A wardrobe quotation is only as useful as the information behind it. Two-tone melamine wardrobes sit in an awkward middle ground for buyers: they look simple on a drawing, yet every line — where one colour stops and the other begins, how the carcass is closed off, what sits inside — changes the price. The Two Tone Melamine Wardrobes in our Melamine Wardrobes collection are made to measure for residential projects, with finish, layout and dimensions specified per space. That flexibility is exactly why a vague enquiry produces a vague number. Below is the checklist we use when we quote, so you can send the same detail and compare suppliers on equal terms.

1. The opening: room, count and the wall each wardrobe stands against

Start with what a factory needs to know before it draws anything. For each wardrobe give us:

  • The room it belongs to (bedroom, guest room, hallway alcove, dressing room) and how many doors or drawers it should carry.
  • Overall width, height and depth at the widest point — plus the floor-to-ceiling height if you want a full-height built-in with an upper cupboard.
  • Whether the wall is straight or has an obstruction: a skirting board, a power socket, a beam, an out-of-plumb corner, a radiator or a window reveal that the carcass must scribe around.
  • Whether the unit is freestanding or built-in, and whether the sides are visible in the room. A visible side panel is finished on both faces; a side tucked into a joiner's recess usually is not, and that difference shows up in the price.

Send a simple sketch with dimensions marked, even a photographed floor plan with measurements written on it. Rough numbers you can defend on site beat tidy numbers you cannot.

2. The two tones: state which panels carry which colour

"Two tone" is not a specification. Two projects can both be called two-tone and cost very differently, because the split can sit in several places:

  • Doors versus carcass. Coloured or wood-effect door fronts against a lighter body — the most common arrangement, and the cheapest to keep consistent across rooms.
  • Solid doors versus glass or glazed inserts. A framed glass panel in one of four doors is a different line item from four plain panels.
  • Open niches against closed doors. Display shelves and open bays in a contrasting tone read well, but every open bay needs finished edges on three sides instead of one.
  • Trim and profiles. Aluminium handles, edge trims, shadow gaps and light channels each carry their own finish choice.

In your request for quote, name the tone for each element separately: doors, carcass interior, visible ends, open shelving, handles. If you have physical samples or a supplier colour code, say so and note where the sample is coming from — an imported board colour and our matching board can look identical in daylight and different under warm LED.

Ask us to confirm which surface texture you are being quoted. A matte melamine panel and a glossy one in the same colour code are not the same product, and fingerprints on a high-shine door in a family bedroom is a decision worth making before installation, not after.

3. Interior configuration: draw the inside, not just the outside

The interior is where most buyers change their minds after the order, and changes are expensive at that point. Decide now how each section is used:

  • Hanging zones: single rail or double stack, and the drop length for long garments.
  • Shelf spacing: folded linen, shoes, boxes — note heights you actually need rather than accepting a standard grid.
  • Drawers: how many, and whether they are shallow accessory drawers or deep linen drawers. Soft-close runners on all drawers is not the same quotation as soft-close on two.
  • Pull-out extras: tie and jewellery trays, trouser slides, laundry hampers in a base unit, an ironing station.
  • Lighting: door-triggered, motion-sensing or permanently lit shelf strips, and where the transformer sits — it needs to be reachable after the wardrobe is fixed to the wall.

If you have a similar wardrobe that already works well, photograph its interior with the doors open. It answers more questions in one image than a paragraph of description.

4. What to ask us for in writing

A quotation you can compare against two competitors usually breaks down into these lines. If any of them is missing, ask before you sign.

Item in the quoteWhy it matters
Board and finish specification per elementTies the price to a named surface, so a substitution later is visible rather than silent.
Carcass construction and edge treatmentTells you whether visible ends are finished and how open shelves are edged.
Hardware brand or range, and what is includedRunners, hinges and handles are where a low quote quietly gets trimmed.
Made-to-measure tolerancesConfirms how the unit is scribed to an uneven wall or ceiling.
Packaging and container loading planPanels arrive labelled by room, which decides how quickly a crew can install.
Delivery terms and destinationDoor-to-door service covers freight and paperwork; confirm what your site receives at the kerb.
Installation scope and after-sales termsWhether installation is on site, who inspects for snags, and how replacement panels are ordered.

Our Custom & OEM Service covers bespoke finishes, textures and prototyping, so a non-standard tone pairing is a conversation rather than a refusal. For a whole apartment or villa, the same boards can carry through to custom built-in kitchen cabinets, which is worth deciding early: matching two-tone panels across bedroom and kitchen is far easier when both are cut in one production run.

5. A short template you can copy

Project name and delivery city · number of wardrobes by room · width, height, depth for each · ceiling height and whether the unit is full-height · straight or obstructed wall, with sketch · door fronts: tone and texture · carcass interior: tone · open niches: yes/no and tone · handles: style and finish · interior layout per section (hanging, shelves, drawers, extras) · lighting: yes/no and type · delivery address and access notes · required site date.

Send that with two or three reference images of the look you want, and a quotation can be built against the same drawing every supplier is working from.

Two Tone Melamine Wardrobes are part of the Melamine Wardrobes range at SANTERSON, a China-based furniture and building materials manufacturer supplying wardrobes, cabinetry, doors, flooring, lighting and sanitary fixtures for villa and hospitality projects. Share your room dimensions and finish choices through our contact page, and we will price the specification rather than a guess.