A bidet rarely decides a bathroom scheme on its own, yet it is the fixture most often left out of the specification sheet until late in the project. By then the waste layout, the matching toilet and the tile setting are already fixed, and the room pays for it. The Floor Standing Bidet 1038F is a freestanding ceramic bidet basin for personal hygiene, and it behaves well under a proper specification precisely because its design decisions are few and visible: a floor-standing body supported and fixed at the back wall, an ergonomic curved form, a glossy ceramic glaze, and a matching relationship with the 1038 series toilet. This article walks through the line items that belong on that specification, so purchasing teams, contractors and interior designers can order once rather than twice.
Start with the mounting type, not the style
The first line of any bidet specification answers a construction question. The 1038F is described on its product page as a freestanding structure fixed to the wall with back support. That single sentence drives three downstream decisions: the floor stays clear apart from the pedestal footprint, the wall behind the unit must carry the back fixing, and the waste route has to be settled before the floor finish goes down.
Compare it with the alternative in the same catalogue, a wall hung bidet. A wall-hung unit removes the floor contact entirely and needs a concealed carrier; a floor-standing unit like 1038F transfers its load through the base and only ties back to the wall for stability. Neither option is universally better. In a hotel refurbishment where floors are already laid and walls are chaseable, the floor-standing route is usually the shorter one. Where the design intent is a fully floating look with continuous floor tile running into the wall, the wall-hung route wins.
Write down what the ceramic actually has to do
Ceramic specification language tends to collapse into "white vitreous china", which tells a factory nothing you can inspect on delivery. For this fixture the product page states two functional properties worth restating in your own words on the purchase order: a high quality glossy glaze that repels dirt and limescale, and a surface that is simple to maintain. Those are housekeeping claims, and they matter most in hospitality, where the cleaning regime is daily and the cost of an abrasive-resistant glaze shows up over years rather than weeks.
A practical specification line therefore reads: glazed ceramic basin, glossy finish, colour matched across the suite, with the glaze expected to resist dirt and limescale build-up under routine cleaning. Ask the supplier which cleaning agents are excluded from that expectation, and record the answer. It costs nothing at quotation stage and settles arguments later.
Specify the suite, not the single fixture
The 1038F page states that this bidet matches the same 1038 series toilet to form a complete bathroom sanitary suite. That is the highest-value line on your specification, because ceramic batches vary in tone and a bidet ordered separately from its toilet frequently arrives a shade apart. The catalogue lists Two Piece Washdown Toilet 1038A and Wall Hung Toilet 1038W in the same series, along with a wall hung basin in the 1038WB version.
Two rules follow. First, put every ceramic item of one room on one purchase order and request the same production batch for the suite. Second, keep the shape family consistent within a bathroom: a floor-standing bidet next to a wall-hung toilet produces two different base conditions, two different cleaning details at the floor line, and often two different heights. Where a project genuinely mixes both — accessible rooms versus standard guest rooms — specify them as separate room types so nobody has to defend the mix on site.
The dimensions and rough-in question
Here is where most specifications quietly fail. A bidet needs a waste connection, and the position of that connection relative to the finished wall and finished floor is set by the drainage design, not by the ceramic. The 1038F is fixed at the back wall, so the waste route — floor or wall — has to be confirmed against the as-built condition of each room type before the order is placed.
For the matching toilet in this series, the catalogue records two rough-in choices: an 180 mm wall-mounted P-trap and a 250 mm floor S-trap. Treat those figures as reference points for the series rather than as the answer for your bidet, and request the current technical sheet with dimensioned drawings before you issue the order. The trap type is also a good filter for the whole specification: if a room's drainage is a floor outlet, the floor-standing bidet pairs naturally with an S-trap toilet; if the wall carries the outlet, the wall-hung pair usually makes more sense.
A clean specification block for this fixture covers, at minimum: overall length, width and height; the centre line of the waste outlet and its distance from the finished wall; whether the waste is floor or wall; the fixing detail at the back support; tap hole configuration and the tapware that fits it; colour code and glaze finish; and the matching toilet model for batch consistency. Anything missing from that list becomes a site variation.
Where this fixture earns its place
The product page positions 1038F for home bathrooms, hotels and high-end villa renovation. That range is realistic for a floor-standing unit with a compact footprint: it suits projects where the bathroom is being reconfigured rather than rebuilt from a slab up, and where the client expects matching ceramic across the room.
For hotel work, the decision is usually driven by guest mix and maintenance. A floor-standing bidet gives housekeeping a solid base with no concealed carrier to service, and a glazed surface that takes daily cleaning. For private villas, the same fixture reads as a deliberate suite decision once it sits beside its matching toilet and basin, which is why the batch instruction above matters more on villa work than on any other line item.
Ordering through a project supplier
Bidets are rarely worth a standalone order. They arrive as part of a larger fit-out, and that is where a bathroom sanitary fixtures range inside a wider supply package saves coordination effort: the same order can carry the ceramics, the kitchen cabinets and hotel appliances, the wall and ceiling finishes and the loose furniture, all released against one project schedule.
The catalogue notes that bulk wholesale and project customisation are supported for this product family. In practice that means you can raise colour and finish questions, quantities per room type, and packing for container loading at the same time as the technical sheet. If your project requires custom and OEM work on other elements, keep the ceramic standard unless there is a clear design reason to change it — customising a mass-produced sanitary item is rarely where the budget returns value.
Before any shipment leaves, confirm three things in writing: the dimensioned technical sheet for 1038F matches your drainage setting; every ceramic item in a room type is on one batch; and the tapware, seat and waste parts are listed as included or excluded. Those three confirmations close out the specification.
To request the current technical sheet and pricing for Floor Standing Bidet 1038F and the rest of the 1038 series, contact SANTERSON through the contact page.