Of all the bedroom fit-outs we quote, an Island Walk in Wardrobes layout is the one where an enquiry without drawings almost always comes back wrong. A straight run of wardrobes can be estimated from two wall dimensions. An island layout adds a free-standing unit in the middle of the room, circulation on all four sides, and often a third elevation to glaze or light. Send us a rough sketch and we will still ask you for the same list of items before we issue a firm number. Below is that list, in the order our project team actually works through it.

1. The room envelope, not just the floor area

Floor area alone tells us nothing usable. What we need is a dimensioned plan of the room: each wall length, the position and width of the doorway, and any column, bulkhead or skirting that interrupts a wall run. Ceiling height matters more than usual here, because an island wardrobe normally carries full-height hanging on two or three walls, and the vertical clearance decides whether upper cabinets reach the ceiling or stop short with a filler.

Please confirm the finished floor level as well as the structural slab. The gap between a screed and a timber floor changes every unit height on the list, and it is far cheaper to absorb in the design than on site.

2. Clear circulation around the island

Tell us the clear walkway you intend to keep between the island and the surrounding runs, and whether doors or drawers swing into it. This single dimension decides the island footprint. A tight room forces a smaller island with shallow drawer banks; a generous one allows deep top storage and a glass-topped display section. If the space is awkward rather than simply small, an L shaped walk in wardrobe or a U Shaped Walk in Wardrobes layout often delivers the same capacity with less walking distance, so we will say so if your plan points that way.

3. Island dimensions and what goes inside

For the island itself we need overall width and depth, the height of the carcass, and whether the top surface is for folding, display or nothing at all. Then the internal split: number and depth of drawers, tray dividers for watches and jewellery, a laundry hamper bay, or open shelving on one face. Drawer depths are set to what you store — shirts, folded knitwear, linens — so send us your preferred stack rather than expecting us to guess it.

If the island top is glass, say whether you want a light inside the cabinet or only above it. Integrated lighting needs a cable route decided at the design stage, not after the carcass is on the truck.

4. Perimeter runs: hanging, shelving and doors

For each wall run, list single hanging, double hanging, long hanging for coats and dresses, and shelf-only sections, with the heights you want for each rail. Then choose how those runs close: no doors at all as in Open Walk in Wardrobes, glass fronts as in Glass Walk in Wardrobes, or a dressed boutique finish with mirrors and panelling. The door decision changes the hardware, the tolerances and the price, so it should be settled before quotation, not during production.

5. Materials, finishes and edge details

Send us the board material you want for carcasses and doors, the finish — lacquer, veneer, laminate or solid timber — and the colour reference. A paint code or a photograph of an existing joinery run is enough to start; we match against your sample rather than a screen. Tell us which edges are visible, because an island shows four faces to the room while wall units show one, and exposed edges are usually band- or lacquer-finished to the same standard as the door fronts.

Hardware preferences belong in this batch too: soft-close runners, push-to-open, integrated handles, and any brand you specify. If a project already has an approved ironmongery schedule, attach it.

6. Drawings, references and the site itself

A PDF or DWG plan is ideal, but a hand-drawn plan with dimensions written on it works just as well — we redraw it. Add any 3D view, mood board or reference photograph that shows the look you are after, plus the room photographs. For villa and apartment projects where the wardrobe has to match kitchen cabinetry and doors, send us those specifications too; our interior design service covers space planning, 3D renderings and production coordination across the whole fit-out, so matching finishes across trades is part of the brief rather than an afterthought.

7. Quantity, delivery address and installation

One villa or twenty identical apartment bedrooms changes both the build and the price, so state the quantity of each layout. Give us the delivery address, the port or door-to-door arrangement you want, and access details for the upper floors — stair width, lift size, and whether units have to be carried past a tight turn. Our logistics and door-to-door delivery service handles freight, packaging and container loading, and we will tell you where a unit must be split into sections to reach the room.

Tell us who installs. We support on-site installation and inspection through our installation and after-sales support, but plenty of clients use their own joiner, in which case we send setting-out drawings and a fixing detail for the island, including how it ties to the floor.

8. Budget range and programme dates

A budget band is not a trap; it lets us propose a realistic specification on the first pass instead of sending something you will strip out. Equally, tell us the on-site date and when the drawings need signing off. Our cooperation steps run from project brief and design proposal to quotation and detail confirmation, then production, shipment and follow-up — so the date you give us works backwards into a drawing deadline, and we will confirm that date in writing before we start.

What happens after you send it

You get a marked-up plan back, not just a price. We flag anything that will not work — a drawer blocked by a door swing, a rail too high to reach, an island left with too little walkway around it — and we quote against the revised layout with every dimension and finish written out, so what you approve is what gets built. Anything still open on your drawings becomes a question in that reply rather than a surprise at handover.

Send your plan, room photographs and the notes above to our project team, and we will come back with a quotation you can compare line by line against any other supplier's.