A wabi-sabi rattan kitchen with an integrated island is not something you can order from a catalogue page. The wood tone has to sit correctly against the woven panels, the island has to line up with the room, and the appliance positions have to be reserved before the carcasses are built. That is why our quotation for this cabinetry starts from your drawings and reference images rather than from a standard size list. Below is what we need from you, what we send back, and how the details get locked down before production begins.

What the specification covers

The Wabi Sabi Rattan Kitchen Cabinets with Island is built around a solid wood frame with breathable woven rattan panels, and the island extends into a dining surface so that cooking, eating and conversation happen along one run of cabinetry. Open shelves carry recessed warm LED lighting for glassware and display pieces, and positions are reserved for built-in ovens. Cabinet dimensions, internal storage partitions, wood colour and surface treatment are all made to order.

Because the rattan panel is a woven material rather than a flat laminate, tell us how you intend to use the kitchen. A family kitchen in a villa, a show kitchen in a boutique hotel and a serviced apartment block each call for different decisions about panel protection, wear resistance and cleaning routine. We supply this cabinetry for villa renovation, boutique hotel and high-end apartment work, and we also build custom built-in kitchen cabinets where the brief asks for a fully integrated fixture rather than a decorative one.

The drawings and files to send us

You do not need finished design drawings to get a first price. Send what you already have:

  • Room layout — a measured floor plan or hand-drawn dimensions: wall lengths, ceiling height, window sill heights, door swings, and the position of existing water, gas, waste and electrical points.
  • Island intent — overall length and width, whether one long side becomes a dining overhang, how many seats you want, and whether seating runs along the island side or across its end.
  • Appliance list with model numbers — built-in oven, hob, extraction, dishwasher, refrigeration. Model numbers matter, because the reserved positions are cut to the appliance data rather than to a generic niche size.
  • Reference images — the mood you are after. Wabi-sabi sits comfortably with oak and ash tones, lime plaster, clay paints and stone worktops; send the photographs you like and we will match the wood colour and surface treatment to them.
  • Quantity and destination — one kitchen or a whole apartment floor, plus the delivery city, so freight can be priced realistically.

If there are no drawings yet, our interior design service can take the space planning and produce furniture layouts and 3D renderings before anything is quoted for production.

How we price it, and what the quotation contains

Custom cabinetry is priced by linear metre of run, then broken down by module. Rattan-fronted sections carry a different cost from plain wood-fronted ones, and an island that doubles as a dining table needs more structure and worktop support than a standard base unit. Your quotation itemises the following:

LineWhat we confirm with you
Carcass and door modulesDimensions, internal partitions, drawer versus door layout, hinge and slide specification
Rattan panelsWeave pattern, frame section, edge detail on each front
Wood colour and surface treatmentStain or paint tone, sheen level, treatment suited to the intended use
WorktopMaterial, thickness, edge profile, cut-outs for sink and hob
Integrated lightingRecessed warm LED positions in open shelves, driver location, switching
Appliance nichesReserved positions for built-in ovens and the rest of the appliance schedule
Packaging and freightSea, air or rail to your site, with the paperwork arranged on our side

We return a marked-up elevation drawing with the price, so you can see where every module falls before committing. Where a detail cannot be settled from drawings alone — the reveal between a rattan front and its frame, for instance — we raise it as a question instead of assuming.

Samples and approvals before production

For a material-led design like this one, approval of the finish matters as much as approval of the drawing. We arrange wood and rattan samples in your selected combination so you can judge the tone against your own worktop and wall finish under site lighting. Once the sample, the elevation drawing and the appliance schedule are signed off, we move into production. Our custom and OEM service covers bespoke finishes and textures, prototyping and flexible minimum order quantities, which helps when a project repeats the same kitchen language across several units with small variations.

Delivery, installation and what happens afterwards

Cabinetry arrives flat-packed in protective packaging, loaded to a container plan we prepare with you. Freight goes by sea, air or rail, with commercial invoices, packing lists and customs documents arranged on our side and door-to-door delivery organised to site. On arrival, installation follows the approved elevations, and inspection and snag items are worked through with your team; spare parts and replacement components remain available for the hardware and panels afterwards.

Send us your dimensions, appliance list and target completion date, and we will come back with a quotation that keeps the cabinetry cost, the freight and the production window as separate figures, so you can see where the money sits. Enquiries are handled directly by our project team.

SANTERSON — China-based manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects. Phone / WhatsApp: +86-13928214007 (PHILLIP) · Email: santerson@qq.com · Enquiries: https://www.santerson.com/contact/