Timber-look wall linings and sliding screens are doing a lot of quiet work in Australian villas, boutique hotels and office fit-outs. They set the tone of a lobby, hide services, divide a suite and carry joinery through from floor to ceiling. Because they arrive as made-to-measure components rather than shelf stock, the difference between a clean handover and an expensive rework usually comes down to what you asked for in writing before production started. Below is the practical checklist we suggest working through when you are sourcing wood panel partitions from an overseas manufacturer.
Start with the scope, not the sample
A partition is a system: substrate, surface, edge treatment, framing, track or hinge hardware and the fixing detail behind it. Suppliers who quote only a panel price tend to leave the rest of that system out of the order. Ask for the scope broken into those parts, and ask which items are included in the quoted price and which you must source locally. That single question exposes most of the gaps early.
For wall linings that continue around corners or meet a ceiling, request a setting-out drawing rather than a photograph of a previous job. A setting-out shows panel widths, joint positions, openings and reveals against your own dimensions, and it is the document your site team will build to.
Confirm the substrate and surface separately
"Wood panel" covers several very different constructions. A veneered engineered board behaves differently from a laminated board, which behaves differently again from a solid timber panel or a flexible stone-effect sheet used for curved walls. Ask specifically what the core is, what the face is, and how the two are bonded. Then ask how the surface is meant to be cleaned, because that answer tells you a lot about whether the finish will survive in a guest room corridor or a members' bar.
Where moisture matters — ensuite walls, wet areas, poolside pavilions — ask what substrate and edge sealing the supplier recommends for that wall, and have them state it against the drawing. If they cannot answer without seeing the detail, treat the specification as unfinished.
Ask how far the product is actually customised
Some listings described as custom are really a fixed range with a choice of colour. Genuine made-to-measure work should let you set dimensions, layout and finish to the room. On the SANTERSON catalogue, entries such as Wall Panel Systems and Partition Sliding Systems are listed with made-to-measure sizing and material and finish options, which is the right basis for a project-specific order — but the listing itself does not fix track type, hardware or opening dimensions. Those need to be confirmed for your job.
The same applies where a door is set into the panelling. Integrated Door & Paneling only reads well once the concealed hinge type, leaf size and gap tolerance are agreed in advance; otherwise the joint line wanders across the wall.
Match acoustic and fire expectations to the room
For hotels, boardrooms and shared office floors, decide early whether the partition needs to reduce sound transfer. Acoustic performance depends on the panel build, the seal at the perimeter and the track detail, not on the timber look alone. SANTERSON lists dedicated acoustic panels and acoustic sliding panels for that purpose, which is a different enquiry from a decorative screen.
Fire behaviour requirements in Australia are set by the building code and enforced by your certifier or fire engineer. Do not assume an overseas datasheet answers them. Send the intended location and use to your certifier, get the required classification, and then ask the supplier for test documentation that matches that classification. If the document does not exist yet, that is a decision point, not a detail to tidy up later.
Settle who measures, who installs and who fixes snags
This is where imported joinery most often goes wrong. Establish in writing: who takes the site dimensions and when; whether a pre-production sample or mock-up panel will be shipped for approval; who supplies the track, fixings and closure trims; and whether installation is done by a local contractor to the supplier's drawings or by installers arranged by the supplier. SANTERSON lists on-site installation, inspection and snag resolution among its after-sales services, but installer availability in your state, warranty terms and response times should be confirmed for the specific project before you rely on them.
Price the whole delivery, not the panel
| Line item | Question to get answered in writing |
|---|---|
| Packaging and crating | How are large panels protected at the corners, and what is the crate footprint against your site access? |
| Freight and Incoterms | Is the quote to port or door-to-door, and which party handles customs clearance and duty? |
| Spares | Can replacement panels and hardware be reordered later against the same specification? |
| Lead time | When does the clock start — after order, or after drawing approval? |
| Inspection | What is checked before despatch, and can you nominate a third-party inspection? |
SANTERSON describes freight forwarding by sea, air and rail with customs paperwork and door-to-door delivery, which is a workable route for Australian projects. Import terms, duty, insurance and transit time still need to be confirmed order by order, and the resulting figures should sit in your budget rather than in a marketing page.
Working through these points with SANTERSON furniture and building materials is straightforward, because the company works project by project across design, custom/OEM production, logistics and installation — the same sequence a partition order needs. If you are specifying timber partitions or wall panelling for a villa, hotel or office in Australia, send your drawings and room list to the SANTERSON team and ask for a scoped quotation against them.