A modular living wall can make or break the feel of a serviced apartment lobby, a show flat or a resident lounge — and most of the risk sits in the proposal, not on site. If you are assessing a quotation for Santerson Mixed Open & Closed Systems, the useful question is not whether the render looks good. It is whether the document in front of you tells you what will actually be manufactured, delivered and installed for your commercial project.
Start with scope: which wall system are you actually buying?
SANTERSON publishes more than one configuration that mixes open shelving with closed cabinetry, and the names are close enough to cause procurement errors. The Mixed Open & Closed Systems item sits in the Modular Living Systems collection for residential living projects, while a separate Mixed Open & Closed Storage page belongs to the Integrated Storage Walls collection. Related options such as Floating Modular Systems and closed modular units can look similar in a mood board but behave differently in a schedule of works.
Before you read a single price line, confirm that the proposal names the exact product page, collection and room-by-room location for each run of joinery. In a multi-unit project, an unlabelled elevation is where variation orders come from later.
Six items a commercial proposal must state in writing
These systems are made to measure, and the product pages list project-specific dimensions together with material and finish options rather than one fixed specification. That flexibility is the point — but it also means two quotations can look identical on paper and produce completely different walls. Ask for each of the following as a line item:
- Dimensioned elevations. Overall width, height and depth for every module, plus which bays are open, which are closed, and where the runs terminate against a wall or an opening.
- Substrate and surface. The board material behind each door panel, the finish type (lacquer, laminate, veneer or other option offered), the colour or grain reference, and the edge treatment on visible profiles.
- Open-shelf build. Shelf span and thickness, bracket or hidden-fixing method, and whether shelf heights are fixed or adjustable. Shelving in a resident lounge is loaded differently from shelving used purely for display.
- Closed-carcass internals. Drawer versus door configuration, runner and hinge quality level, and internal fittings such as drawer units or tall-cabinet layouts.
- Integrated services. If the design includes lighting, state the fitting type, driver location, access for maintenance and who supplies and connects the power. Integrated cabinet lighting and shelving accessories are separate specification decisions, not assumed extras.
- Interface details. Skirting treatment, reveals around flooring and ceiling lines, and how the system meets other finishes such as wall panels.
How to compare two quotations on the same wall
Price per linear metre hides more than it reveals. Put both offers into a simple comparison sheet and keep the row labels identical:
| Line to compare | Why it matters commercially |
|---|---|
| Measured length of each run | Different take-offs explain most price gaps before quality is even considered. |
| Inclusions per module | One supplier may include internal fittings, lighting or glass; another prices them as extras. |
| Finish and hardware references | Named make or grade lets you substitute later without re-quoting the whole job. |
| Packaging and container loading | Modular casework arrives in many sub-assemblies; packing detail predicts damage risk. |
| Delivery term and handover point | Freight, customs clearance and the delivery address change the true landed cost. |
| Installation and snag process | Site fixing, alignment and punch-list closure belong in the same document as the joinery price. |
| Spare parts and warranty terms | Read what is covered, for how long, and what is excluded — not just the headline period. |
If a supplier cannot split these items out, they will not be able to defend them during a claim either. That is a fair reason to ask for a revised submission.
Working with an overseas manufacturer on fit-out packages
SANTERSON is a China-based furniture and building materials manufacturer operating since 2008, and the way it packages work matters for evaluation. The company describes an end-to-end route — consultation, design and planning, production, logistics, installation and after-sales — with custom and OEM service covering bespoke finishes and prototyping, plus door-to-door freight by sea, air or rail with customs paperwork handled on the supplier side.
For a buyer, that structure means one party can coordinate joinery alongside other finishes and fixtures from the same project package: built-in kitchen cabinetry, engineered flooring, wall panelling, lighting and rugs. The evaluation task becomes simpler — one coordinated set of drawings, one production schedule, one shipment — but only if the interfaces are documented. Where a single supplier covers several trades, insist that responsibility for each interface is written down rather than implied.
Australian import terms, duties, transit arrangements and local installation coverage should be settled per project, in writing, with the specific delivery address and site conditions stated. Do not carry marketing statements about service coverage into a contract without confirming them for your case.
Sample approvals before volume production
For commercial projects, ask for a physical sample board of the specified finish and one drawer or shelf bay as a mock-up. This is where you test colour under your own lighting, check how visible edges are finished, and confirm that adjustable shelving actually adjusts. Approving a mock-up in writing — with the signed reference kept on file — gives both sides something to measure production against.
Also settle the sequencing question early: does the wall system install before or after flooring and painting? Modular systems built to site dimensions need verified as-built measurements, so build a survey step into the programme and record who signs it off.
A quick pre-award checklist
- Exact product page and collection named for every run of joinery
- Dimensioned elevations, with open and closed bays identified
- Named substrate, finish reference, edge detail and hardware grade
- Shelf span, load intent and fixing method stated
- Lighting scope, driver access and electrical responsibility defined
- As-built survey step and sign-off owner in the programme
- Packaging, container loading plan and delivery term confirmed for your address
- Installation, snag closure, warranty period and exclusions in one document
A proposal you can evaluate is a proposal that says what is included. Request the specification detail up front, compare offers on identical rows, and approve a mock-up before volume production — that is how a mixed open and closed wall system performs as designed once residents or guests start using it.