A full-height storage wall looks simple on a drawing: one continuous run of panels from floor to ceiling, some closed doors, some open niches. That apparent simplicity is exactly why quotations for these systems are so easy to compare badly. Two proposals can describe the same wall on paper and arrive with very different prices, because the differences sit in what was measured, how the carcass is built, which hardware is included, and where responsibility for site preparation ends.
If you are weighing a Santerson Full Height Storage Walls proposal against other offers, this guide sets out what to ask for as a sample, what must already be on the drawing before a price means anything, and which line items usually explain a wide gap between two quotations.
Start with scope, not finish
Most comparison mistakes happen because buyers check door colours first and construction second. In a wall that spans a whole room, construction decides how the unit behaves after a year of use: whether shelves stay flat under load, whether doors remain parallel, and whether joints between panels stay visible.
Before comparing finishes, confirm that every quotation you hold answers the same four scope questions:
- Where does the run start and stop — is it one uninterrupted line, or is it broken by doors, radiators, skirting or a window reveal?
- What sits behind it: solid masonry, a stud partition, or a wall that will need packing and lining to bring it plumb?
- Is the ceiling level, and does the design resolve the gap at the top with a scribe, a shadow gap or an integrated pelmet?
- Who prepares the site, and who carries the cost if the wall turns out to be out of plumb once panels arrive?
What a sample should actually show you
A door swatch tells you colour. It does not tell you whether the panel will stay flat, whether the edge will chip where it is trimmed on site, or whether the finish still reads the same under warm lighting. Ask each supplier for physical samples that expose construction rather than surface alone.
Request these three items
- A full cross-section of a door or panel — face material, core and edge treatment. This is where differences in stability and durability become visible.
- An edge sample showing the joint to an adjoining panel, so you can judge how pronounced the shadow line will look across a long run.
- A finish sample viewed in the room itself, ideally against your flooring. Wood tones and matte lacquers shift noticeably next to different floor colours, which is why we specify these walls alongside engineered wood flooring for the same project.
Our wall systems are made to measure: sizing, layout, material and finish are set per space rather than picked from a fixed module range. That makes the approved sample much closer to what arrives than a catalogue colour card — but it also means your specification has to be complete before the sample is worth judging.
Read the drawing before you read the price
A comparable proposal comes with a dimensioned elevation, not a paragraph of description. On that elevation you should be able to see:
- Vertical and horizontal dimensions for every module, including overall height at each end of the run.
- The split between closed storage, open display niches and any media zone. Our collection treats these separately — mixed open and closed storage, open display niches and integrated media storage — so check which one your drawing actually shows.
- Internal layout: hanging zones, drawer stacks, shelf spacing, and whether shelves are adjustable or fixed.
- Door type. A hinged run, a sliding panel front and a handleless flush face are priced differently and behave differently day to day.
- Lighting provisions, including cable routes and transformer positions, if the design includes integrated cabinet lighting.
If a quotation arrives without an elevation covering these points, ask for it. A price set against an incomplete drawing is the most common source of variation orders later.
Where the price gap usually comes from
| Line item | What to check across proposals |
| Measurement basis | A site survey and re-measure before manufacture, or dimensions supplied by the client. Made-to-measure work priced from unverified dimensions carries risk that surfaces at installation. |
| Carcass and shelving | Panel thickness, shelf span, whether long shelves are supported, and whether adjustable shelving is standard or charged per row. |
| Doors and hardware | Hinge and runner brand, soft-close as standard or optional, load rating for sliding systems, and whether handleless routing sits inside the panel price. |
| Finish build-up | Number of lacquer or laminate layers, edge banding method, and how cut edges are finished on site. |
| Packaging and delivery | Protection for long panels, container loading method, and whether delivery goes to the site or stops at a port or depot. |
| Installation and after-sales | Whether fitting, snag resolution and replacement parts are included, and who supplies the fitter. Our service scope runs from design coordination through production, logistics, installation support and after-sales — but confirm what is quoted for your project rather than assuming it from a brochure page. |
One practical test settles most of it: ask each supplier to state in writing which of the items above are included and which are extras. A lower headline price that leaves out survey, branded hardware and installation is rarely cheaper once those costs are added back.
Built-in wall or separate furniture
A storage wall is often quoted as an alternative to buying wardrobes and shelving separately. That comparison only works if you compare use, not cost alone. A built-in run takes the full height of the room and closes the gaps freestanding units leave at the top and sides; loose furniture can be moved and reconfigured later.
For a bedroom wall whose brief is maximum concealed storage behind a flat face, custom minimalist bedroom wardrobes are usually the better fit. Where the same wall has to display as well as conceal — books, ceramics, a television — an integrated storage wall keeps those jobs in one continuous composition instead of three separate pieces of furniture.
Whole-house work normally combines both. On our mid-century whole-house custom cabinetry project, a bay-window desk with drawer storage, open staircase shelving and wood-grain kitchen cabinets were produced as one package, each measured on site. The arched niche and full-house wall cabinet project pairs lit display niches with a full-height concealed wardrobe and an integrated vanity along the same wall line. Both are useful references for how a long run can be broken up without losing continuity.
Questions to put to every supplier
- Which dimensions were used, and did they come from a site survey or from drawings?
- If the wall or ceiling is out of plumb, how is that absorbed — and who pays?
- Which hardware brand and model are quoted, and what is the route for replacement parts later?
- How are long panels transported, protected, and brought into the building on delivery day?
- What is fitted by the supplier's own team, and what is handed to local trades?
If you would like a full-height storage wall priced for comparison, send the room dimensions, a photograph of the wall, and how you intend to use it — what is concealed, what is displayed, and whether a television sits in the run. We will return a dimensioned elevation with construction, hardware and finish specified, so your next round of quotations can be compared line by line. Send those details through our contact page.