On a drawing, a shaker panel wardrobe looks almost too simple to matter: a centre panel sitting inside a square frame, in a finish meant to match the rest of the joinery. That simplicity is exactly what makes it a useful test of a supplier. There is no ornament and no heavy moulding to hide behind — once the doors are closed and the room is lit, an uneven rebate, a soft edge or a mismatched sheen is all your client will see. Here is what we would ask any supplier to prove before you commit a wardrobe package to them.
1. Do they build to your openings, or only to a catalogue?
Ask straight out whether sizing is made-to-measure or restricted to fixed widths and heights. Our shaker panel wardrobe is built to project-specific dimensions, with the layout, materials and finish specified room by room — a ceiling-height run in the main bedroom, a shorter unit with a shelf above the door elsewhere. A supplier who answers with a standard size chart is selling casings that someone will have to scribe, pack out or trim on site, and that kind of adjustment always leaves a trace.
2. Which panel construction sits behind the price?
The same elevation can be built three ways: a frame with a loose centre panel, a single moulded door that imitates the profile, or a flat panel cut on a CNC router with trim applied afterwards. They age differently and they cost very differently, so ask which one is being quoted and request a photograph of the door edge in cross-section. Within our Classic Paneled Wardrobes range you can put related options side by side — Raised Panel Wardrobes, Recessed Panel Wardrobes and Decorative Moulded Paneled Wardrobes — to see how much profile depth and edge break change the finished look before you fix a specification.
3. Can they finish it in your colour system, not theirs?
Panelled doors most often go wrong at the finishing stage. The frame and the centre panel come from different stock, then pass through the same spray or lamination line, and any difference in sheen or in how the grain reads shows up under side light. Ask which finishes the factory applies in-house — lacquer, wood veneer, melamine, acrylic — and ask for a sample of the finished door rather than a flat board offcut. We send finished door samples so the sheen can be checked against the kitchen or vanity cabinetry on the same job, where a mismatch is what your client notices first.
4. Is the interior layout designed, or just filled with shelves?
Send the storage brief — hanging lengths, number of drawers, whether an ironing board or a suitcase has to fit somewhere — and see what comes back. A capable supplier returns a layout drawing showing hanger heights, drawer positions, provisions for interior lighting, and how the carcass meets the skirting and the ceiling line. If the reply is simply a price "as shown", the interior will be decided on site, and that is where variation orders start.
5. Who reconciles the joinery with everything else in the room?
A wardrobe shares its walls with doors, architraves, flooring, skirting and lighting, and those packages are often bought separately. Ask who verifies site dimensions, who issues coordinated drawings, and whose responsibility it is when a door swing clashes with a drawer run or a handle lands on a switch plate. Our interior design service covers space planning, 3D visualisations, production coordination and on-site guidance, so the joinery drawings are checked against the other packages before anything is cut.
6. How does it arrive, and what happens if a panel is damaged?
Panelled doors are among the easiest items in a fit-out to damage in transit, particularly at the corners of the frame. Ask how doors are packed and protected, whether panels travel loose or assembled, who prepares the shipping and customs paperwork, and what the route is when one door arrives chipped. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, packaging and container loading, shipment tracking and the paperwork side of import; installation and after-sales support then covers on-site installation, inspection and snag lists. Whoever you buy from, confirm freight terms, duties and transit times for your own port in writing before the order is placed.
A short pre-award checklist
| Ask the supplier | What a convincing answer looks like |
| Sizing basis | Made-to-measure to your openings, with dimensions verified on site |
| Door construction | The named method, plus a cross-section photo of the door edge |
| Finish range | Finishes applied in their own factory; finished door sample; sheen matched to other joinery |
| Interior layout | A drawing drawn from your storage brief, including lighting provision |
| Coordination | A named person checking joinery against doors, flooring and lighting |
| Delivery and after-sales | Written packing method, tracking, snag inspection, replacement route for damaged panels |
Three questions buyers ask us
Do you supply wardrobes only, or the wider joinery package?
As a furniture and building materials manufacturer, we make built-in furniture alongside kitchen cabinetry, interior doors, wall panelling, flooring, lighting and bathroom products. Wardrobe doors can therefore be finished to match the rest of the fit-out from one production run, instead of being colour-matched across three factories.
Can you reproduce a detail we already have?
Send a dimensioned sketch or a close photograph of the door you are working from. We work from your profile dimensions and finish reference rather than pushing a house pattern, and the detail is confirmed with a sample before production starts.
What do we need to send to get a quotation worth comparing?
Room elevations with finished floor and ceiling levels, your interior storage layout, the material or finish reference, and the delivery location. With those four items a price can be built on the actual construction rather than on an allowance, which is what makes two quotations comparable.
SANTERSON has been manufacturing furniture and building materials since 2008, and works with homeowners, builders and project buyers on custom-built joinery — from drawings and samples through production, delivery and installation support. Send your room elevations and storage brief and we will quote the build you actually need.