A purchasing team rarely buys one outdoor piece at a time. When the patio, pool deck or garden lounge of a villa or resort is being furnished, the swing loveseat and the chaise lounge usually land on the same purchase order, and they are expected to look like they belong together. That is exactly where a product submittal earns its keep: it is the single document pack that lets an architect, a contractor and a buyer sign off on the matching patio set before metal is cut and fabric is cut. Below is what we ask clients to expect in a complete submittal for an outdoor swing loveseat and chaise lounge set, and what they should send back to us so nothing gets guessed.
1. Identification: the items, not a mood board
Start with unambiguous identification. A submittal should list every line of the set separately — the freestanding swing loveseat and the matching chaise lounge — each with its own product reference, the page or drawing number it comes from, and the quantity for that zone. Grouped photos are pleasant; they are not sufficient. For our coordinated leisure group, the two pieces share the same frame finish family and the same upholstery so the set reads as one design, which is precisely why both items must be listed with their own dimensions and finishes rather than described once as "the swing set".
Include the location each set is destined for. A poolside pair at a resort and a terrace pair at a private villa carry different handling, cushion storage and cleaning assumptions, and reviewers read the rest of the pack differently once they know which zone they are looking at.
2. Dimensional drawings and clearances
Dimensioned drawings are the part that gets returned for revision most often, because an outdoor swing needs more than a footprint. A useful drawing pack shows:
- overall width, depth and height of the swing loveseat and of the chaise lounge, with seat height and seat depth called out separately;
- the footprint of the swing stand, since a freestanding swing sits on legs rather than against a wall;
- the swept arc of the swing and the clearance needed in front of and behind it so the set can actually move;
- spacing to the pool edge, planters, balustrades and traffic routes;
- how the pieces sit together as a group, so the chaise lounge is not drawn into the swing's swing path.
Where dimensions are adjustable — cushion thickness, backrest angle on loungers that recline, or optional side tables — say so in the drawing rather than presenting one fixed number. Buyers who assume a single rigid dimension tend to order the layout around it and then discover the clearance problem on site.
3. Frame, hardware and finish schedule
The frame is what decides whether the set still looks correct in year three. Our coordinated set uses a powder-coated aluminium frame with reinforced hanging chains for the swing, and matching chaise lounges carry the same design details. A submittal should state the frame material, the coating type, the colour reference the buyer approved, and which hardware carries the swinging load. Chains, brackets and fixings belong in the pack because they are the items a site team will inspect during installation.
If the project mixes collections — for example a swing set on the terrace and a rope weave or teak-accented lounger by the water — show how the finishes relate. A common question from reviewers is whether the metal tones, wood accents and weave types were chosen deliberately or simply happened to arrive together. Where our aluminium frame with teak armrest pieces sit in the same outdoor programme, we note the shared design language so the reviewer can see the coordination was intentional.
4. Fabric, cushion and consumable schedule
Upholstery is where a set either matches the interior scheme or breaks it. The submittal should name the fabric type, the colour or pattern reference, the cushion construction, whether covers are removable for cleaning and storage, and how many spare or replacement covers the buyer wants quoted at the same time. Our set uses outdoor bouclé upholstery; other collections in our outdoor furniture range use performance fabrics chosen for exposure to sun and moisture.
State plainly what the fabric wording on the page means in practice. Water and UV resistance are described by us as properties of the outdoor fabrics we specify, but they are not a licence to leave cushions out through a storm or an off-season. A good submittal says how the cushions should be stored between uses, because that instruction protects both the buyer's budget and the look of the set.
5. Customisation options and their consequences
Project orders almost never take a catalogue configuration unchanged. For this kind of set we arrange custom upholstery, frame colour and dimensions for hospitality orders, and across our outdoor collections clients also change cushion patterns, accent pillows, weave colours and tabletop accents. The submittal should record every deviation from the standard item, because each change moves something else: a different dimension changes clearance, a different fabric changes lead time and cleaning guidance, a different finish changes what the site team must protect during installation.
Our custom and OEM service covers bespoke finishes and textures alongside design and prototyping. In a submittal this becomes a short table: item, standard specification, project specification, effect on price, effect on delivery. That table is what prevents an approved sample from being quietly swapped for something cheaper later in the programme.
6. Commercial terms and package breakdown
A submittal that cannot be priced is only half a document. It should show packaging per set, the piece count and carton dimensions for freight planning, the quotation split by line item, the minimum order quantity for customised configurations, and the Incoterms basis being quoted. For sets going to Australia or elsewhere overseas, we arrange sea, air and rail freight with customs paperwork handled on our side through logistics and door-to-door delivery, so the submittal should already reflect the packing standard that shipping requires rather than a showroom packing assumption.
7. Installation, inspection and after-sales
Close the pack with what happens after the crates arrive: assembly sequence for the swing stand, who sets and levels the frame, how the chains and suspension hardware are checked once the set is loaded, and which items are on the snag list at handover. Our installation and after-sales support covers site installation, inspection and snags, plus spare parts and replacement for wearing components such as cushion covers. Naming those consumables in the submittal — rather than leaving them to a later email — is what lets a facilities team budget realistically.
8. What the buyer should return
A submittal only closes when comments come back in writing. We ask for confirmation of the fabric and finish references, sign-off on the clearance dimensions against the landscape or architectural drawing, the delivery address with access notes, and the contact who has authority to approve a deviation. If a reviewer wants an alternative — a hardtop swing instead of an open frame, or loungers that match the same poolside palette — that is where we substitute from the wider collection and reissue the affected pages rather than the whole pack.
Bundling the set with the rest of the outdoor programme makes this easier. Under our turnkey project solutions, swing sets, loungers, dining groups and the surrounding interior fixtures are specified and tracked as one package, so a change to the pool deck shows up everywhere at once instead of in three separate approvals.
A short checklist before you submit
- Every piece of the set listed individually with its own reference and quantity.
- Drawings that show the swing's swept arc and clearance, not just a footprint.
- Frame, coating and load-bearing hardware named with an approved colour reference.
- Fabric reference, cushion construction, removable-cover detail and storage guidance.
- All customisations tabulated with their effect on cost and lead time.
- Packing, quantities and quotation basis ready for freight planning.
- Installation sequence, snag items and consumable spares identified.
- A named approver who can close the comments.
If you are assembling a submittal for a patio, terrace or poolside programme and want the swing loveseat and chaise lounge pack prepared to this structure, send us the drawings and the zone layout and we will return the dimensional sheets, finish schedule and quotation together. Contact our project team with your quantities and target delivery location to start the specification.