A mirror cabinet looks simple on a drawing until it arrives on site with the wrong width, an unplugged cable behind the tile and a door that swings into the basin. Because our Santerson LED Mirror Cabinet is made to measure — finish, layout and dimensions are specified per project — the installation plan has to be written before production starts, not after. Below is the checklist we work through with architects, contractors and bathroom fit-out teams so the unit goes up in one visit.

1. The measured opening, taken from finished surfaces

Send us dimensions referenced to finished wall and floor levels, not to structural ones. Tile thickness, waterproofing build-up and any plasterboard packing change the clear opening by enough to matter for a made-to-measure carcass. We need the width and height of the clear wall area, the projection you want from the wall, and the position of the basin centre line so the cabinet reads as centred on the mirror rather than on the wall.

Also note obstructions: pipework chasing, isolator boxes, ceiling downlights and the swing arc of the shower door. A cabinet that clashes with a tap or a handle is a site problem nobody can solve with a saw.

2. Wall build-up and what holds the load

Mirror cabinets are heavy: glass, carcass panels and stored bottles together. Tell us the wall make-up at the fixing line — solid masonry, stud partition with noggin blocking, or a framed wall that still needs a steel backing frame designed in. We confirm the fixing method for the wall type you have on site, and where blocking is required we say so before the wall is closed up.

3. The electrical provision for the LED

This is the item most often left out of a bathroom drawing. For an illuminated unit, decide with your electrician where the supply terminates: behind the cabinet on a spur with an accessible isolator, or at a nearby junction that stays reachable after tiling. Record the circuit details, switch location and cable route on the same drawing as the cabinet elevation, so the electrician and the tiler are working from one version.

If you want lighting beyond the cabinet itself, our Santerson Integrated Cabinet Lighting and Vanity Lighting are specified the same way — finish, layout and dimensions per project — so put them on the plan together with the cabinet rather than treating them as an add-on at handover.

4. Interface with the vanity, basin and mirror height

Set the mirror centre to the users you are designing for, then check the gap between the cabinet base and the basin or countertop. A tall unit next to a Santerson Floating Vanity needs its own dimension line: hanging heights, tap reach and the splash zone all interact. Where storage is the driver rather than the mirror, our Santerson Tall Mirror Cabinet is planned from floor level up, which changes both the fixing detail and the door clearance.

5. Interior layout and what will actually be stored

Specify the internal configuration in writing: shelf count and spacing, whether sockets or a shaver outlet are wanted inside, mirrored or solid doors, and any niches for tall bottles. Interior layout is part of the made-to-measure specification, so it must be agreed before manufacture; changing shelves after the carcass is built means a new panel.

6. Finish, glass and hardware matched to the room

Confirm the carcass finish against the vanity and any kitchen or wardrobe joinery in the same project, plus the glass type and hardware. We supply material and finish options as part of the specification; ask for a sample reference rather than relying on a screen image, especially where the room uses warm woods or a dark matte palette.

7. Access, packaging and delivery sequence

A full-size cabinet has to fit through the stairwell, the lift and the bathroom door. Confirm the route from the delivery point to the room, and schedule the unit to arrive after wet trades and tiling are complete but before final fixtures and accessories go in. For multi-unit jobs such as apartment or villa bathrooms, list each unit by room number on the packing schedule so nothing lands on the wrong floor.

8. Site conditions at the time of installation

Book installation once the wall is finished, level and dry, the electrical provision is tested, and the basin or countertop position is fixed. Add a simple snag list to the plan — door alignment, sealant line, switch operation, light output — so handover is signed off against something concrete.

9. Accessories planned on the same wall

Rails and heating elements compete for the same wall space as the cabinet, so place them early. Our Santerson Towel Warmers & Rails are also configurable by finish, layout and dimensions, and their electrical and fixing requirements belong on the same drawing as the cabinet.

10. Documentation to keep with the unit

File the approved shop drawing, the confirmed finish and hardware codes, the electrical provision detail and the spare-parts reference with the project record. For a residential bathroom this is what makes a later repair or a matching replacement straightforward; for a handed-over development it protects whoever maintains the property after you.

How our team supports the plan

Send the room elevation and we work back from it: dimension check against your finished levels, layout and finish selection, then production coordinated with the delivery and installation stages described under Turnkey Solutions. If you are also specifying ceramics, showers and lighting for the same bathrooms, they can be handled together under Bathroom Sanitary Fixtures, which keeps one specification sheet across the room.

Before you release the order, run your plan against this short list: finished-level dimensions, wall build-up and fixings, electrical provision with isolator location, vanity and basin interface, internal layout, finish and hardware confirmation, delivery route and timing, site readiness, accessory positions, and the document set to keep. Anything missing from that list is what costs a second site visit.

For dimension review and specification of a made-to-measure mirror cabinet for your project, contact PHILLIP on +86-13928214007 or santerson@qq.com.