A swim spa on a hotel site has to earn its floor area. Guests expect lap swimming at six in the morning and a jet massage at ten at night, while the operator has to fit both into a terrace, courtyard or rooftop that was never designed as a pool plant room. Outdoor Swim Spa WS-130Aⅴ sits in the middle of our configurable swim and hydrotherapy range, and it is the model we most often specify when a hotel fit-out needs one vessel to cover exercise, therapy and a bit of evening theatre. The following is how we walk procurement teams through choosing it — and where a different model in the same family is the better answer.
What the catalog specification actually says
Before any site discussion, put the published figures in front of the architect. The catalog lists WS-130Aⅴ at 8000 × 3000 × 1400 mm, with one control system, one swim training system, one water pump, one filter pump, a total of 20 jets and seven LED lights. Total power is listed at 10.85 kW.
Two things in that list change the drawing. A width of 3000 mm is wide enough for guests to move side by side and for staff to clean a shell without squeezing, which is why this footprint reads better in hospitality than the narrower 2200 mm units in the same range. And an overall length of 8000 mm means the swim station and the jet seating share one water volume rather than sitting at opposite ends of a long channel — a compact arrangement that suits tight hotel plots, but one you should test against your own guest profile before signing.
Catalog figures describe the standard build. Included equipment and electrical requirements vary with the selected configuration, so confirm both against the quotation for your project rather than against this page.
Match the shell to the room it lands in
The first decision is not about jets; it is about whether 8 m × 3 m fits the slab, the access route and the crane or lift path. In a hotel fit-out we ask for three drawings before quoting: the terrace or courtyard layout with dimensions, the plant and electrical run from the switchroom to the spa position, and the delivery route from street to position. A unit that cannot be moved into place on day one is not a specification problem — it is a programme problem.
Depth of 1400 mm is comfortable for standing exercise and for seated soaking, and it keeps the water volume manageable for heating and treatment. If your team plans to sink the shell into a deck so guests sit at water level, that depth also keeps the surrounding parapet and seating detail simple.
Decide how much swimming the hotel really needs
WS-130Aⅴ carries a swim training system as standard equipment in the catalog, which is what turns it from a large spa into something guests can swim against. In practice, a hotel should be honest about usage. A business property with early-morning lap swimmers benefits from that station. A leisure or spa-led property where most use is jet seating and short dips does not need to pay for resistance hardware that runs twice a week.
That is where the sister model earns its place. Outdoor Swim Spa WS-130Aⅴ-U keeps the same 8000 × 3000 × 1400 mm envelope but changes the internal balance: four water pumps, 23 jets and five LED lights, with total power listed at 11.85 kW, and no swim training system recorded in its captured specification. Same hole in the deck, different emphasis — more jet capacity for a spa-first property. Choosing between them is a question about your guests, not about which number looks better on a brochure.
Treat water treatment as an operating decision
Ozone is shown as a feature of this model, and for a shared hotel vessel that matters more than it does in a private villa. Ozone reduces how much the operator leans on residual disinfectant, which is what guests notice as harsh smell and red eyes after an evening soak. UV sterilization, sand filtration and additional water pumps appear in our catalog as options across the swim spa range; availability and compatibility vary by model, so we confirm each item for the specific unit being produced.
Ask your team two practical questions at specification stage: who will run the daily test-and-log routine, and where on site the consumables are stored. A hotel that has never operated a jet vessel needs the maintenance walk-through written into handover, not improvised after opening.
Specify the options around the shell, not just inside it
Insulation and a heat pump belong on the list for any property where guests swim outside of summer months; without them the heating bill becomes an argument with the finance team. Steps are not a cosmetic extra either — they set how children and older guests enter, and they affect the deck edge detail. Control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps all appear as catalog-listed options for this range.
Seven LED lights in the standard build give you more than a night-time glow. Zoned lighting is how a rooftop spa reads as an evening feature from guest rooms and from the bar terrace, and it lets staff drop to a low level after the last swim without shutting the whole vessel down.
Do not specify the water in isolation
A swim spa is one line in a much larger outdoor package. Guests experience the pool deck as a whole: the loungers beside it, the shade structure, the lounge seating that carries conversation after dinner. When we furnish hospitality sites we group the swim spa with Modern Aluminum Outdoor Sofa Set for Patio, Villa and Hotel and the surrounding loungers and dining sets in one production run, so frames, powder-coat colours and cushion fabrics are drawn from the same batch instead of matched after the fact across separate orders.
That grouping is also where commercial flexibility shows up. Custom finish, fabric and dimension are supported for hospitality and commercial orders, which means the spa surround and the seating around it can be resolved as one detail rather than three compromises.
Book the swim spa inside the wider fit-out programme
The most expensive mistake in a hotel project is letting the wet-side equipment arrive on a different schedule from joinery, flooring and lighting. We work as a hotel furniture and fit-out supplier across furniture, interior fixtures and building materials, so the swim spa shell, the deck finishes, the cabinetry in the changing area and the loose outdoor furniture are produced under one programme with one set of shipping documents. As a one-stop project furnishing supplier we cover design consultation and space planning, material selection and product specification, manufacturing and quality control, then logistics, site coordination and handover.
For procurement teams that means a single point of contact for the whole wet-and-dry scope, and one place to reconcile substitutions when a client changes their mind about a stone or a fabric at shop-drawing stage.
A short checklist before you commit
- Confirm the 8000 × 3000 × 1400 mm envelope against the slab, the access route and the lifting path.
- Confirm total power of 10.85 kW against the switchroom capacity — or move the electrical upgrade earlier in the programme.
- Decide swim-first (WS-130Aⅴ) or jet-first (WS-130Aⅴ-U) based on how guests will actually use the vessel.
- Price insulation, heat pump, steps and any extra filtration for the exact unit being built, not for the range in general.
- Put the maintenance walk-through into the handover documents with a named owner on the hotel side.
- Order the spa surround furniture in the same production run so finishes match.
If you are specifying for a hotel fit-out now, send us the terrace layout and the target opening date. We will come back with the configuration that fits both — model, options and lead time — rather than a catalogue page and a hope.