A swim spa has to work twice over for a villa or resort site: it is a lap pool in the morning and a hydrotherapy spa in the evening, and it sits outside all year. That dual duty is exactly why overseas buyers keep asking us about the Outdoor Swim Spa WS-115EⅢ-U. Below is how we take that unit from an enquiry email to a commissioned spa on site, and what you should pin down at each stage when you buy direct from a Chinese manufacturer.

What the WS-115EⅢ-U actually is

The model sits in our configurable outdoor swim and hydrotherapy range. The catalogue shell measures 5280 × 2200 × 1250 mm, which puts it in the compact-to-mid band of the range: long enough for a genuine swimming stretch, narrow enough to sit on a terrace, deck or courtyard where a full pool would not fit.

The equipment list published for this configuration is specific, and you should read it as a starting point rather than a fixed specification:

ModelWS-115EⅢ-U
Catalogue dimensions5280 × 2200 × 1250 mm
Control system1 set
Water pump3 pcs
Filter pump1 pc
Jet total24 pcs
LED lights2 pcs
Total power9.65 kW
Features shownWater jets, LED lighting, Ozone
Swim training systemNot listed for this configuration

Two things in that table deserve attention before you compare prices with any other supplier. First, total power of 9.65 kW means the electrical supply at your site is part of the decision, not an afterthought — single-phase or three-phase, circuit capacity and the location of the isolator all need confirming locally. Second, this configuration does not list a swim training system. If counter-current swimming is the reason you want a spa rather than a hot tub, say so in your first enquiry; other models in the same range are specified with that equipment.

Step 1: Send drawings, not just a model number

The most expensive mistakes in overseas spa procurement happen because the buyer sent a model number and the factory quoted exactly that. Send the site information with it: a plan or photo of the intended location, the finished floor level, how the shell will be approached for delivery, whether the spa is to sit above ground, semi-recessed or on a plinth, and what your local power supply looks like.

With that, our design team can confirm whether the standard 5280 mm shell suits the space or whether you should look at a longer unit in the range. Our interior design services cover layout planning, 3D visualisation and product specification for exactly this kind of coordination, which matters more on a villa or hospitality project than it does for a single residential sale.

Step 2: Lock the configuration line by line

Catalogue-listed options for this product family include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each one changes the quote, the shipping volume and the commissioning work on site. Work through them explicitly:

  • Heat pump — determines whether the spa is a year-round facility or a warm-weather one, and it drives your running-cost conversation with the end client.
  • Insulation — matters for the shell and the cabinet in cooler climates; it is cheap to specify at production and expensive to retrofit.
  • Filtration — the catalogue lists a filter pump and ozone; sand filtration is an option to discuss if the site expects heavy or public use.
  • Steps and access — decide whether steps are built into the deck or supplied with the spa, because it affects both the quote and the civil works.
  • Swim training system — confirm in writing whether it is included on your configuration, since this model's published list does not show it.

Ask for the final specification as a written equipment schedule with quantities and power ratings. That document, not the brochure page, is what you sign off — and it is also what your local electrician and plumber will work from.

Step 3: Factory checks that cost you nothing

We have manufactured furniture and building materials since 2008, and the same discipline applies to spa shells as to cabinetry or outdoor furniture: verify the shell material and lamination, the cabinet structure, jet placement and the control panel before anything is crated. Request photographs and a video of the completed unit with its serial plate visible, plus a filled-and-tested run showing the jets, lighting and filtration operating. For a project buyer, ask us to include the commissioning record in the shipment file.

If you are buying under your own brand for a dealer network, our OEM furniture manufacturing service covers bespoke finishes, branding and packaging, with flexible order quantities.

Step 4: Freight, customs and the delivery address

A spa shell is bulky, heavy and fragile at the corners, so packaging and container loading plan are worth more attention than the freight rate. Our logistics service handles sea, air and rail forwarding, commercial invoices, packing lists, certificates of origin and import paperwork, plus door-to-door delivery to the site address.

Confirm three items before the container is booked: Incoterms and who pays duty, whether the delivery vehicle can physically reach your site, and who unloads. A 5280 mm shell arriving on a narrow residential street with no crane access is a real and entirely avoidable problem.

Step 5: Installation and handover

Set-out, base preparation, electrical connection and commissioning are where the warranty conversation starts. Our installation and after-sales support covers on-site installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance. Ask us for the operating and maintenance manual in English with the shipment, and get a written commissioning sign-off from whoever energises the unit — that record protects you if a component fails later.

When this model is the right choice, and when it is not

The WS-115EⅢ-U makes sense where space is limited but the client still wants jets, lighting and a real swimming length rather than a soaking tub. It suits villa terraces, courtyard villas, boutique hotel gardens and resort plots with constrained setbacks.

Look elsewhere in the range if you need counter-current equipment as standard, or if the site calls for a footprint that does not match the standard shell at all. In those cases our Customizable Shape Outdoor Spa is built to square, round, oval and curved designs on a reinforced acrylic shell, so the geometry follows the space instead of the other way around. Browse the full Swimming Pools and Swim Spas category to see the dimensions available before you commit.

A note on figures: the dimensions, jet count, pump quantities and 9.65 kW power shown above are the catalogue values published for this configuration. Treat them as the basis for a confirmed specification — included equipment and electrical requirements vary with the options you select, and we will restate them in the signed equipment schedule.
Send us the site plan, your preferred configuration and your delivery address, and we will quote the Outdoor Swim Spa WS-115EⅢ-U as a complete package: shell, equipment schedule, packaging plan and door-to-door freight. As a China-based manufacturer of furniture and building materials, SANTERSON supplies the spa alongside the outdoor furniture, flooring, cabinetry and finishes around it, so one supplier carries the whole outdoor living scope. Contact PHILLIP on +86-13928214007 (phone/WhatsApp) or santerson@qq.com to start.