A submittal is the document pack a buyer, builder or designer signs off before a wardrobe goes into production. For Mirrored Hinged Wardrobes, the paperwork matters more than it does for a plain cabinet: mirrored door faces, hinged hardware and made-to-measure carcasses each create approval points that are expensive to fix once the panels are cut. Below is the set of items we ask project teams to compile, and what each one protects against on site.
1. Drawings that match the opening, not the brochure
Every Mirrored Hinged Wardrobe we build is made to measure, so the first document in the pack should be dimensioned elevations of the actual room wall, not a catalogue image. A complete drawing set covers:
- overall width, height and depth at three points along the wall, because floors and ceilings in renovated villas are rarely square;
- door elevation showing leaf count, hinge side for each leaf and the opening sequence for returns and corners;
- internal layout — hanging zones, shelf stacks, drawer banks and any full-height or short sections;
- setting-out relative to skirting, architraves, light switches, air grilles and adjacent cabinetry.
Mark the mirror edges and trims on the elevation. Where a mirrored leaf meets a wall or a corner return, note whether the glass is trimmed, framed or butted, so the installer is not deciding that detail on the day.
2. A door and mirror schedule
Hinged mirrored leaves carry more variables than a flat timber panel, so list them leaf by leaf in a simple table the approver can initial.
| Item | What to record |
|---|---|
| Leaf size and count | Width and height of each leaf, plus total weight per opening |
| Mirror face | Mirror type, edge finish, whether the mirror is full-face or inset in a framed panel |
| Substrate and finish | Carcass board, door core, surface finish and colour reference from an approved sample |
| Hinges | Hinge type, quantity per leaf, load rating and whether soft close is specified |
| Handles | Handle style and fixing centres, or a note that the design is handleless |
| Clearance | Swing radius against the bed, door and any opposite furniture |
This schedule is also what lets a second supplier quote on the same basis, and it is the reference you point to when a snag appears months later.
3. Finish samples, not screen images
Mirror, lacquer and veneer all shift in colour and reflectivity between a render and a fitted room. Before sign-off we send physical material boards: carcass board edge, door face in the selected finish, mirror sample with its edge detail, and a hardware sample. For villa and hotel bedroom packages we keep one approved sample pack per room type so every wardrobe in the building matches. Our Custom & OEM Service covers bespoke finishes, textures and branding, so if a finish sits outside the standard range, request the sample at design stage rather than after the order is placed.
4. Structural and fixing details
Mirrored doors are heavier than timber ones, and full-height leaves amplify that load on the hinge line. The submittal should state how the carcass is fixed to the wall and whether additional support is needed above the wardrobe or at a corner return. Where a run reaches a ceiling height greater than the standard panel, note the joint position and the filler or scribe detail. Confirm the wall build-up with the builder — plasterboard, brick or tiled bathroom-adjacent walls each take anchors differently.
5. Packaging, transport and handling plan
Mirror is the item most often damaged between the factory and the apartment. The submittal should describe how mirrored leaves are crated — glazed panels separated and edge-guarded, corner protection on carcasses, and clear carton numbering that ties each package to a room in the drawing set. For international projects we arrange freight by sea, air or rail with customs paperwork, container loading plans and shipment tracking under Logistics & Door-to-Door Delivery, so the receiving team on site knows what arrives, when and in which sequence.
6. Installation and inspection record
Attach the installation method statement and the snag checklist to the same pack. For hinged mirrored wardrobes the practical checks are door alignment and gap consistency, hinge adjustment range, soft-close operation, mirror edge condition after handling, and confirmation that the finished sizes match the approved drawings. Our Installation & After-sales Support service covers on-site fitting, inspection and snags, spare parts and ongoing maintenance, so this section of the submittal becomes the handover record both sides sign.
7. Scope statement for matching trades
State plainly what the wardrobe supplier supplies and what the builder does: who carries out the site survey, who fills the gap between wardrobe and plasterboard, who connects in-suite lighting to the mirrored face, and who protects the finished joinery while other trades finish the room. Ambiguity here is the most common cause of a delayed handover on fitted-wardrobe packages.
Submittal checklist before you send it for approval
- Dimensioned elevations of the real opening, with hinge sides and swing direction marked
- Leaf-by-leaf door and mirror schedule including hinge load rating
- Internal layout sized to the client's storage requirements
- Physical finish and mirror samples referenced by code on the drawings
- Wall fixing method confirmed against the builder's wall build-up
- Crating and carton numbering plan matched to room names
- Installation method statement and snag checklist attached
- Scope split between supplier and builder written out
Wardrobe sizes, internal layouts, materials and finishes are specified per project. The specifications in your submittal, not a catalogue page, govern what is produced — confirm dimensions and selected details for each opening before release to manufacture.
SANTERSON builds made-to-measure Built-in Furniture, including hinged, sliding and walk-in wardrobes, for villa, hotel and apartment projects, with design coordination, manufacturing and door-to-door delivery under one scope. Send us your drawings and room list and we will return a submittal-ready specification for the Mirrored Hinged Wardrobes range and the rest of the joinery package.