A quotation for an outdoor swim spa rarely arrives as one number. It arrives as a package of shell dimensions, pump counts, jet layouts, options and freight terms — and the gap between two offers usually sits in the details that are easiest to skim past. If you are comparing tenders for the Outdoor Swim Spa WS-PC03, this checklist sets out what a complete line item should state, and which omissions turn into change orders on site.

Start With the Model Reference, Not the Category

Check first that every document in the tender — quotation, drawing, packing list and proforma invoice — carries the same model code. Our swim and hydrotherapy range is catalogued by code, and codes that look similar are not interchangeable: WS-PC02 and WS-PC05 differ in shell footprint, pump count and total connected power. An offer described only as "square swim spa, three metres" cannot be set against a competitor's, because two units of the same footprint can carry very different water systems.

For WS-PC03 the catalogue entry lists a shell of 3000 × 3000 × 1000 mm. Use that as the reference dimension for your deck layout rather than as the finished construction dimension: final height depends on the cladding, insulation and steps specified in your configuration.

Read the Water System Line by Line

This is where quotations are most often incomplete. The catalogue specification for WS-PC03 shows one control system set, one water pump, one filter pump, 50 jets including four water columns, and one LED light, with a total power figure of 2.75 kW. Put three questions to each line you receive:

  • Is the quantity stated per unit or for the whole project? "Filter pump — one" is clear. "Pumps as required" is not, and it is the wording that later becomes a variation.
  • Does the jet count include the water columns? The WS-PC03 entry records 50 jets plus four water columns. An offer quoting only "50 jets" may or may not have priced the columns, so confirm in writing.
  • Is the power figure for the standard configuration or the one you requested? Total connected power shifts as soon as a heat pump, additional pump or UV unit is added. The 2.75 kW on the catalogue page describes the listed equipment, not your optional extras.

Apply the same discipline to features shown on the product page. Water jets, LED lighting and ozone appear as features of the shown configuration; being pictured is not the same as being included, so ask each supplier to mark every item included or optional.

List Optional Equipment Explicitly

Our swim spa catalogue prices options separately because availability and compatibility vary by model: control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Each should appear on the quotation with a quantity, or be confirmed as not required. Two points matter most to procurement:

  • Heating and insulation drive running cost more than the jet package does. On a cool-climate site, establish which insulation package and heat pump capacity are priced, and what total connected load results for electrical design.
  • Filtration choice affects the plant area, not only the price. Sand filtration needs space and drainage that cartridge arrangements do not, so settle it before the wet-area drawings are frozen.
Ask every supplier to state, in one line per item: equipment name, quantity, model or specification, whether it is factory-fitted or site-installed, and whether it falls inside or outside the quoted price. A quotation you can read that way compares line for line against every other tender.

Confirm Electrical and Site Requirements Before You Sign

The catalogue page does not fix a single electrical supply for the range, and it should not: the requirement follows the configuration. A quotation becomes usable only once it answers what your electrician and civil contractor will ask later.

Item to confirmWhy it belongs on the quotation
Total connected power for the selected configurationSets supply size, protection and cable route; a later increase means new switchboard work.
Supply voltage and phase as deliveredConfirm it matches the site supply at the spa location, not at the factory.
Control system scope and placementDetermines where the interface sits relative to the coping and how it is shielded from weather.
Structural support and substrate noteA filled shell is heavy; the slab or plinth detail must be agreed with your engineer before the deck is poured.
Drainage, overflow and service accessPump and filter access panels need clearances that are easily lost once tiling set-out is fixed.
Delivery point and unloading methodSets the crane or forklift allowance in your site programme.

Compare Scope of Supply, Not Just Price

Once equipment is settled, compare what surrounds the unit: steps and coping interface, cladding material and colour, LED fitting count, and packaging standard for export freight all differ between offers. Where a project also calls for poolside loungers, cabana daybeds or a hardtop gazebo beside the spa deck, ask whether these can sit under one supply package so that finishes, delivery windows and site coordination are handled once. The Swimming Pools and Swim Spas range and our outdoor collections ship together on villa and resort projects.

Where a spa must fit an irregular terrace, the alternative to a catalogue model is a made-to-shape unit. The Customizable Shape Outdoor Spa is built in square, round, oval and curved forms with an acrylic shell and structural reinforcement — the route to take when a standard footprint fights the site geometry. In that case the quotation should carry a drawing you can sign off, not only a model code.

A Short Pre-Award Check

Before the purchase order is issued, read the final quotation against this list:

  • Model reference identical across quotation, drawing and invoice.
  • Shell dimensions stated, with a note on finish build-up.
  • Pump count, jet count including water columns, LED count and control set all quantified.
  • Options marked included or excluded, with total connected power restated for the final configuration.
  • Delivery terms, packaging standard and unloading responsibility named.
  • Site support scope defined: who installs, who commissions, what is handed over at completion.

A quotation that satisfies those points can be compared honestly with its competitors. One that misses them will look cheaper until the first variation reaches the site.

SANTERSON has supplied furniture and building materials for villa, resort and hospitality projects since 2008, covering design coordination, production, door-to-door freight and installation support. Send us your deck drawing and required configuration and we will return an itemised quotation you can compare line for line.