A swim spa of this size rarely fails at the specification sheet. It causes trouble when a site condition, an electrical allowance or a delivery route is discovered late. Before your project team signs off on Outdoor Swim Spa WS-PC04CH, the items below are the ones that decide whether the unit arrives, installs and is handed over without rework.
Start from the published figures, then confirm them in writing
The catalogue entry for this model gives a shell of 4500 × 3000 × 900 mm, one control system, one water pump, one filter pump, 46 jets in total, one LED light and a total power figure of 2.45 kW, with water jets, LED lighting and ozone listed as the features shown. Treat those numbers as the starting point for a written configuration sheet, not as a purchase order description. Ask your contact to restate each line against the exact unit being quoted, because options added later change both the equipment list and the services the site needs.
- Catalogue shell size: 4500 × 3000 × 900 mm
- Control system: 1 set
- Water pump: 1 pc | Filter pump: 1 pc
- Jet total: 46 pcs
- LED lights: 1 pc
- Total power: 2.45 kW
- Features shown: water jets, LED lighting, ozone
Four confirmations to close before approval
- Footprint versus the real slab. The 4500 × 3000 mm outline is the unit, not the pit, surround, drainage falls or access side. Have the landscape or civil package show where the spa sits relative to the pool deck, planting and any structure overhead, and mark clearance for filter and pump servicing.
- Electrical allowance at the board. The 2.45 kW figure covers the listed configuration only. Once a heat pump or an added pump enters the deal, the circuit, protection device and cable run change. Get the supply requirement for the final configuration from the supplier, then have the site electrician confirm what is already in the design.
- Which options are in and which are not. The catalogue lists control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps as options for this model, with availability depending on the configuration chosen. Put each option on the approval sheet with a yes or no against it, so nobody assumes an item is standard.
- Intended use. This model's captured specification does not list a swim training system. If a client brief asks for lap swimming or resistance training in this footprint, raise it before approval and look at other models in the range instead of assuming an add-on will cover it.
Three site-side items to assign
- Water supply and drainage. Confirm who provides the fill connection, where the overflow and drain discharge to, and what water treatment is expected before the unit is put into service.
- Delivery route and lifting. Check truck access, gate widths, overhead obstructions and the crane or forklift path against the actual set-down point, and confirm who handles offloading on the day.
- Commissioning sequence. Confirm who performs the first fill, who runs the initial system check, and what has to be finished on site before that can happen. Unassigned steps like these are what delay practical completion more often than the equipment itself.
Where procurement support normally helps
For villa and hospitality projects that already source several trades from one supplier, a swim spa is easier to coordinate when it sits inside the same package as the surrounding outdoor furniture, paving and lighting. Our Turnkey Interior Project Solutions cover design coordination, production, logistics and on-site guidance in one workflow, which keeps the spa's site requirements aligned with the rest of the outdoor package rather than leaving them to be reconciled between separate vendors.
Where a project needs a different size or a different equipment mix, the wider Swimming Pools and Swim Spas catalogue offers alternative dimensions and jet configurations, and Custom Furniture Design and Prototyping covers the bespoke joinery, seating and cladding that usually wraps around an installation of this kind.
The practical test
If your team can place the unit on the drawing, energise it against an existing circuit schedule, see the fill and drain connections on the services layout, and walk the delivery route from the gate to the set-down point, then WS-PC04CH is ready for approval. If any one of those four lines is still open, close it first — that is far cheaper than resolving it after the spa has shipped.
Project teams comparing configurations or checking whether this model suits their site conditions are welcome to send us the drawings and intended use, and we will confirm the equipment list and supply requirement for that specific installation.