A full height storage wall looks simple on a drawing: one clean plane from floor to soffit, doors that read as panelling, a few open niches for display. It is one of the most demanding items in a villa or hospitality fit-out, because it touches architecture, joinery, lighting, media services and door hardware at once. When the designer's intent and the buyer's scope are not aligned before production starts, the wall arrives as several separate trades arguing about who owns the gap.

Santerson Full Height Storage Walls are made-to-measure wall systems in our Integrated Storage Walls collection, with layout, dimensions and finish specified per space. The following is what we ask design teams and procurement leads to agree on before we quote or cut a single panel, so the wall is approved once and installed once.

1. Scope: storage, media or display surface?

The same elevation line can be doing three different jobs, and those jobs are frequently conflated at the brief stage.

  • A wall that must disappear into the room, where the priority is flush reveals and doors that read as panelling. Where the same plane has to hide a doorway as well, decorative concealed doors keep the elevation unbroken.
  • A wall that carries a screen and its equipment, where integrated media storage governs ventilation, cable routes, remote control and access to sources. Our Integrated Media Storage configuration covers that case.
  • A wall that displays, where open display niches set shelf spans, lighting positions and the visual rhythm of the elevation.

Decide which job dominates before discussing finishes. A wall that is mostly closed storage with two lit niches behaves differently from a mixed composition, and that difference drives cost far more than the door finish does.

2. The interface conditions, not just the elevation

A made-to-measure wall is only as good as the boundaries it sits between. Send us the surrounding construction, not only the joinery drawing.

InterfaceWhat we need agreed in writing
Floor and soffitFinished floor levels, ceiling build-up and whether the wall runs to structural slab or to a set-down. Tolerance for the head gap and who supplies the closure detail.
Adjacent openingsPosition of skirting, architraves, switches, sockets, air diffusers and any concealed door that must sit in the same plane.
ServicesPower, data, TV and speaker points with heights from finished floor; who runs cables to the wall and who terminates them inside it.
LightingWhether niche and shelf lighting is part of our scope or the electrical contractor's, plus driver access, switching and dimming method.
Existing wallsPlumb and square of the substrate. On renovation work we record site dimensions after the wet trades are finished, not from drawings alone.

Where a project is supplied internationally, these interface notes matter more than usual: the wall is built to the dimensions you confirm, and there is no second factory visit. Our installation and after-sales support covers site guidance and snag inspection, but the drawings still have to be right at approval stage.

3. Layout language both sides can sign

Mood boards do not survive production meetings. Agree a single dimensioned elevation with module widths, door swing or sliding directions, and the open-to-closed ratio marked on it. Where we combine open shelving with closed cabinets, we use mixed open and closed storage layouts so daily-use items sit behind doors and display pieces sit in the lit zones; that split should come from how the room is actually used, not from a rendering.

For bedrooms and corridors, sliding fronts change the plan. Sliding storage panels keep circulation clear in front of the wall but need track detail, panel overlap and a defined stop condition at both ends. Hinged fronts need clearance for the handle or a handleless groove, and that decision belongs to the designer, not to the workshop.

4. Finish and substrate: match what will be seen next to it

Specify the surface by where it appears in the building, because a veneer that reads well on a cabinet door can look busy across four square metres of wall. Wood veneer panels in particular need grain direction and joint detail drawn at 1:1 for one bay, then approved as a physical sample before the full run is made. Sample the actual panel, not an offcut swatch, and view it against the flooring, the kitchen joinery and the paint of the adjacent wall.

Our custom and OEM service covers bespoke finishes, textures and material choices across wood, metals, engineered stone and laminates. What we cannot do is correct a finish decision after the batch has been produced, so sample approval should be a signed milestone in the programme.

5. Procurement terms worth fixing before order

  • Who measures: factory site survey, local contractor, or dimensions issued from drawings with a tolerance clause.
  • Approval record: one signed elevation and one signed finish sample per wall type; revisions after that are re-costed.
  • Packaging and sequence: panels numbered to room and elevation, so the crate that lands first is the crate the installer needs.
  • Delivery terms and site access: freight mode, delivery point, lift or stair constraints, and storage conditions on site.
  • Spares and finishes held for the same batch, in case a panel is damaged after handover.

Import terms, duties, transit routing and delivery scope are confirmed per project rather than assumed; our logistics team handles freight forwarding, customs paperwork and door-to-door delivery, and the commercial terms should be written into your purchase order in the same detail as the joinery specification.

A practical test before you issue for manufacture: can the designer and the buyer each point to the same line on the same drawing and name who supplies it? If either hesitates, that item is not yet specified — it is only drawn.

If your team wants a second pair of eyes on the package, our interior design services include space planning, 3D visualisation and production coordination with on-site guidance, so the elevation, the interfaces and the order all describe the same wall. Send us the dimensioned elevation, the room's service layout and two reference images of the finish you expect, and we will return a specification with the open questions marked rather than quietly assumed.

Santerson Full Height Storage Walls are made to measure for each space, with material and finish options selected per project. Dimensions, materials and technical performance should be confirmed against the approved configuration for your project.