here is exactly what we need from an architect, builder or procurement lead to price one properly, and why each item matters.
Before the countertop: which assembly are you actually buying?
The first thing we clarify is not a dimension. It is scope. In our bathroom range, several related products cover what buyers often describe with one phrase, and they are quoted differently:
- A double basin countertop — the worktop plus the basins set into or on it, supplied as a matched set.
- A Santerson Double Vanity — the full vanity unit, carcass and drawers included, with countertop and basins specified onto it.
- An Integrated Countertop Vanity, where the basin forms part of the counter rather than sitting in a cut-out or on top of it.
- A bare stone or marble surface supplied on its own, with basins ordered separately against confirmed cut-out drawings.
Tell us which of these the drawing shows — or send the drawing and we will tell you. Getting this wrong is the single most common cause of a quotation that looks cheap at tender stage and expensive after the first site meeting.
The dimensions we need, stated the way a fabricator reads them
"1500 mm wide" is not enough. For a two-basin counter we work from a set of measurements, and one of them is missing in most first-pass enquiries:
| Measurement | Why it changes the price or the build |
|---|---|
| Overall width and depth, plus thickness of the counter edge | Sets slab usage and whether a mitred, bullnose or square edge is being cut. Edge profile is a finishing decision, not a default. |
| Basin spacing — centre-to-centre between the two basins | Determines whether two adults can actually use the counter at the same time, and whether taps land on solid material rather than on a cut-out. |
| Set-back from each side wall to the nearest basin centre | A 1500 mm counter with basins pushed to the ends behaves completely differently in a narrow bathroom from one with basins centred. |
| Cut-out position and size, or basin rim dimensions for an above-counter bowl | An undermount basin has to be cut to its own template; a vessel bowl needs counter depth in front of it so splash does not run off the edge. |
| Tap hole positions and tap reach | Holes are cut into the slab. Once they are cut, they cannot be moved without a patch that shows. |
| Waste outlet position and trap type | Determines what sits inside the carcass below and whether the drawer layout has to route around the plumbing. |
| Floor-to-counter height, if the counter is fixed to a wall | Affects how the splashback and any mirror or vanity lighting above are set out. |
If you can send a dimensioned elevation and a reflected ceiling or plumbing layout alongside those numbers, we can usually come back with a workable specification rather than a list of questions. Where the site is already partly built, a set of site-verified dimensions beats drawing dimensions every time — tiled walls rarely sit exactly where the plan says they do.
Basin type: same counter footprint, four different fabrications
The way the basins meet the counter changes the fabrication more than most buyers expect. Our Countertops & Basins range covers each of these, and they can be mixed with the surface material you choose:
| Basin style | What we need confirmed before quoting |
|---|---|
| Undermount | The basin template — cut-out size, corner radius and the lip width left between cut-out and counter edge. |
| Vessel / above-counter | Bowl height and footprint, plus tap type, because a tall bowl needs a taller or wall-mounted tap to be usable. |
| Integrated basin | Basin depth and the fall to the waste, since the basin is formed as part of the counter rather than dropped into it. |
| Ceramic basins supplied separately | Rim dimensions and mounting detail, so we cut to the basin you have already specified elsewhere. |
For guidance on any of these, our pages for the Santerson Undermount Basin, the Santerson Vessel Basin (Above Counter) and the Integrated Basin each list what to confirm for that configuration. Materials, finishes and dimensions are specified per project on all of them — we would rather confirm the final build with you than assume it.
Surface material and finish, stated by name
"Marble look" is not a specification. Send us the material family you want — natural stone, marble, engineered stone, ceramic — along with the finish on the top surface and on the visible edges, and the veining direction if you have selected a specific slab pattern. In a double counter the joint between two pieces, or the way a vein runs across two basins, is the detail a client notices first.
Where the same stone continues elsewhere in the project — a wall panel, a feature surface, a kitchen worktop — say so in the enquiry. Matching batches and consistent veining across several areas is something we plan at production stage, not something that can be fixed afterwards.
What sits around the counter, because it decides how it installs
A double basin countertop rarely arrives on site as an isolated item. Two questions settle most of the coordination:
- Is it going onto a vanity carcass we are also making? If so, send the drawer and door layout you want. A double counter with two traps underneath needs a carcass that leaves room for both waste runs, and our double vanity and floating vanity configurations are set out around that.
- Is it going onto site-built joinery or a steel frame? Then we need the bearing detail — where the counter is supported along its span, especially between the two basins, and how the front edge meets any return.
Send us the tapware and waste model too, if it has been specified. Tap reach, pop-up waste type and overflow detail all affect hole size and position, and matching them to a counter we are already making is cheaper than re-cutting one.
How this fits a larger project order
Most of the bathroom counters we produce are part of a wider fit-out rather than a stand-alone purchase. If you are furnishing several bathrooms, a villa or a hospitality building, it is usually more efficient to send the whole sanitary and joinery schedule in one enquiry. We work as a furniture and building materials supplier across ceramics, vanities, lighting, cabinetry, wall and ceiling finishes and flooring, so basins, counters, mirror cabinets and vanity lighting can be specified against one set of dimensions and shipped on one consignment. Our Custom & OEM Service covers bespoke sizes, finishes and branding where the project calls for it, and our Logistics & Door-to-Door Delivery service handles freight, packaging and container loading to site.
For a multi-bathroom project, the useful deliverable is a schedule listing each counter by room: overall size, basin type, material, edge profile, tapware reference and installation date. One table like that lets us quote every bathroom consistently and flag where two rooms can share a fabrication.
A short enquiry checklist
Send with your request:
- Quantity of counters, by room or unit type.
- Dimensioned elevation and plan, with basin centres, set-backs and counter height.
- Basin type and model reference for each counter.
- Surface material by name, edge profile, and veining direction if relevant.
- Tapware and waste model references.
- Support detail — vanity carcass from us, or site-built substrate.
- Destination, delivery address and required on-site date.
Send that and we can come back with a real quotation instead of an estimate. If you are still deciding between an undermount pair, a vessel pair or an integrated counter, send the room dimensions and we will tell you which one suits the space — that conversation costs nothing and saves a fabrication.
Enquiries about the Santerson Double Basin Countertop or any other item in the bathroom range can go to our team through the contact page, with your project drawings attached.